

Dynamic Regulatory and Government Affairs professional with extensive experience in the telecommunications sector, currently serving as a Specialist in Regulatory and Government Affairs at EDOTCO Malaysia Sdn Bhd. Expertise includes managing government liaison and regulatory engagement with key public sector stakeholders, including the Malaysian Communications and Multimedia Commission, local authorities, and state agencies. Proficient in navigating complex regulatory frameworks, coordinating cross-agency collaborations, and facilitating necessary approvals to support the deployment of telecommunications infrastructure. Proven track record of fostering strong relationships with regulators and public sector entities to ensure compliance, streamline project implementation, and enable the efficient rollout of network infrastructure.
Accomplishments:
Accomplishments:
Accomplishments:
Malaysia Skills Certificate Programme – Telecommunication Certification
· Executed marketing strategy and strategic plan for program implementation, create stakeholder relationship in building up the confidence and trust, ensure project completion by meeting arrangement and client events.
· Delivered risk management technique to determine the action plan needed to encounter the risk with analysis, synthesis, deduction, and analogy method of Corporate Performance Management.
· Executed SWOT analysis in implementation of new program and Quality Control of training programme.
· Developed Telecommunication Engineering College (TEC) as the leading Telco college and the centre of Telco excellence under Department of Skills Development Malaysia (DSD) together with a team of trainers and marketing.
· Boost up the Sales and Marketing of short courses, training programme, recruitment of participants, Pearson certified examination, and counselling thus generating new revenue for the company.
· Established corporate connection by signing the memorandum with NAZA Communications Sdn Bhd as collaboration partner of NURI programme:
o https://www.bharian.com.my/node/295684
o https://www.digitalnewsasia.com/digital-economy/naza-communications-bridges-connectivity-local-communities-nuri-programme
· Achieved multiple collaboration and memorandum signing with Majlis Belia Malaysia (MBM), Universiti Teknologi MARA (UiTM), Universiti Malaya (UM), and Malaysia Communication & Multimedia Commission (MCMC) for programme partnership.
· Achieved 100% setup requirement of an accreditation centre under Jabatan Pembangunan Kemahiran (JPK)
Yayasan Peneraju Pendidikan Bumiputera Skil Iltizam
· Consulted the management and technical team in train and placement programme to achieve successful delivery of 400 participants.
TalentCorp Graduate Upskilling Programme – Telecommunication Upskilling
· Executed strategic planning through Microsoft Project and Microsoft Excel for Work Breakdown Structure assignment.
· Deliberately delivered the project management with waterfall technique through 10 programme intakes.
· Successfully delivered technical training in Telecommunication module of network architecture, parameter optimization, soft skills and management techniques with feedback rating of 4.5 out of 5 on average from 1000 feedbacks.
· Gained revenue for the company through job placement scheme under Economic Transformation Programme with 100% job placement of 400 participants.
· Slashed 20% on operation expenses through contract negotiation with multiple stakeholders.
· Successfully executed Corporate Social Responsibility (CSR) Program for orphans from rural areas.
· Lead the team for project bidding for 2015 and 2016 intake of the training programme with presentation of a new concept of Training Need Analysis for future programme.
· Carried out progress monitoring of the program and constantly review the performance of the programme participants during attachment with host company and achieved high satisfaction by multiple stakeholders.
· Carried out budget alignment, profit and loss analysis for every running intake of participants of the programme.
· Performed scheduling and progress tracking of the training programme including resources, tools and equipment, training rooms, and materials.
· Delivered bi-weekly, monthly, and quarterly report for the training programme sponsor including invoice and documentation audit.
· Achieved 100% deliverables required by the sponsor for employability and training delivery.
Celcom – Nokia Solution Network LTE Single Site Optimization
· Deliberately executed preparation, planning, implementation, monitoring & controlling project’s contractual scope, budget, reports and presentation with the application of Microsoft Excel and Microsoft Project.
· Executed project plan, define project scope, secure the necessary resources and monitor all engineering activities with waterfall project management technique.
· Performed resource and tools allocation in order to fulfil project requirements of resource management.
· Successfully scheduled and progress tracking of the project in fulfilling the client’s SLA for engineering reports through project activities tracker, monitor and perform project control changes, conflicts and critical issues through risk management and maintain good stakeholder management.
· Improvise the quality of the produced report and the project delivery from end-to-end on-time as per contractual obligations.
· Achieved approval of 20 reports through COA with customer satisfaction for project closure.
· Conducted debrief session to capture lessons learned and root cause analysis for continuous improvement.
· Carried out OSS KPI monitoring and parameter optimization for LTE network KPI statistics report with the application of Netact.
· Generate customer satisfaction while preserving in the project and company through analysis, synthesis, deduction, and analogy method of Corporate Performance Management.
· Achieved 100% deliverables with respect to invoicing for the company finance process.
Huawei – Maxis Missing Layer / 2G New Site East Malaysia and KV AFS Project
· Carried out 2G and 3G log file analysis with the application of Genex Assistant in completing the report according to the agreed dateline.
· Carried out 2G new site report and achieve the completion of the pending punch list with the application of Genex Assistant and Microsoft PowerPoint.
· Performed call failure and drop analysis throughout each of the drive test logs with in depth analysis of the coverage and quality degradation which happened to the planned new sites.
· Consulted the solution and recommendations of soft parameter or physical changes that need to be optimized for the poor performance site.
· Completed multiple Pre-Drive Test reports, Verification Drive Test reports, Post Drive Test reports, and Post Optimization Drive Test reports with coordination of 50 Drive Test teams for the client in solving all of the report issues submitted to Maxis.
· Slashed the operation expenses by resource management and contract negotiation for each different projects in fulfilling the corporate revenue requirement.
· Demonstrated as the first contact point of the client in technical support and high-level management decision making consultation.
· Achieved 100% deliverables with respect to invoicing for the company finance process.
Huawei – Maxis VIP Customer Complaint Klang Valley
· Coordinated 7 Drive Test teams to perform wireless measurement within the complained area as given by the cluster owner and achieved 100% complaints resolved within SLA.
· Carried out 2G, 3G, and LTE log file analysis with the application of Genex Assistant and consultation with cluster owner for improvement in solving the customer complaint through parameter optimization by U2000.
· Performed report preparation for Maxis after the issue affecting the customer had been solved and successfully received 100% report approval.
· Achieved 100% deliverables with respect to invoicing for the company finance process.
Huawei – Celcom 3G Northern SSO
· Executed strategic planning through Microsoft Project and Microsoft Excel for Work Breakdown Structure assignment.
· Deliberately delivered the project management with waterfall technique for the completion of 43 sites completed within one-month timeline.
· Carried out Single Site Optimization, Consistency Check with Neighbour relation, and Network Performance Monitoring.
· Coordinated 3 Drive Test teams and perform RF optimization for missing neighbour and pilot pollution.
· Carried out log file analysis with the application of Nemo Analyze and consulted RF KPI tuning with the client in improving the RF performance.
· Achieved zero failures in network KPI statistics for CS and PS counters for 43 sites.
· Delivered SSO reports to Celcom Regional and Central HQ with 100% acceptance rate.
· Delivered ESAR claim checklist and ensure the client could get a signoff for the COA from Celcom by maintain a good stakeholder management.
· Achieved 100% deliverables with respect to invoicing for the company finance process.
Huawei – Celcom LTE Northern SSO
• Executed Single Site Optimization engineering, Prediction Plotting by Netact Planning Tools, Consistency Check with neighbour relation by M2000, and Network Performance Monitoring by iPRS.
• Carried out log file analysis with the Application of Nemo Analyze and consulted RF KPI tuning with the client in improving the RF performance.
• Delivered SSO reports to the client with in depth analysis of static and mobility test summary including abnormal release, call failure, and poor signalling quality.
• Coordinated the resources for engineering works and compile the checklist of Site Design Package for the client.
• Delivered SSO reports to Celcom Regional and Central HQ with 100% acceptance rate.
• Consulted the client with troubleshooting of poor LTE coverage area (indoor coverage) with walk test analysis and recommendations for Celcom to improve the coverage.
• Delivered ESAR claim checklist and ensure the client could get a signoff for the COA from Celcom by maintain a good stakeholder management.
• Achieved 100% deliverables with respect to invoicing for the company finance process.
Project Title
Achievements
1. Maxis Nationwide Benchmarking (Engagement with Alan Dick & Company (M) Sdn Bhd)
· Achieved to deliver 100% nationwide network benchmarking for Maxis within 6 months and issues that arise during drive test by log file analysis.
2. Celcom – Nokia Siemens Network Pre-Launch Optimization Project
· Achieved 66 sites (100%) signed COA of Drive Test and RF optimization including SSV and SSO reports with all KPIs and justifications approved.
3. Maxis Benchmarking Project
· Achieved 100% deliverables with respect to invoicing for the company finance process.
4. DiGi Gunhill Project
· Achieved completion of the Drive Test for Gunhill area which is 10km in radius together with KPI report within stipulated timeline.
5. DiGi IBC Installation Project
· Achieved to deliver 12 new site (100%) installation coverage Walk Test reports within timeline.
6. Huawei – DiGi IBC 3G Project
· Achieved to deliver 53 IBC sites (100%) report all KPIs of Walk Test and preliminary analysis approved.
Bachelor (Hons) Of Electrical and Electronic Engineering
NIOSH-TM Safety Passport NIOSH 2016
Working At Height 2016
Vocational Training Officer 2016
Malaysia Skills Certificate – Radio Frequency Network 3 2016
Malaysia Skills Certificate – Radio Frequency Network 2 2016
Malaysia Skills Certificate – Radio Frequency Network 1 2016