Summary
Overview
Work History
Education
Skills
Affiliations
Work Availability
Accomplishments
Work Preference
Languages
Interests
Timeline
Hi, I’m

Isma Rashid Alimon

Senior Engineering & Project Manager
Puncak Alam,'Selangor
Success is not final; failure is not fatal: It is the courage to continue that counts.
Winston S. Churchill
Isma Rashid Alimon

Summary

Skilled senior engineering & project manager builds and motivates high-performing engineering team. Over 20 years of experience in various industries (EMS, Molding, Wafer Fab, Steel Press, Aluminum, Drinks & Poultry working with 13 projects. Committed to rapidly and efficiently completing projects by leveraging team-based frameworks to best leverage available engineering talent.

Energetic senior engineering & project manager enthusiastic about developing deeper understanding of engineering design and leadership. Natural leader and networker with hardworking, resourceful and competitive nature. 20++ years of experience in 10 manufacturing plants.

Overview

29
years of professional experience

Work History

DinDings Tyson Sdn Bhd, PERAK

Senior Engineering & Project Manager
09.2022 - 07.2024

Job overview

  • Responsible for overall Management of the Maintenance, Building & Utilities withmanagers direct report
  • Identifies the optimum maintenance strategies and leads the Plant Preventive
  • Maintenance Program;
  • Accountable for Maintenance OPEX and CAPEX budgets and costs of the entire
  • Plant & Building, Machineries & Ground Maintenace
  • Leads initiatives on erection & commission of new equipment and identifies bottleneck project to enhance plant processes and productivity;
  • Ensures compliance with statutory requirement and company’s Health and
  • Safety, Quality and Environmental Management Systems, Policies and
  • Procedures
  • Maintenance Operations :
  • Preventive / Prediction / Repairing Maintenance of Machine:
  • Provide expertise and analysis to the machine maintenance optimization
  • Root-Cause Analysis, predictive maintenance for rotating equipment
  • Responsible for the DTSB requirements are met and update the technical procedures related to rotating equipment
  • Work Experience
  • Enable high performance Operations, providing assets' Maintenance according to the Department Strategy (using TPM as the multi-disciplined approach to maintain/improve fixed assets, and to manage their life cycle)
  • Schedule both internal and external work(s) maximizing planned down time and reducing unplanned downtime
  • Optimize equipment according to standard procedure, enhancing performance and product quality, ensuring the achievement of all Key Performance
  • Indicators (KPIs)
  • Maintain & improve machine efficiency levels
  • Prepare the annual Maintenance budget and forecasts
  • Initiate spare parts management and second sourcing
  • Improvise maintenance operations to save on costs and work time
  • Developing and implementing a (proactive) maintenance program
  • Manage contractors on site to ensure they meet legal and company requirements
  • Operate, repair and maintain building and Plant utility & WWTP systems and equipment in a manner that fully supports building operations and Plant activities
  • Perform preventative maintenance tasks to plant utility ,WWTP & HVAC equipment and systems as required through the FM Maintenance Management program
  • Plan safety training involving external party such as BOMBA
  • Managing Ground Maintenance for administrative buildings & plant such as pest control, landscaping, disposal of waste (following SW criteria)
  • Maintenance & monitoring of security systems ie: CCTV, intruder detector, motion detector)
  • Determine & approve major building equipment maintenance including appropriate action, method & solicitation of quote for repair, spare-parts purchase by schedule both internal & external works
  • Recommend and implement design modifications to systems and equipment to enhance operations
  • Ensure all laws, statutory and regulations relating to electrical systems are comply accordingly (DOSH,DOE ,Suruhanjaya Tenaga, Bomba, local authority etc
  • Project Management
  • Undertake upgrading projects for future expansion
  • Assessed all phases of product lifecycle, including identifying and recommending opportunities for changes to unit stakeholders
  • Managed multiple, large-scale projects across 4 sites
  • Plan, develop & execute new projects set up
  • Work Experience
  • To ensure progress of work in accordance to pre-planned schedule & conduct costing monitoring with relevant financial controlling parties
  • Complete/ Manage new transferred projects deliverables to agreed target
  • Coordinate & host regularly project meeting to follow-up the progress
  • Led cross-functional team in the successful completion of a large-scale engineering project, resulting in a 20% increase in operational efficiency
  • Implemented cost-saving measures by optimizing project timelines and resource allocation, resulting in a 15% reduction in project expenses
  • Developed and executed project plans, managed project budgets, and ensured timely delivery of milestones, resulting in a 95% on-time project completion rate
  • Oversaw the development of new product designs and features, collaborating with stakeholders to ensure alignment with business objectives and customer needs
  • Managed a team of technicians, engineers & manager to ensure timely repairs and maintenance of industrial refrigeration systems, resulting in a 20% increase in system efficiency
  • Implemented cost-saving measures through strategic planning and negotiation with suppliers, reducing annual operating expenses by 15%
  • Oversaw compliance with industry regulations and safety standards, conducting regular inspections and training sessions to promote a culture of safety within the department
  • Developed and implemented preventive maintenance schedules for all refrigeration equipment, resulting in a 30% decrease in unexpected systems failure
  • Head Of Engineering

KJCF Sdn Bhd
Nilai, 05

Head Of Engineering
11.2021 - 08.2022

Job overview

  • Responsible for overall Management of the Maintenance, Building & Utilities
  • Identifies optimum maintenance strategies and leads Plant
  • Preventive Maintenance Program;
  • Accountable for Maintenance OPEX and CAPEX budgets and costs of entire
  • Plant & Building & Machineries
  • Leads initiatives on erection & commission of new equipment and identifies debottlenecking project to enhance plant processes and productivity;
  • Ensures compliance with statutory requirement and company’s Health and
  • Safety, Quality and Environmental Management Systems, Policies and Procedures
  • Maintenance Operations :
  • Preventive / Prediction / Repairing Maintenance of Machine:
  • Work Experience
  • Provide expertise and analysis to machine maintenance optimization
  • Root-Cause Analysis, predictive maintenance for rotating equipment
  • Responsible for Group Technical requirements are met and update technical procedures related to rotating equipment
  • Enable high performance Operations, providing assets' Maintenance according to Department Strategy (using TPM as multi-disciplined approach to maintain/improve fixed assets, and to manage their life cycle)
  • Schedule both internal and external work(s) maximizing planned down time and reducing unplanned downtime
  • Optimize equipment according to standard procedure, enhancing performance and product quality, ensuring achievement of all Key Performance Indicators (KPIs)
  • Maintain & improve machine efficiency levels
  • Prepare annual Maintenance budget and forecasts
  • Initiate spare parts management and second sourcing
  • Improvise maintenance operations to save on costs and work time
  • Developing and implementing (proactive) maintenance program
  • Manage contractors on site to ensure they meet legal and company requirements
  • Operate, repair and maintain building and Plant utility & WWTP systems and equipment in a manner that fully supports building operations and Plant activities
  • Perform preventative maintenance tasks to plant utility ,WWTP & HVAC equipment and systems as required through the FM Maintenance Management program
  • Plan safety training involving external party such as BOMBA
  • Managing Ground Maintenance for administrative buildings & plant such as pest control, landscaping, disposal of waste (following SW criteria)
  • Maintenance & monitoring of security systems ie: CCTV, intruder detector, motion detector)
  • Determine & approve major building equipment maintenance including appropriate action, method & solicitation of quote for repair, spare-parts purchase by schedule both internal & external works
  • Recommend and implement design modifications to systems and equipment to enhance operations
  • Ensure all laws, statutory and regulations relating to electrical systems are comply accordingly (DOSH,DOE ,Suruhanjaya Tenaga, Bomba, local authority etc
  • Project Management
  • Undertake upgrading projects for future expansion
  • Assessed all phases of product lifecycle, including identifying and recommending opportunities for changes to unit stakeholders
  • Work Experience
  • Managed multiple, large-scale projects across 4 sites
  • Plan, develop & execute new projects set up
  • To ensure progress of work in accordance to pre-planned schedule & conduct costing monitoring with relevant financial controlling parties
  • Complete/ Manage new transferred projects deliverables to agreed target
  • Coordinate & host regularly project meeting to follow-up the progress
  • Led a team of 4 Managers & 20+ engineers in developing innovative solutions for complex technical challenges, resulting in a 30% increase in product efficiency
  • Spearheaded implementation of agile methodologies, resulting in a 50% reduction in project timelines and 20% increase in team productivity
  • Established and maintained strong relationships with cross-functional teams to ensure seamless collaboration and successful product launches
  • Implemented a mentorship program to foster professional development and skill growth within the engineering team, resulting in 25% increase in employee retention rates.

Yeo Hiap Seng (M) Sdn Bhd, SHAH ALAM

Group Maintenance Manager
12.2019 - 05.2021

Job overview

  • Responsibilities
  • Responsible for overall Operation and Management of Maintenance, Building &
  • Utilities
  • Identifies optimum maintenance strategies and leads Plant Preventive
  • Maintenance Program;
  • Accountable for Maintenance OPEX and CAPEX budgets and costs of entire
  • Plant & Building
  • Leads initiatives on erection & commission of new equipment and identifies debottlenecking project to enhance plant processes and productivity;
  • Ensures compliance with statutory requirement and company’s Health and
  • Safety, Quality and Environmental Management Systems, Policies and
  • Procedures
  • Equipment / Machines Maintenance: Preventive / Prediction / Repairing
  • Maintenance of Machine:
  • Provide expertise and analysis to machine maintenance optimization
  • Root-Cause Analysis, predictive maintenance for rotating equipment
  • Responsible for Group Technical requirements are met and update technical procedures related to rotating equipment
  • Enable high performance Operations, providing assets' Maintenance according to Department Strategy (using TPM as multi-disciplined approach to maintain/improve fixed assets, and to manage their life cycle)
  • Schedule both internal and external work(s) maximizing planned down time and reducing unplanned downtime
  • Optimize equipment according to standard procedure, enhancing performance
  • Work Experience and product quality, ensuring achievement of all Key Performance
  • Indicators (KPIs)
  • Maintain & improve machine efficiency levels
  • Prepare annual Maintenance budget and forecasts
  • Initiate spare parts management and second sourcing
  • Improvise maintenance operations to save on costs and work time
  • Developing and implementing (proactive) maintenance program
  • Manage contractors on site to ensure meet legal and company requirements
  • Facilities & Utilities Responsibilities :
  • Operate, repair and maintain building and Plant utility & WWTP systems and equipment in a manner that fully supports building operations and Plant activities
  • Provides trouble shooting and problem solving using basic technical knowledge, analytical techniques and theory of operation for all building utility systems including day to day steam boiler operations and duties, heating, steam, condensate, compressed air, vacuum, hot water, scrubber systems and HVAC support systems
  • Perform preventative maintenance tasks to plant utility ,WWTP & HVAC equipment and systems as required through the FM Maintenance Management program
  • Plan safety training involving external party such as BOMBA
  • Managing Ground Maintenance for administrative buildings & plant such as pest control, landscaping, disposal of waste (following SW criteria)
  • Maintenance & monitoring of security systems ie: CCTV, intruder detector, motion detector)
  • Determine & approve major building equipment maintenance including appropriate action, method & solicitation of quote for repair, spare-parts purchase by schedule both internal & external works
  • Recommend and implement design modifications to systems and equipment to enhance operations
  • Utilizing FM Maintenance Management System, prioritize and schedule requested and PM work in manner that fully supports operations, maximizes runtimes and enhances operations
  • Change priorities when required to accommodate un-scheduled work requests
  • Ensure all laws, statutory and regulations relating to electrical systems are comply accordingly (DOSH,DOE ,Suruhanjaya Tenaga, Bomba, local authority etc

Ge-Shen Corporation Berhad, JOHOR BAHRU

Group Maintenance, Facility Manager
06.2017 - 12.2019

Job overview

  • Experience
  • Responsible for overall Production, Maintenance & Project for 4 plants ( Johor
  • Penang & Vietnam
  • Provides engineering and solutions of technical equipment issues across
  • Complex and facilities within Group;
  • Responsible for overseeing outages;
  • Accountable for Maintenance OPEX and CAPEX budgets and costs
  • Develops and maintains asset integrity register for whole of
  • Plant in CMMS

  • PREVENTIVE & PREDICTIVE MAINTENANCE
  • Develop Plan Preventive Maintenance Schedule (PPM),ensure full preventive maintenance is carry out, planned in miss preventive maintenance activities and lead Group maintenance team effectively
  • Create GROUP objectives for Plant Machinery Preventive & Predictive
  • Maintenance, & Plant Automation
  • To supervise, guide daily activities for Group engineers & technician resolving daily breakdown & preventive maintenance activities carry out ,spare-parts inventory & support production operation
  • Provide Technical expertise to GROUP maintenance team
  • Perform root cause analysis & resolve problems
  • Manage GROUP maintenance expenditure
  • Conduct GROUP risk assessment of processes & tasks in maintenance department
  • Perform on hand repair for motor, molding machine, AOI, stamping machine, furnaces, SMT machine, Grinding machines, Barrel machines, Router machines
  • Degreaser machines once require
  • Collaborated with vendors, suppliers, FACILITY MANAGEMENT
  • Liaise with Government Authorities & local authority (BOMBA,JKKP,DOE etc)
  • Plan safety training involving external party such as BOMBA
  • Ensuring preventive maintenance activity carry out by 3rd party as base on contract agreement according to schedule
  • Comply all sites with HSE requirement such as DOSH & DOE inspections
  • Managing Ground Maintenance for administrative buildings & plant such as pest control, landscaping, disposal of waste (following SW criteria)
  • Maintenance & monitoring of security systems ie: CCTV, intruder detector, motion detector)
  • Create utilities cost saving for company through Green Project
  • Determine & approve major building equipment maintenance including appropriate action, method & solicitation of quote for repair
  • Work Experience spare-parts purchase by schedule both internal & external works
  • Collaborated with vendors, suppliers
  • Prepare CAPEX budgetary yearly
  • C:- PROJECT & ASSET MANAGEMENT
  • Undertake upgrading projects for future expansion
  • Assessed all phases of product lifecycle, including identifying and recommending opportunities for changes to unit stakeholders
  • Managed multiple, large-scale projects across 4 sites
  • Plan, develop & execute new projects set up
  • To ensure progress of work in accordance to pre-planned schedule & conduct costing monitoring with relevant financial controlling parties
  • Complete/ Manage new transferred projects deliverables to agreed target
  • Coordinate & host regularly project meeting to follow-up the progress
  • Awards

Education

Zamboanga AE Technical College
Philippines

Bachelor of Science from Electronics Engineering
06.1994 - 02.1998

University Overview

Designed and implemented a circuit board for a senior capstone project, showcasing proficiency in PCB layout and troubleshooting skills. Conducted extensive research on renewable energy systems, leading to a presentation on the feasibility of integrating solar panels into residential buildings. Collaborated with a team of engineers to develop a prototype for a wireless communication system, demonstrating strong teamwork and communication skills. Completed coursework in analog and digital electronics, gaining a deep understanding of circuit theory and signal processing techniques.

Skills

MS Officeundefined

Affiliations

Power B.I Professional Pivot Professional SAP Professional ERP Professional JDE Professional Professional GMP Professional HACCP Professional ISO 9001 Professional ISO 14001 Professional FDA Professional Food Safety Professional HALAL Professional Lean Manufacturing Professional Six Sigma Professional CMMS Professional Skills Team leadership Professional Project management Professional Budgeting and forecasting Professional Stakeholder communication Professional Volunteering NGO Yayasan IKRAM Malaysia 11/2009 – present JOHOR BAHRU, MALAYSIA Organized and executed fundraising events, resulting in a 30% increase in donations for the organization. Coordinated a team of volunteers to assist with community outreach initiatives, reaching over 500 individuals in need. Developed and implemented a social media campaign that increased organization's online presence by 40%. Collaborated with local businesses to secure sponsorships for events, leading to a 25% reduction in event costs.
Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Accomplishments

  • Completed the Recycling Hydraulic Oil for molding machine Project on time and RM 180,00 under budget.
  • Presented with the Bravo Award for spurring more than 5% maintenance cost expenditure for 7 consecutive months.
  • Reduced department operating costs by 12% in 7 months by localize machine spare-parts & full utilize of in house fabrications.
  • Collaborated with team of 26 personnel in the development of Building Solar Projects.
  • Supervised team of 189 staff members.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementPersonal development programsCompany CultureFlexible work hoursWork-life balance

Languages

English
Bilingual or Proficient (C2)
Bahasa Malaysia
Bilingual or Proficient (C2)
Japanese
Elementary (A2)

Interests

Sports

Travelling

Reading

Exploring New Technologies

Cars

Foods

Timeline

Senior Engineering & Project Manager

DinDings Tyson Sdn Bhd, PERAK
09.2022 - 07.2024

Head Of Engineering

KJCF Sdn Bhd
11.2021 - 08.2022

Group Maintenance Manager

Yeo Hiap Seng (M) Sdn Bhd, SHAH ALAM
12.2019 - 05.2021

Group Maintenance, Facility Manager

Ge-Shen Corporation Berhad, JOHOR BAHRU
06.2017 - 12.2019

Zamboanga AE Technical College

Bachelor of Science from Electronics Engineering
06.1994 - 02.1998
Isma Rashid AlimonSenior Engineering & Project Manager