Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Certification
Timeline
Generic
YUSNAIDI DAHLAN

YUSNAIDI DAHLAN

Kajang, Selangor Malaysia

Summary

SUMMARY EXPERIENCE

16 years experiences involved in Project Management, Engineering, Fabrication / Construction, Hook Up & Commissioning and Topside Major / Minor Maintenance (TMM) . Major in execution, co- ordination and installation for offshore and onshore facilities (Greenfield and Brownfield) with having driven major projects valued at >MYR 100M for leading EPCC project and FPSO such as PETRONAS, KPOC & JX Nippon Oil & Gas Ltd.

Capable of effectively marrying extensive technical knowledge with practical skills and experience in driving a diverse range of business operations, from expansion and growth operations to technical surveys and consultancy project. Ensuring that all engineering work is carried out in accordance with specifications, statutory requirements, laws, rules, regulations and other contractual requirements with due regards to safety, operability and maintainability. Responsibilities include managing and supervising projects discipline also interfacing with Contractor and Consultant and interdisciplinary interface.

Experience in project planning, cost estimation, planning resources, vendor mobilization, construction and commissioning. Involved extensively in hook-up and commissioning for Brownfield and Greenfield project. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

17
17
years of professional experience
1
1
Certification

Work History

SENIOR HOOK-UP & COMMISSIONING ENGINEER

PETROLIAM NASIONAL BERHAD (PETRONAS)
07.2019 - Current


  • DULANG REVISIT 1.0 & 2.0 INFILL DRILLING (2019 – 2022)
  • As a project lead, successfully delivered Dulang 1.0 Infill project with OTOBOS 4 days ahead
  • Beside that for Dulang 2.0 Redevelopment, manages to achieved 1st Oil with 6days ahead which contributes ahead of schedules, budget and zero LTI
  • Manage to create value creation for negotiation of RCP materials/ vendor with amount RM4.2M with follows the design & specifications
  • Besides that, successful in handover the project to Asset Owner 5nos of system handover.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Verified construction documentation to meet client requirements and vision.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.


  • PROVISION OF EPCIC FOR PIPELINE REPLACEMENT PROJECT PL429 & PL430 (2021-2022)
  • As a focal person onshore and offshore campaign, successfully achieved 1st gas with 8days ahead schedules
  • Negotiation of the contract values which contributes cost saving to COMPANY with amount RM2.3M without neglecting the design and standards
  • Beside that, zero LTI recorded throughout the campaign and project give the additional profits to Asset.


EPCC LWS Gansar & BMHTI Duyong CPP (2023- 2025)

  • As an interface focal person between T&I, HuC, Wells and Unloading teams
  • Identify the potential clashing activities between each interface so that the demarcation of scope been clear by each parties
  • Also involves in FEED which contributes the project sanctions and- awarded the project to Contractor with negotiation less than 80% of project forecast.
  • Managed day-to-day business operations.
  • Enhanced operational efficiency and productivity by managing budgets, accounts, and costs.
  • Attend HAZOP, HAZID, SIL, Constructability Review, 60-90% PDMS Model review, ORA.
  • Expertise in pressure vessels, storage tanks and spherical storage tanks.
  • Profound ability to network with industry and trade associations within the static equipment discipline.
  • Strong experience in equipment selection, design, testing, fabrication, installation and commissioning of static equipment.

SENIOR PIPING ENGINEER

KEBABANGAN PETROLEUM OPERATING COMPANY (KPOC)
10.2018 - 06.2019
  • Provision of EPCC PFLNG1 RELOCATION & TIE-IN PROJECT
  • 1st relocation work in the world where it successfully achieves ahead schedule 1.5 month. Also KBB able to supply gas more with capacity 210mmsf max to PFLNG1. This will increase the supply of demand to MLNG and make profit to the Asset Owner.
  • Work Description:
  • Review of detailed engineering deliverables such as Plot Plan, Equipment layout, Piping
  • Key plan, Piping GAD, Piping Isometrics, Piping Section and support details, BOM for Piping and Supports
  • Prepare work plus instructions to designers involved in mechanical plus piping design package
  • Review workpack that related with piping modification and tie-in scope
  • Estimate manhours for offshore hook-up execution phase
  • Review Technical Requisition Package (TRP), Valve datasheet, Special items datasheet.
  • Prepare system demarcation and boundary for new installation system
  • Review TBE for piping bulk, valves, interlock system, launcher receiver and high strength materials
  • Conduct meeting with vendor to meet the specification and delivery meet project requirement
  • Attend FAT and SAT for the piping packages i.e manual valves, actuated valves, SP items etc
  • Perform the inter-disciplines checking for the part of documents in accordance with the scope of the piping material section
  • Provides technical support to Procurement, Subcontracting and Construction activities included in the scope of work.
  • Review, verify and update the Acoustic Induced Vibration (AIV) and Flow Induced Vibration (FIV) study based on latest version of Energy Institute (EI) guidelines
  • Prepare the list of Piping Speciality Items like Steam Traps, Strainers, Hoses, etc
  • Performing basic and detail design for static equipment such as pressure vessel, storage tank, heat exchanger and package equipment.
  • Responsible for cost, schedule, quality and budget control.
  • Responsible for issue of all mechanical deliverable documents such as engineering specification, mechanical datasheet, requisition, technical evaluation, engineering drawing and also reviewing vendor document.
  • After placement of a purchase order, to review and approve documentation from vendors related to piping components
  • To Prepare VMS (Valve Material Specification) and PMS (Piping Material Specification) for Process and Utility Services.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Assisted project planning teams by providing data on scheduling, cost estimations and project scope calculations.
  • Collaborated with other departments to facilitate successful project completion.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Verified construction documentation to meet client requirements and vision.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
  • Participate in Pre Safety Start-Up Review (PSSR) between Operation rep and Commissioning team.

WORKPACK TEAM LEAD

DAYANG ENTERPRISE SDN BHD (DESB)
05.2016 - 09.2018


  • Project Tittle : Provision of Topside Maintenance Services and Oil Hub Commissioning for KPOC.
  • Lead project for Oil Hub Campaign that covers for materials requisition, manpower and equipments, work completion, close-out report.
  • Lead the workpack team to review all engineering documentation receive from KPOC
  • Coordinate with all discipline engineers to review engineering drawings.
  • Raise Technical Query (TQ) if any discrepancies found within the engineering documentation.
  • Maintain, update, review and reconcile project budget spreadsheet, managing project expenses within projected budget.
  • Lead the technical scope for the Shutdown for Gas and Oil hub system for KBB platform.
  • Review TBE/CBE and vendor call-out package that meet Client requirement for Oil Hub campaign.
  • Closely monitor the fabrication progress and handle the materials issue to meet the target date.
  • Provides technical and engineering support to company personnel as well as to subcontractors to ensure that the project will comply with all mandated engineering standards, codes, specifications, and design construction.
  • Organised daily teleconference meeting with offshore team pertaining materials issue, technical clarification and resolved the problems.
  • Review workpack preparation inclusive of manpower coordination, work scheduling, material take-off, marine spread, safety & QAQC aspect.
  • Review System Commissioning dossier preparation (i.e
  • System mark-up drawing, checksheet overview preparation, template of punchlist & template of overall dossier).
  • Lead System Handover, Mechanical Completion & Pre-Comm Completion sign off between contractor and client.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Trained new team members by relaying information on company procedures and safety requirements.
  • Coached team members in techniques necessary to complete job tasks.
  • Assisted in recruitment of new team members, hiring highest qualified to build team of top performers.

PIPING ENGINEER

JX NIPPON OIL & GAS EXPLORATION, MALAYSIA) LTD
06.2015 - 03.2016
  • Provision of EPCIC AND LEASING FOR LAYANG FPSO FACILITIES
  • Work Description:
  • Prepare all installation and selection documents for all mechanical equipments for Layang FPSO.
  • Performs the inter-disciplines checking for the part of documents in accordance with the scope of piping material section
  • Provide support to Layang FPSO expense projects, maintain accuracy in all piping project, ensure compliance to all piping material specifications, and maintain knowledge on all orders.
  • Analyze all mechanical designs, prepare various concepts for piping designs, and develop required mechanical drawings.
  • Review of detailed engineering deliverables such as Plot Plan, Equipment layout, Piping Key plan, Piping GAD, Piping Isometrics, Piping Section and support details, BOM for Piping and Pipe support.
  • To Purchase All the Piping Items, which includes below:
  • To Prepare MR (Material Requisition) for getting Quotations
  • To Review the Vendor offers, do technical discussions with the vendors and prepare
  • TBE (Technical Bid Evaluation)
  • To Prepare MR for Purchase
  • To Review Vendor Documents
  • Prepare the list of Piping Speciality Items like Steam Traps, Strainers, Hoses, etc
  • To Prepare the Data Sheets for the Piping Speciality Items
  • To Perform the Reinforcement PAD Requirement calculation.
  • Oversaw calculation of technical specifications for use in procurement of piping components and raw materials.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
  • Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.

PIPING ENGINEER

KEBABANGAN PETROLEUM OPERATING COMPANY (KPOC)
08.2012 - 04.2015

FABRICATION OF CPP KBB NORTHERN HUB

  • Establish Piping Material Specifications (Piping Classes)
  • Piping Design Basis, Pipe Support,Standard and Pipe Stress Analysis Specification.
  • Prepare Valves and Special Piping Items Datasheet/Specifications.
  • Review and checking piping layout, isometric and perform analysis when required.
  • Review and ensure that the design is compliance with international codes & standard, local country codes and PTS requirements.
  • Prepare the materials list depicting all the materials, sizes, specification, special requirements, testing requirement to meet the design.
  • Prepare datasheet for valves, special type fittings and strainers, moreover coordinates with vendor to make sure the right product delivered.
  • Review documents and drawings of vendor’s supplied equipment’s, valves and skid to verify the piping requirements are meet.
  • Cross verify the stress report with support mentioned in the drawings to avoid design flaws.
  • Review piping study of critical lines to fix the equipment locations and associated structures /items from specific process, operating, maintenance and construction criteria
  • Monitor performance and quality of work of major subcontractors performing flange management, flushing, cleaning, N2He leak testing to ensure all work is fully completed and properly documented.
  • Monitor performance & quality of work for Lube Oil Flushing external piping for Lube Oil Line, Lube Oil Cooler, Gas Turbine Generator (GTG) & Gas Export Compressor piping system.
  • Coordinate with engineering, site construction team and offshore HUC team to identify and resolve issues related to piping system design, installation, pre-commissioning and commissioning.
  • Witness pre-commissioning activities, pipe route and supports and hydrotest deliverables ensuring that it meets project intent.
  • Oversaw calculation of technical specifications for use in procurement of piping components and raw materials.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Assisted project planning teams by providing data on scheduling, cost estimations and project scope calculations.
  • Incorporated solutions that met various project challenges and adhered to environmental, packaging and vibration requirements.

Mechanical Piping Engineer

PETRA RESOURCES SDN BHD
03.2011 - 07.2012

PROJECT

1) Client/ Owner: MURPHY OIL (SARAWAK) CORP. LTD

Project Title: HOOK-UP AND COMMISSIONING OF ADDITIONAL GAS WELL FACILITIES ON

EXISTING GOLOK-PA & GOLOK-PB (Upsizing Additional Flowlines)

2) Client/ Owner: PETRONAS CARIGALI SDN BHD

Project Title: Bokor-B Infill Drilling Project Revisit


Work Description:


  • Review scope of work in relation to drawing highlight. Highlight any unclear aspects of workscope and supplemental drawings for clarity of workscope (e.g Vendor manuals / data sheets etc.)
  • Mark-up drawings to highlight areas of installation and construction pertaining to workscope.
  • Prepare jobcards for mechanical / piping offshore installation.
  • Review AFC drawings and generate MTO for piping from isometric drawings
  • Checking offshore materials& equipment prior load out.
  • Allocate resources for workpack preparation and ensure even distribution of workload.
  • Prepare hydrotest package, spading plan and reinstatement leak test.
  • Prepare shop drawing for piping fabrication work.
  • Plan and coordinates with contractors on piping routing and equipment installation.
  • Marked up on P&ID’s test limit prior to conduct hydro testing for installation.
  • Participate in piping hydro-test, pre-commissioning piping re-instatement of pipe-spools and valves, line-flushing and flange-bolt tightening for offshore installation works.
  • Coordinate with other parties in the work groups to ensure smoothly project execution.
  • Provide punch list item of the remaining offshore work activities.
  • Prepare ITR, FTR, CC, MC and System handover certificate for commissioning activities.
  • Estimate man-hour requirement for each task based on the works requirement.
  • Participate in constructability review for the project and proposed method statement to ensure project can be accommodate within the construction windows and shut down period.
  • Prepare work planning, construction detail, works sequences for the projects.

SITE ENGINEER

SARKU ENGINEERING SERVICES SDN BHD
01.2007 - 02.2011

PROJECT

1) Client/ Owner: EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA

2) Client/ Owner: EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA

3) Client/ Owner: EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA

4) Client/ Owner: EXXONMOBIL EXPLORATION & PRODUCTION MALAYSIA


Work Description:


Project Title: Fabrication of Hang-Off Platform For Gumusut-Kakap Project

• Review AFC drawing and calculate piping and structure MTO.

• Prepare site technical query (STQ) if any changes design in AFC drawings

• Attend weekly & monthly progress meeting and highlight any issue to Client for clarification

• Monitor closely fabrication activities and solved any problems issues by construction team

• Prepare project specification procedure for Sapuraenergy approval prior commencing of project.

• Develop shop drawing for fabrication work.

• Provide vessel layout for load-out and sea-fastening design for lashing/tie-down activities

• Develop weld map for fabrication.

• Prepare Bill of Quantity for the Change Order Proposal.

• Prepare Sub-Contractor Scope of Work, such as for structure fabrication, blasting & painting, installation work and alignment tools.


Project Title: EMEPMI TOPSIDE MAJOR MAINTENANCE (TMM FCB 037

a) Project Title: Jerneh Shutdown- Fabrication replacement corroded air piping.

b) Project Title: Fabrication spool heat exchanger at Jerneh-A.

c) Project Title: GU-A, Seligi-A and Semangkok-B shutdown.

  • Provide technical information on equipment, materials, consumables and services during project tendering
  • Prepare material take-off from AFC drawing and prepare details material according to specification required prior proceeds to procure materials.
  • Attend monthly progress meeting with EPMI and highlight any issue during construction activities.
  • Source reliable suppliers to supply of equipment, material, consumables and services required for project execution.
  • ·To check the practicability of work pack i.e. planning sequence, resources requirement, relevant procedures, etc prior to work execution.
  • Monitoring daily schedule of construction activities at various stages and onsite condition.
  • Prepare site technical query (STQ) if any changes design in AFC drawing.
  • To carry out and implement work pack, interpret drawings and project planning for work execution.
  • Prepare job cards for piping and structure installation.
  • Identify all work scope amendments; prepare job cards as well as man-hour estimates.
  • To supervise work progress and prepare daily progress report.


Education

Bachelor (Hons) in Chemical Engineering - Chemical Engineering

MARA University of Technology
Shah Alam Selangor
09.2006

Diploma in Industrial Chemistry - Industrial Chemistry

MARA University of Technology
Arau Perlis
04.2003

Skills

  • EPCC Project Management
  • Piping Engineering Design
  • Software: Microsoft Office, AutoCAD Piping design basis
  • Estimate Costs and Budgeting
  • Commissioning Procedures
  • Site Acceptance Testing
  • Conversant with Codes and Standards such as ANSI, ASME, API, ASTM
  • Skilled in piping general arrangement drawing and piping tie-In schedule
  • Project Commissioning & Start-Up (RFSU)
  • Safety Reviews, PASR, ORA, PRA
  • Engineering, Management Change Order

Accomplishments


  • COURSE ATTENDED
  • Offshore Orientation, Basic First Aid, Basic Fire Fighting, Sea Survival and Helicopter Underwater Escape Training with Emergency Breathing System (BOSIET)
  • In House Training Project Management “ Managing by Project” (conducted by SapuraCrestPetroleum Bhd)
  • Introduction to Project Planning using Primavera Project Planner (P3) (conducted by CIDB & UTM Space KL)
  • Confined Space Entry Training (conducted by OSH Academy)
  • Applicant for Permit To work (PTW) system – Level 1 & 3.
  • Upstream CSR Compact HSE Awareness Training Programme – PCSB
  • Marine for Non-Mariner Course –PCSB
  • PETRONAS Internal Induction (Health, Safety & Environment) –PCSB

Affiliations

Register with BEM, Graduated Engineer.

Professional Technology, Ts.

  • Project Management Institute

Certification

- Attended Basic H2S Training Course by SeQu Offshore Training.

- Attended ANSI B31.3 Process Piping.

- Attended Marine for Non Mariner training, CIDB, HSE Compact CSR Offshore.

- Attended T-Boset training at SeQu Offshore Training.


Timeline

SENIOR HOOK-UP & COMMISSIONING ENGINEER

PETROLIAM NASIONAL BERHAD (PETRONAS)
07.2019 - Current

SENIOR PIPING ENGINEER

KEBABANGAN PETROLEUM OPERATING COMPANY (KPOC)
10.2018 - 06.2019

WORKPACK TEAM LEAD

DAYANG ENTERPRISE SDN BHD (DESB)
05.2016 - 09.2018

PIPING ENGINEER

JX NIPPON OIL & GAS EXPLORATION, MALAYSIA) LTD
06.2015 - 03.2016

PIPING ENGINEER

KEBABANGAN PETROLEUM OPERATING COMPANY (KPOC)
08.2012 - 04.2015

Mechanical Piping Engineer

PETRA RESOURCES SDN BHD
03.2011 - 07.2012

SITE ENGINEER

SARKU ENGINEERING SERVICES SDN BHD
01.2007 - 02.2011

Bachelor (Hons) in Chemical Engineering - Chemical Engineering

MARA University of Technology

Diploma in Industrial Chemistry - Industrial Chemistry

MARA University of Technology
YUSNAIDI DAHLAN