Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Timeline
Generic
ZULHILMI KHAMIS

ZULHILMI KHAMIS

Technical Engineer - Senior Executive
SEREMBAN

Summary

Detail-oriented, organized and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success. Proficient Project Engineer with 9 years of experience driving over 20 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget and according to specifications. Analytical Project Engineer focused on applying sound engineering principles using both traditional and innovative methods. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Hardworking and passionate job seeker with strong organizational skills eager to secure senior level position. Ready to help team achieve company goals.

Overview

9
9
years of professional experience
4
4
years of post-secondary education

Work History

Technical Engineer

NGC ENERGY SDN BHD
Seri Kembangan, Selangor
11.2023 - Current
  • Designed system enhancements for assets within LPG industry operations.
  • Wrote work orders, accounting for standard budgeting guidelines and operational parameters.
  • Documented and developed engineering procedures and processes.
  • Prepare cost estimation and assist Sale Manager project economic appraisal.
  • Act as technical authority accountable to ensure IC installation meet regulatory and company standard and requirement.
  • Determined and scheduled priorities as required to progress engineering work.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Identified technical risks within managed projects.
  • Reviewed progress controls for project quality assurance.
  • Conducted technical evaluations of engineering designs and test results.
  • Provided exceptional technical support, addressing client concerns and ensuring their needs were met.
  • Increased project efficiency by expertly managing resources and adhering to strict deadlines.
  • Developed detailed project plans to ensure timely completion and deliverables were met.
  • Identified risks and implemented mitigation strategies, minimizing potential issues during the project lifecycle.

Project Engineer

Hammer Engineering Sdn Bhd
Shah Alam, Selangor
09.2021 - 10.2023
  • Determined and scheduled priorities as required to progress engineering work.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Performed constructability reviews of construction bid documents for coordination purposes.
  • Evaluated change order requests in response to out-of-scope work activities.
  • Assisted with cost proposal development and customer presentations.
  • Delivered regular compliance reports to drive process improvement and corrective measures.
  • Maintained records for each project and engineering discipline.
  • Reviewed progress controls for project quality assurance.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Recommended process improvements to reduce unnecessary waste.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Assessed impact of modification requests for ongoing projects.
  • Monitored metrics during project execution to maintain compliance with planned costs.
  • Identified technical risks within managed projects.
  • Delivered concise instructions to technical team to maintain quality control.
  • Provided technical direction of system development methodologies to improve technical performance.
  • Documented and developed engineering procedures and processes.
  • Created detailed reports on engineering activities and findings.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Conducted technical evaluations of engineering designs and test results.
  • Analyzed and interpreted data to identify trends and recommend improvements.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Monitored and evaluated engineering performance to recommend improvements.
  • Collaborated with other departments to facilitate successful project completion.

Project Engineer

Globegas Engineering Sdn Bhd
Kajang, Selangor
01.2015 - 09.2021
  • Design and engineering for client
  • Project Coordination which involves coordination work with vendors, subcontractor, local authorities and client
  • Generating relevant documentations for project deliverables as per client’s requirements
  • Project cost control through effective project scheduling and minimizing project cost and expenses
  • Meet project dateline as stipulate in client’s contract
  • Sourcing most competitive but yet reliable products, bulk materials and consumables for project
  • Assist Project Manager in executing site construction and commissioning works
  • Promote, implement and practice safety at all time throughout project execution
  • Lead team in commissioning and decommissioning gas piping
  • Assisting Fabrication team to expedite project fabrication and procure allmaterial needed
  • To consult project team and service team on gas piping commissioning and decommissioning
  • Assisting sales team to site visit on upcoming project and advise them on details and outcome from site visit
  • Liaise with authority such as Department of Occupational, Safety and Health (DOSH) and Energy Commission (ST)
  • Determined and scheduled priorities as required to progress engineering work.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Performed constructability reviews of construction bid documents for coordination purposes.
  • Evaluated change order requests in response to out-of-scope work activities.
  • Assisted with cost proposal development and customer presentations.
  • Delivered regular compliance reports to drive process improvement and corrective measures.
  • Reviewed progress controls for project quality assurance.
  • Assessed impact of modification requests for ongoing projects.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Delivered concise instructions to technical team to maintain quality control.
  • Provided technical direction of system development methodologies to improve technical performance.
  • Documented and developed engineering procedures and processes.
  • Trained junior engineers in workstation design and material handling.
  • Led engineering teams to successfully complete projects on time and within budget.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Developed and implemented procedures to verify compliance with engineering standards.
  • Analyzed and interpreted data to identify trends and recommend improvements.
  • Performed complex calculations to analyze and optimize engineering processes.
  • Collaborated with other departments to facilitate successful project completion.
  • Verified construction documentation to meet client requirements and vision.
  • Monitored and evaluated engineering performance to recommend improvements.
  • Developed comprehensive engineering documents for all projects.
  • Analyzed and interpreted customer requirements to develop engineering solutions.
  • Assisted in developing cost-effective solutions to engineering problems.
  • Implemented new strategies to reduce costs and improve efficiency of engineering team.
  • Conducted research to identify and evaluate new technologies and concepts.
  • Developed high-quality engineering designs and plans to meet industry standards.
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
  • Trained and mentored junior engineers, providing guidance and direction.

Education

Bachelor’s Degree - Chemical Engineering

Universiti Malaysia Pahang
Gambang
01.2011 - 09.2014

Skills

Risk management

undefined

Accomplishments

Project involvement:

  • Installation of Liquid Petroleum Gas System (LPG) at Binjai 8, Kuala Lumpur Client: Binjai 8
  • Installation of Liquid Petroleum Gas System (LPG) at An Viet, The Gardens Client: An-Viet
  • Installation of Liquid Petroleum Gas System (LPG) at Centrelize Labour Quater (CLQ)
  • Installation of Liquid Petroleum Gas System (LPG) at King Henry International School, Cyberjaya Client: King Henry International School
  • Installation of Liquid Petroleum Gas System (LPG)Terminal Bersepadu Gombak, Gombak Client: Terminal Bersepadu Gombak
  • Inspection and maintenance of Liquid Petroleum Gas System (LPG) Nestle Surian Tower, Damansara Client: Nestle
  • Inspection and maintenance of Liquid Petroleum Gas System (LPG) Nottingham University, Semenyih Client: Nottingham University
  • Installation and maintenance of Natural Gas System at IOI Pan-Century Sdn Bhd, Cogeneration Plant, Johor Client: IOI Pan-Century Sdn Bhd
  • Installation and maintenance of Natural Gas System at NS Bluescope Malaysia Sdn Bhd, Kapar Client: NS Bluescope Malaysia Sdn Bhd
  • Inspection and maintenance of Natural Gas System Kuala Lumpur Airport Service, Sepang Client: Kuala Lumpur International Airport
  • Installation of Natural Gas System at Proton City Tg Malim, Tg Malim Client: Proton Tanjung Malim Sdn Bhd
  • Inspection and maintenance of Natural Gas System KLCC Tower, Kuala Lumpur Client: KLCC Urusharta Sdn Bhd
  • EPCC of Service Station SS/F/DR Phase 1’20 (8 units) Client: Gas Malaysia Berhad
  • EPIC of 52 units of EVC for existing service station Phase 3’21 Client: Gas Malaysia Berhad
  • EPCC of Service Station SS/F/DR Phase 6’21 (6 units) Client: Gas Malaysia Berhad
  • EPCC of Station Replacement Works for 2 units of Existing Customer Owned Station Phase 1'21 Client: Gas Malaysia Berhad
  • EPCC of Service Station SS/F/DR Phase 3’22 (5 units) Client Gas Malaysia Berhad
  • EPCC of Hutan Melintang City Gate (HUMES) Client: Petronas Gas Berhad
  • EPCC of Installation Ultrasonic Mater at ML 505, Ulu Tiram (ULTRA) Client: Petronas Gas Berhad

Additional Information

  • Achievement: Initial Acceptance 10 days earlier than Contractual Date for ULTRA Project with Petronas Gas Berhad
  • Certified Gas Engineering Supervisor by Energy Commissioner
  • Registered with Board of Engineer Malaysia as a Graduate Engineer

Timeline

Technical Engineer

NGC ENERGY SDN BHD
11.2023 - Current

Project Engineer

Hammer Engineering Sdn Bhd
09.2021 - 10.2023

Project Engineer

Globegas Engineering Sdn Bhd
01.2015 - 09.2021

Bachelor’s Degree - Chemical Engineering

Universiti Malaysia Pahang
01.2011 - 09.2014
ZULHILMI KHAMISTechnical Engineer - Senior Executive