Summary
Overview
Work History
Education
Skills
Projects
Certification
References
Timeline
Generic
Nur Asyikin Ghazali

Nur Asyikin Ghazali

Engineer
Perai,Penang

Summary

Started a career as a Software Test Engineer at UST Global, based at Motorola. Then, worked as a Product Development Engineer at Intel for 2 years, gaining experience in executing TTR, analyzing high-volume data, and ensuring that Vmin and binsplit met the Product Health Indicator (PHI) requirements. Currently, working as a Test Engineer at Syntronic, also based at Motorola, specializing in executing scripted tests (manual and automation) and identify errors before releasing products to customers.

Overview

7
7
years of professional experience
4
4
years of post-secondary education
4
4
Certifications

Work History

Test Engineer

Syntronic
06.2024 - Current
  • Perform daily testing on new software versions (MCL and Offramp) for Motorola’s radio communication systems, ensuring they meet functional and performance specifications.
  • Conduct manual and automated tests on Android-based radio platforms, ensuring that applications and firmware are stable and integrate smoothly with mobile hardware.
  • Collaborate closely with developers to communicate defects and provide feedback for iterative improvements during the development lifecycle.
  • Analyze logs and traces to identify, isolate, and document issues related to radio software performance and functionality.
  • Report and track defects using JIRA and coordinate with cross-functional teams to resolve critical issues before production deployment.
  • Perform regression and compatibility testing for new releases across various Android versions and Motorola hardware platforms.

Product Development Engineer

Intel
Bayan Lepas, Penang
11.2021 - 10.2023
  • Ensure the test program is meeting product health indicator (such as low defect per million rate, low test time, good yield, high bin split) before passing over to factory product engineering group for high volume manufacturing.
    Engaged and resolving hardware and software testing issues for product manufacturing until product end of life (EOL).
  • Analyze early customer returns with emphasis on driving test hole escapee closure activities.
    Performing design of experiment (DOE) to debug and evaluation for root cause and resolution effectiveness.
    Analyze high volume data and drive PHI (product health indicator) improvement activities like test time reduction and yield improvement.
  • Driving test initialization time reduction analysis and engaged with Module owner on methodology to reduce test time execution of the product which reduce overall product’s cost.
  • Define and draft the roadmap to meet the goal which set by upper management in each quarter.
  • Preparing final analysis reports for the stakeholders on decisions making.
  • Great participant to work with various teams from Malaysia, India and US for product & design development and evaluation for manufacturing capability projects.

Software Test Engineer

UST Global (based in Motorola)
Bayan Lepas, Penang
01.2020 - 04.2021
  • Execute regression scripted test cases for Motorola Tetra radio based on feature requirements including IOP Test cases from Germany
  • Perform Submission Record for fault log purposes
  • Investigating customers issues regarding faulty of the radio
  • Perform fault/issue validation after code fixed is integrated to the MCL (main code line)
  • Communicate with developers and subject matter experts (SME) to fix and narrow down the cause of the defects
  • Responsible for designing and implementing test to ensure quality and functionality of a product
  • Experience in executing stress test and expert test in agile methodology
  • In depth knowledge in antenna telecommunication and box testing
  • Analyses software requirement to determine feasibility of design within quality assurance and time
  • Perform system integration of software and hardware to maintain throughput and program consistency.

Electrical Engineer Intern

Tenaga Nasional Berhad
Sungai Petani, Kedah
02.2018 - 05.2018
  • Work in TNB distribution that operated in high and low voltage which are 11kV to 415V
  • Assist contractors in preventive maintenance
  • Preventive maintenance is process of taking care of the equipment in the substation, making the equipment last long
  • Check the number of loads (power consumption) in the substation
  • Work inside PMU, PPU and PE during internship
  • Learn and analyses how the equipment like transformer works and how to maintain it
  • Perform a few cables works such as jointing, crimping, stripping and termination, witness maintenance operation(shutdown) substations
  • Follow the meter department to handle the new installation of single-phase meter and three phase meters.

Education

Bachelor In Electrical and Electronics Engineering (Hons) -

Universiti Tenaga Nasional
09.2015 - 09.2019

Skills

Matlab & Simulink

Proteus

CPS (customer programming skill)

MPlab

Assembly Language

Hercules

Vatch

Trace

Aqua

Crystal ball

JMP

Microsoft Office

Jira

Testrail

Unix

Basic C programming

Basic Python

Manual Testing

Automated Testing

ATE

Projects

FYP Project: Development of an intelligent controller for Solid State Fault Current  Limiter 

This project deals with modelling and simulations of custom power devices, namely solidstate fault current limiter (SSFCL) with an intelligent controller of Fuzzy Logic Controller  (FLC). The modelling device for SSFCL of FLC is based on graphical models using simulation  program MATLAB SIMULINK. The used of SSFCL was also developed to achieve quicker disruption and restriction of fault  currents, respectively, and with the help of FLC. The system can optimize efficiency without any delay. The SSFCL of FLC simulation findings indicate that it is an appropriate tool to reduce the  fault current to the system's tolerable limit.


Assembly language project 

The task is to write the coding in Assembly language using MPLAB software and design  sensors in the toilet using PROTEUS software. It consists 4 sensors (movement, fan, light and day & night). It involves high interrupt system and pulling method in this project. All the inputs and outputs must be configured in the program which are the 4 sensors and the  switches. In Proteus, the sensor is represented as LED lights in the schematic diagram.  The inputs and outputs are connected at the microprocessor port B and D respectively.


Capstone Project: Design a theme park

Work in a group of 5 people to synchronize all the ideas to achieve the objectives. A theoretical engineering design to build a theme park based on 4 technical scopes which are Power System, Communication System, Renewable Energy System and Security Monitoring System. My task is in a security monitoring system, where I need to find an Eco-green solution and ideas for my theme park. My solution is to replace the normal bracelet tag to RFID bracelet tag. The rate of investment has also been calculated to get the rough idea of profit that we will earn. Next, my idea is using wireless surveillance camera that suitable in outdoor areas. Furthermore, LED light is used in the theme park to make it more environmentally friendly and long lasting.

Certification

Board of Engineers Malaysia

References

Name: Ng, KY

Position: Former Manager

Test Program, Fuse,

Product Health Indicator at

DDG Intel Penang

Phone: +6012-4776132

Email: kyngpn@gmail.com


Name: Tan, Wee Chuan

Position: Manager

Product Health Indicator

at DDG Intel Penang

Phone: +6012-7642238

Email: wee.chuan.tan@intel.com

Timeline

Test Engineer

Syntronic
06.2024 - Current

Product Development Engineer

Intel
11.2021 - 10.2023

Software Test Engineer

UST Global (based in Motorola)
01.2020 - 04.2021

Electrical Engineer Intern

Tenaga Nasional Berhad
02.2018 - 05.2018

Bachelor In Electrical and Electronics Engineering (Hons) -

Universiti Tenaga Nasional
09.2015 - 09.2019
Nur Asyikin GhazaliEngineer