Started in 2015 as Cadet Engineer Palm Oil Mill - FGV Palm Industries Sdn Bhd (FGVPISB) - Served 2 mills from 2015 until 2024
1) FGVPISB Kilang Sawit Palong Timur, Segamat, Johor (Operation)
2) FGVPISB Kilang Sawit Keratong 3, Bandar Tun Abd Razak, Pahang (Maintenance)
- Currently appointed as Mill Manager in FGVPISB Kilang Sawit Sampadi, Lundu, Sarawak.
- Responsible for implementing and taking action to optimize Mill efficiency and process FFB effectively.
- Responsible to achieve potential OER and KER.
- Responsible for purchasing of FFB.
- Responsible for purchasing of spare parts.
- Responsible for buying good quality of Fresh Fruit Bunch (FFB).
- Responsible to produce and manage by products accordingly.
- Responsible to achieve mill throughput.
- Responsible for budget planning
- Responsible to manage and control processing cost of the mill.
- Responsible for process control, quality of product and losses within control limit.
- Responsible for the safety of employees, machineries and others including of raw materials, products, spare parts and properties of the mill.
- Responsible to supervise & administer the operation and management of Biogas Plant (if any, depend in projects/mills).
- Responsible for mill cleanliness.
- Responsible to uphold labour standards according to National laws and international labour standards
- Responsible for ensuring that there is no use of forced labour at the mill
- Responsible for management of ISO 9001, ISO 14001, OHSAS 18001, RSPO/MSPO, ISCC and others at Mill.
- Responsible to manage with regard to the internal and external affairs and crisis of the mill.
- Responsible in manpower requirement
- Responsible for career development and training of the staffs.
- Responsible to take action on audit issues ( SIRIM, ADK etc )
- Comply and follow the EMS System 14001
- Good practice of environment health & safety
- Comply with the procedure of OHSAS 18001
SEP 2015-FEB 2020 (KS PALONG TIMUR)
- ASSIGNED AS ASSISTANT MILL MANAGER (OPERATION)
- Responsible to achieve potential OER and KER.
- Responsible to achieve mill throughput.
- Responsible for process control, quality of product
and losses within control limit.
- Responsible for the safety of employees,
machineries and others including of raw materials,
products, spare parts and properties of the mill.
- Responsible for mill cleanliness.
MAR 2020 - SEP 2024 (KS KERATONG 3)
- ASSIGNED AS ASSISTANT MILL MANAGER (MAINTENANCE)
- Responsible to plan and implementation of preventive maintenance (PV40)
- Responsible to manage and control maintenance cost
- Responsible to do budget planning for mill maintenance
- Responsible to acquire CePSWAM (Certified Professional Scheduled Waste Management)
- Responsible for implementing and taking action to optimize Mill efficiency and process FFB effectively.
Solidwork
2024
- Achieved high UF processing exceeding 100% Utilization Factor from May to October 2024 by receiving a diversion in February from a neighboring mill
- UF 100%/month = process 20,000mt FFB/month.
Appointed as a Mill Manager Palm Oil Sampadi start 01 October 2024
2023
- Achieved shell recovery rate (SRR) > 4% every month. YTD 23 Mei 2023 SRR 4.10% (RM831,937.15) sales.
- Achieved sludge oil sales at 0.24% YTD (RM449,260) sales
- Maintaining mill processes capacity >40mt/h every month
- Able to solve problem on high stock of EFB in mills by operate EFB shredded 100% during process, save cost on EFB disposal
2022
- Achieved FFB processed at KS Keratong 3 247,800mt/h OER 20.17%, KER 5.08%
- Achieved shell recovery rate (SRR) 3.37% with RM2,531,586.31 sales (new record)
- Achieved total by –product sales of RM3,307,344.36 for 2022
2021
- Achieved FFB processed at KS Keratong 3 230,030mt/h, OER 20.53%, KER 5.00%
- Reducing maintainance cost from RM18.22mt to RM14.48/mt in 2021
- Achieved zero breakdown from April 2021 until August 2021
- One of the OER taskforce member in POM Keratong 2 and POM Bukit Mendi on behalf of Mill Manager.
2020
- Achieved FFB processed at POM Keratong 3 251,510/mt, OER 20.35%, KER 5.00%
- Able to maintain mill UF above 100% in POM Keratong 3 since transferred in March 2020
Certified Environmental Professional in Scheduled Waste Management (CEPSWAM)