Summary
Overview
Work History
Education
Skills
LANGUAGES
REFERENCE
LIST OF PROJECT
APPENDIX
Certification
Timeline
Generic
WAN MOHD JUHARI BIN WAN JUSOH

WAN MOHD JUHARI BIN WAN JUSOH

Kerteh

Summary

As a dedicated leader in electrical, IT, and instrumentation, I take charge of setting and achieving strategic goals for our section. This involves overseeing the seamless installation, operation, and maintenance of a diverse range of equipment. I establish efficient schedules, implement effective policies, and foster a culture of innovation to ensure we stay at the forefront of techno-logical advancements. Committed to excellence, my aim is to shape the future trajectory of our section with precision and forward-thinking strategies, ensuring sustained success in a dynamic landscape.

Overview

2
2
Languages
1
1
Certification
22
22
years of professional experience

Work History

MHH Condition Monitoring Sdn Bhd

Assistant Branch Manager
Paka, Terengganu
05.2026 - Current
  • Coordinate teams to deliver quality work against strict deadlines.
  • Monitor construction processes across active work sites.
  • Track subcontractor activity, machinery usage, and materials planning on site.
  • Assist project engineer and project manager with administrative and general matters.
  • Schedule regular meetings with vendors, site inspectors, managers, and staff.
  • Maintain health and safety compliance at all times.
  • Write reports and budgets, then present project palms to stakeholders.
  • Stay current with safety codes and construction advancements.
  • Process paperwork and travel between multiple sites as required.
  • Check and approve materials and equipment at delivery on site.
  • Ensure adherence to safety procedures and regulations.

Project Supervisor

RB SPECTRA SDN BHD
Kerteh, Terengganu
01.2005 - 03.2026
  • Ensuring teams work together to deliver quality work to strict deadlines.
  • Monitoring construction processes.
  • To monitor sub - contrator at work site, site machinery usage, site material planning.
  • To assist the project engineer and project manager with administrative and general matters.
  • Scheduling regular meetings with vendors,site inspectors, Managers, and staff.
  • Ensuring adherence to health and safety regulations at all times.
  • Writing reports, budgets, project palms,and presenting them to relevant stakeholders.
  • Staying up to date with safety codes and advancement in construction.
  • Processing paperwork and traveling to multiple sites as required.
  • Checking and approving materials and equipment at the point of delivery at site.
  • Ensure adherence to safety procedures and regulations.
  • JOB INVOLVEMENT
  • Laying out high voltage electric cable.
  • Assemble and test experimental switchgear, switch panel, transformer, generator, solenoid and other electrical and instrument equipment.
  • HT & LT Power Distribution System.
  • Lighting & Power.
  • High mast lighting system.
  • Lightning protect system.
  • Power Quality System and Design.
  • Clean Power Circuits.
  • Control system with panel.
  • Telephone Wiring & Key System.
  • Public address system (PA).
  • Intercom system.
  • CCTV system.
  • Fire Protection System.
  • Computer Networks Cabling with IT equipment.
  • Emergency Power Supply with generator system.
  • Electrical Machines Servicing and Hood-up.
  • Troubleshooting electrical problems.
  • GATIR & TT4 Retrofit upgrade for Gas Turbine Compressor & Turbine Generator.
  • DDAC Starter upgrade for Gas Turbine Compressor.
  • Fire And Gas Upgrade for Turbine Generator.
  • Load Shedding Upgrade for Turbine Generator
  • Splicing fiber optic cable.
  • Installation EXd lighting and junction box.

Education

Beras Bestari Consultant -

INSTITUE LATIHAN FELDA
TROLAK, PERAK
06-2001

Malaysian Certificate of Education (SPM) -

SMK JENGKA 21
01-1999

Skills

  • Communication
  • Leadership
  • Time Management
  • Responsibility
  • Team Collaboration

LANGUAGES

Malay
English

LIST OF PROJECT

  • Standby Generator Set and Capacitor Bank for Petronas Dagangan Berhad.,
  • Kerja-kerja memeriksa , menguji dan kalibrasi "Protection Relay" serta menjalankan kerja-kerja servis dan overhaul permus lisar udara (ACB) termasuk pengujian dan tauliah guna di komplek Pejabat Petronas Wilayah Pantai Timur dan klinik Rantau Petronas.,
  • Upgrading works for Admin Building at Kuantan Bulk Depot, Tanjung Gelang, Kuantan for Petronas Dagangan Berhad.,
  • Membekal tenaga kerja, peralatan, jentera dan yang berkaitan dengannya bagi memasang 2 unit Meter Control Starter Panel for project Kilang Sawit Panji Alam Sdn Bhd.,
  • Provision of TMR upgrading system project at Petronas Gas Berhad, GPP-B., Renovation work for electrical at GAC Building & KNU Building at PETRONAS Gas Berhad, GPPA.,
  • Renovation work for electrical at new building Ranhill Worley at Kerteh,Terengganu.,
  • Remove the HLU & OLU and install new VCB at Petronas Gas Berhad, GPPA.,
  • Project installation new power distribution board at GPPA.,
  • Probe health check and verification at CUF Gebeng.,
  • Instrumentation Cabling installation of Bently Nevada VMS Gas Generator at Ethylene Sdn Bhd.,
  • Retrofication at Transformer & LV MCC at Guntong-D for Exxonmobi.,
  • Relocating Gas Detector at D35 for PCSB-SKO.,
  • TCP Upgrade at Tiong A Platform.,
  • JB Replacement at Baram A for PCSB-SKO.,
  • TT4 Upgrade at KCS-A for Petronas Gas BHD.,
  • TT4 Upgrade at GPP 3 for Petronas Gas BHD., TT4 Upgrade at TCOT for PCSB-PMO.,
  • Supply & Install Site office at GPPA & GPPB for Shinryo Kencana Consortium.,
  • EPCC Of Emergency Genset Set at Bintulu Aviation Terminal PDB.,
  • TT4 Upgrade at GPP 2 for Petronas Gas Berhad.,
  • SEPAM Relay Upgrading Work at Duyong A,B,C Platfrom Pulai.,
  • A Platform, Dulang A,B,C, D Platform, OSC and OGT for PCSB PMA., MOD 007 Fuel Gas System Upgrade At Muda A Platform for Carigali Petro Thai Operation Company ( CPOC ).,
  • ACB Upgrading Work at Dulang A, B, C, D Platform for PCSB PMA.,
  • GATIR & TT4 Upgrade for Petronas Carigali PMA.,
  • EPCC NGU 2 Second Feeder Upgrade at CUF Gebeng, Kuantan., Load Shedding Upgrade at East Piatu Platform for Supara Kencana Energy.,
  • Cogeneration Project at GPPB for Petronas Gas Berhad.,
  • TT4 Upgrade at GPP 4 for Petronas Gas Berhad.,
  • General Electric Maintenance at PCSB PMA.,
  • DDAC Starter Upgrade for Gas Turbine Compressor at D35 Platform Bintulu PCSB SKO.,
  • DDAC Starter Upgrade for Gas Turbine Compressor at Bayan A Platform Bintulu PCSB SKO.,
  • Fire and Gas Upgrade for Gas Turbine Compressor at Bayan A Platform PCSB SKO.,
  • Anomalert Installation Work at Kumang Platfrom PCSB SKG.,
  • MCC upgrade for LPS Project at Dulang C Platform PCSB PMA.,
  • MCC Upgrade at Duyong B Platfrom PCSB PMA.,
  • Anomalert Installation Work at Angsi Platfrom PCSB PMA.,
  • Anomalert Installation Work at Dulang Platfrom PCSB PMA.,
  • Anomalert Installation Work at Kinabalu Platfrom PCSB SBA.,
  • Anomalert Installation Work at Sumandak Platfrom PCSB SBA.,
  • Anomalert Installation Work at Kumang Platfrom PCSB PMA.,
  • Remove 2 Unit Busduct and Install New Busduct at Barantai Platform.,
  • Provision for Removal, Installation and Commissioning 7 Unit Transformer at Dulang and Duyung Platfrom PCSB PMA.,
  • TT5 Upgrade for Solar Mars Turbine at PCFK Gurun.,
  • TT5 Upgrade for Solar Mars Turbines at GPK-GPU.,
  • JB Replacement at F6 Platform, Sarawak Shell.,
  • Network Segregation for System 1 Bently Nevada at RAPID Pengerang.,
  • Troubleshoot Grounding for 3 Unit Turbine Generator at Belumut Platform.,
  • Gas Turbine Compressor (GTC-A) Retrofit Cabling Work at Berantai Platform.,
  • Install Ranger Pro at PCML Labuan., ELPIS Project at Utilities Kerteh, UK-GPU.,
  • Splicing fiber optic cable at Kilang Sawit LPM Gua Musang(Liquid Palm Miller SDN BHD).,
  • Splicing fiber optic cable at new OXY plant at Kerteh, Terengganu.,
  • Splicing fiber optic cable at Utilities Kerteh UK-GPU.,
  • To supply and replace EXd Lighting and EXd junction box at Kuantal Fuel Terminal, PDB.,
  • To Supply and replace EXd Lighting at LG Kerteh, PDB.,
  • TT5 Upgrade at Larut A Platfrom for Vestigo.,
  • MCC upgrading work at Sotong Colletor Platfrom for PCSB PMA.
  • Installation new is limiter panel at GPU UG Gebeng
  • Capacitor bank and UPS servicing at KBC Teluk Kalong Kemaman
  • UPS Panel Replacement at Muda LQ Platform/ CPOC
  • Installations Vortex Cooler at Muda LQ Platform/ CPOC

APPENDIX

  • Medical offshore exp date 09 Jul 2027
  • OGSP expiry 08 June 2029
  • T-FOET expiry 22 Feb 2029
  • CA EBS expiry 22 Feb 2027
  • CIDB expiry Sept 2027
  • NTSP expiry 08 Jul 2029

Certification

  • OPITO

- T-Bosiet with EBS & TravelSafety by Boat Basic Hydrogen Sulhipe (BH2S)

  • NIOSH

-Oil & Gas Safety Passport (OGSP)

Timeline

MHH Condition Monitoring Sdn Bhd

Assistant Branch Manager
05.2026 - Current

Project Supervisor

RB SPECTRA SDN BHD
01.2005 - 03.2026

Beras Bestari Consultant -

INSTITUE LATIHAN FELDA

Malaysian Certificate of Education (SPM) -

SMK JENGKA 21
WAN MOHD JUHARI BIN WAN JUSOH