Results-driven electrical engineer with 16+ years of experience managing large-scale projects and technical teams in the energy and oil & gas sectors. Highly skilled in project management, electrical design and construction, product certification, and adult learning in education. Demonstrated ability to consistently deliver projects on time, within budget, and scope. Passionate about leveraging technical expertise and leadership experience to drive innovation and operational excellence in a new challenging role. Eager to contribute to an organization's success by applying both hands-on industry knowledge and academic insights.
Overview
17
17
years of professional experience
5
5
years of post-secondary education
5
5
Certifications
Work History
Technical Evaluator
TNB Labs Sdn Bhd
9 2020 - Current
Conduct Technical Evaluations: A wide range of electrical products and systems was evaluated to ensure compliance with technical specifications and industry standards
This included: Documentation Inspection: All necessary technical documents, manuals, and certifications were reviewed to ensure compliance with regulatory and safety requirements
Physical Verification: Hands-on assessments of products were performed to verify their functionality, design, and adherence to technical standards
Preparation of Evaluation Reports: Detailed evaluation reports were compiled in a standardized format prescribed by TNB Labs
These reports summarized the findings, including technical assessments, test results, safety compliance, and any recommendations for product improvements or approval
Accurate, clear, and thorough reports were created, reflecting technical expertise and attention to detail
A broad range of critical products, such as Low Voltage Automatic Transfer Switches (LV ATS), Indoor Cast Resin Dry Type Transformers, 12kV 5 MVAR Capacitor Banks, and other high-importance electrical infrastructure components, was successfully evaluated
A commitment to delivering thorough and timely evaluation reports has ensured that the product certification process at TNB Labs remains on schedule
This reflects the ability to work under tight deadlines while maintaining the highest standards of technical reporting
Consistent reporting keeps the certification team well-informed, contributing to efficient decision-making regarding product approvals or rejections
Programme Leader/ Senior Lecturer
Segi University
Selangor, Selangor
09.2019 - Current
Staff Management and Development: Monitored staff performance and provided opportunities for professional development in line with university policies
EAC Accreditation Leadership: Led the efforts for Engineering Accreditation Council (EAC) accreditation, preparing essential documentation such as the Self-Assessment Report (SAR) and course information for audits
Student Advising: Provided guidance and consultation to fresh entry students and graduating students, assisting them in their academic and career planning
Teaching Responsibilities: Delivered lectures on subjects such as Electrical Energy Utilization, Engineer and Society, and Project Management, equipping students with essential knowledge and skills
Supervised master's and final year project students, mentoring them through their research and project work
Achieved accreditation for Electrical & Electronics Engineering department, enhancing the credibility and recognition of the program
Contributed to academic knowledge through published research articles in reputable journals including a 'Dynamic Outcome-Based Education (OBE) Model' and 'A PV Watering Plant System With IoT Integration'
Successfully introduced innovative modules and updated existing curricula to meet industry standards and prepare students for future challenges
Senior Lecturer
Manipal International University
Negeri Sembilan, Nilai
02.2017 - 08.2019
EAC Accreditation Document Preparation: Preparing essential documentation such as the Self-Assessment Report (SAR) and course information for audits
Developed and reviewed the Module Descriptor Master Document to ensure compliance with accreditation standards
Teaching Responsibilities: Delivered lectures on subjects such as Electrical Network Analysis, High Voltage, and Combinational and Sequential Circuit, equipping students with essential knowledge and skills
Achieved accreditation for 2 programs in Electrical & Electronics Engineering department, enhancing the credibility and recognition of the program
Successfully delivered a wide range of subjects, helping students grasp essential engineering and entrepreneurial concepts, which contributed to their academic growth and professional preparedness
Senior Project Engineer Cum Work Pack Leader
Sapura Kencana Pinewell Sdn Bhd
04.2013 - 01.2017
Project Leadership and Team Management: The HUC team was led, overseeing activities such as fabrication, installation, pre-commissioning, and commissioning
This involved the coordination of manpower, ensuring seamless execution of tasks, and maintaining team productivity to meet project goals
Scheduling and Reporting: A pivotal role was played in developing the HUC schedule and reporting progress
This involved collaboration with the planner, attendance at weekly progress meetings with the client, and ensuring that the project stayed on track
Cost Control: Monitoring and controlling project costs was a key part of the role, ensuring that the project stayed within budget
Regular cost reports were provided to headquarters, and resource allocation was adjusted when necessary to maintain financial control
Engineering Liaison: Collaboration with the engineering department was undertaken to resolve any technical or drawing issues that arose during the project, ensuring alignment between field activities and engineering designs
Health, Safety, and Environment (HSE) Compliance: A significant part of the role was ensuring HSE compliance at the work site, adhering to ISO 14001 and ISO 18001 standards
QA/QC Oversight: The quality assurance and quality control (QA/QC) requirements were ensured across different disciplines
This involved coordination with construction quality coordinators and ensuring that the production of QC reports, including fit-up reports, NDT (Non-Destructive Testing) reports, and hydro test results, aligned with actual site progress
System Handover and Project Completion: The focal point for the system handover was maintained, ensuring the successful sign-off of mechanical completion and pre-commissioning between the contractor and client
Major EPCIC and HUC projects, including the Sepat Early Production System (Phase 1b) and the Angsi Compression Module, were successfully executed
On-time delivery and budget compliance were achieved despite the complexity of the tasks, reflecting strong project management skills and the ability to control costs while working with multiple vendors and subcontractors
By implementing stringent HSE practices, a Zero LTI record was maintained across all projects
Project Engineer / Project Superintendent
Malaysia Marine and Heavy Engineering
06.2007 - 03.2013
Project Leadership & Engineering Oversight: Successful refurbishment and electrical upgrades of major offshore assets, such as the Hercules Rig-31 and the NAGA 1 semi-submersible, were achieved, helping to extend the operational life of these units
Technical Review & Documentation: Technical reviews of electrical designs were conducted, electrical load calculations were reviewed, and essential electrical drawings, such as single line diagrams, cable schedules, and installation drawings, were prepared
The sizing of circuit breakers and cables was assessed to ensure reliable and safe power distribution
Contractor & Schedule Management: Contractors' performance was closely monitored to ensure adherence to the project's detailed engineering schedules
This required the review of plans, ensuring that deliverables were submitted on time, and the taking of corrective actions to address any issues that arose during the project
Successful refurbishment and electrical upgrades of major offshore assets, such as the Hercules Rig-31 and the NAGA 1 semi-submersible, were achieved, helping to extend the operational life of these units
Engineering and installation activities across multiple projects, including the FSO Nautica Muar and the TOGMOR deepwater pipe-laying barge, were successfully managed, ensuring that these complex refurbishments were delivered on time and within budget
Education
Master of Renewable Energy - Renewable Energy and Energy Management
University Malaya
Kuala Lumpur
06.2017 - 07.2019
Bachelor's in engineering (HONS) - Electrical Power
Professional Engineer, Board of Engineer Malaysia, P117351
Affiliations
Board Of Engineer Malaysia (Member)
Malaysia Board of Technologist (Member)
Languages
Bahasa Melayu
Proficient
C2
English
Proficient
C2
Timeline
Programme Leader/ Senior Lecturer
Segi University
09.2019 - Current
Master of Renewable Energy - Renewable Energy and Energy Management
University Malaya
06.2017 - 07.2019
Senior Lecturer
Manipal International University
02.2017 - 08.2019
Senior Project Engineer Cum Work Pack Leader
Sapura Kencana Pinewell Sdn Bhd
04.2013 - 01.2017
Project Engineer / Project Superintendent
Malaysia Marine and Heavy Engineering
06.2007 - 03.2013
Bachelor's in engineering (HONS) - Electrical Power
Universiti Teknologi Mara
05.2004 - 05.2007
Technical Evaluator
TNB Labs Sdn Bhd
9 2020 - Current
Similar Profiles
Mohd Nur Haniff Bin LatifMohd Nur Haniff Bin Latif
Senior Engineer (O&M Excellence - Brown Asset) at TNB Power Generation Sdn. Bhd.Senior Engineer (O&M Excellence - Brown Asset) at TNB Power Generation Sdn. Bhd.