I am a registered Professional Engineer as Chartered Engineer (CEng) – Engineering Council UK,
Professional Technologist (Ts.) – Malaysian Board of
Technologists (MBOT) and Professional Engineer (Ir.) – Board of Engineers Malaysia (BEM).
I graduated from UTM Skudai, Malaysia, with a Bachelor's Degree in Electrical-Mechatronics Engineering and have nearly 22 years of experience in Instrumentation and Control (I&C) Systems. My career spans multiple industries, including heavy machine manufacturing, semiconductor and photovoltaic, rolling stock engineering, facilities management and oil & gas.
I am an Instrumentation engineering professional with commitment to high standards and delivering results. Known for designing and optimizing control systems to enhance operational efficiency. Reliable team collaborator with focus on adaptability to meet changing project needs. Possesses strong analytical skills and effective communication abilities valued by employers.
Malaysia Board of Technologists– Reg No PT25040110
My DIY repair hobby has quite a few strengths:
PETRONAS Chemicals Fertiliser Kedah, Gurun, Malaysia
• Project AQUA - EPCC Waste Water Treatment Plant Improvement
• EPCC Bagging Machine Rejuvenation
• PCC 61-PV-11 NH3 Supply CV Upgrade
• EPCC PUREBLUE Project
• EPCC Totalizer upgrade at Methanol Tanker Loading
• Urea Reactor Leak Detection Monitoring System
• EPCC New LT at E-15-02
• Thermocouple & TT installation at R-18-01
• New LT at Methanol day Tank T-61-03A/B/C
• New Pump P-26-07A/B with VSD installation
• New PDF Air Compressor K-61-02
• New UET Air Compressor K-86-01B
• New Passivation Air Compressor K-33-01A/B-01
• New Plant Air Compressor K-57-02
• CO2 & Moisture Analyser at NGU
• Silica Analyser at Mixed Bed Polisher
• pH Meter 51-AT-56 at WWT Guard Pond
• Ammonia Analyser at WWT FDP1
• Urea Grade PT at Urea Synthesis 33-PT-15 & 33-PG-15
• Totalizer (Coriolis FT) installation at MeOh & NH3 Tanker Loading
• New DPT type FT for Steam ELMS
• PDF Allen Bradley PLC5 to Controllogix upgrade
• Weighing Controller Upgrade for Bagging System
• MOVs feedback signal to DCS
• FT, PG & TG installation for CEPSO Scrubber monitoring
• Knocker Installation at Granulation Hopper
• Allen Bradley SCADA to Yokogawa DCS migration at Urea Export Terminal
• Urea Grade CV Replacement 33-HV-02
• Reformer BMS (Methane Analyser, Venting System & Start up logic)
• New CV 13HV03 Installation
• Low level trip at Final Gas Separator (V-15-04)
• Ammonia Flare Improvement
Gas Processing Kerteh, PETRONAS Gas Berhad ,Kerteh, Malaysia
• EPCC GPK Instrument Air Compressor and Air Dryer Package Upgrade
Utilities Kerteh,PETRONAS Gas Berhad,Kerteh, Malaysia
• Project ELPIS - EPCC Installation of new IA Compressor Package, Custody Metering and WWT rejuvenation
PETRONAS Chemicals Ethylene PolyEthylene (PCEPE), Kerteh, Malaysia
• Project PANDAN - BED of IA Compressor Package
• EPCC K-440 Blower Train 1&2 Upgrade
PETRONAS ASEAN Bintulu Fertiliser, Bintulu, Malaysia
• IPF Improvement project
• Flame detector for Start Up heater
• Force Draft & Induced Draft Fan damper actuator Replacement
• Hydraulic XV-05001 & 06001 Replacement
• HP Trip Logic at Urea Synthesis (2oo3 Urea Grade PT)
• Siemens S5 to S7 PLC upgrade BUS Reclaimer Scrapper
• Radioactive LT-22001 installation
• FT for Urea Carbamate discharge 23P001
• Ammonia Tank 81-PV004B & 81-PV008B replacement
• Hydraulic XV-05001 & 06001 Replacement
• HP Trip Logic at Urea Synthesis (2oo3 Urea Grade PT)
• Siemens S5 to S7 PLC upgrade BUS Reclaimer Scrapper
• Radioactive LT-22001 installation
• FT for Urea Carbamate discharge 23P001
• Ammonia Tank 81-PV004B & 81-PV008B replacement