Summary
Overview
Work History
Education
Skills
Websites
Core Skills
Timeline
Generic
WAN NUR FARHANA BINTI WAN MUDA

WAN NUR FARHANA BINTI WAN MUDA

Senior Material Planner
Pasir Gudang

Summary

Results-driven Senior Material Planner & Supply Chain Expert with over 10 years of experience optimizing inventory, reducing costs, and ensuring On-Time Delivery (OTD) for global manufacturing firms. Proficient in MRP/SAP systems, supplier collaboration, and Lean methodologies. Accomplishments include reduction in excess inventory, resulting in savings of $500K in 2024, and achieving a 95% OTD in 2024 for plant 2101. SAP super-user with expertise in Support Master Data and Material Planner Role. Skilled in Excel (Power Pivot), Power BI, and Microsoft Project. Strong analytical capabilities for data forecasting on buffer stock strategies and consumption-based planning.

Overview

12
12
years of professional experience
3
3
years of post-secondary education
2
2
Languages

Work History

Senior Material Planner

TechnipFMC
10.2022 - Current
  • Material planning for Subsea 2.0 CTO products, ensuring 99% availability of materials for $18M projects(BP MPX, Woodside Infill, Chevron Manifold in 2025.
  • Cost saving 2.5M USD on MOT Air to Sea by implement consumption based planning for Actuator.
  • Set MOQ in Master Data for 300+ SKUs to enjoying cost saving, cutting Supply chain cycle time by 20% on update MM auto PO conversion for sole supplier.
  • Improved supplier OTD to 95% by implementing SAP MRP exception monitoring.
  • Global teams: Working with GSP and engineering in the material readiness

Manufacturing Planner

TechnipFMC
01.2019 - 10.2022
  • Achieved 95% OTD for Surface products by coordinating procurement, QC, and warehouse teams.
  • Optimized machine loading, reducing lead times by 25% via farm-out strategies.

Material Planner

OneSubsea
01.2018 - 01.2019
  • Resolved 90% of material shortages within 48 hours (working time) work with SQE, QA on review critical part report Q section.
  • Saved 10 hours/week by developing automated exception reports.

Manufacturing Scheduler

Halliburton
01.2014 - 01.2016
  • Machine Capacity Optimization: Reducing target completion date by work with ME identify raw size with available machine capabilities.
  • Kanban Implementation: Design card system for assembly line kitting area, cutting WIP (Green: ready to go, Yellow: material shortages,, red: partial start)

Manufacturing Planner

ASM Technology
01.2013 - 01.2014
  • New Project Setup: Lead on planning material for project transfer by involving on creating PurReqs material transfer from intercompany, RFQ local vendor, tooling and AFE.
  • Output Planning: Achieved weekly delivery target through daily coordination with the production

Education

Bachelor of Engineering Technology (Hons) - Quality Engineering

Universiti Kuala Lumpur
01.2010 - 01.2013

Skills

  • Supply Chain Planning
  • MRP/MPS Strategies
  • SAP
  • Advance Power Bi
  • Excel
  • Demand Forecasting

Core Skills

MRP/MPS Strategies, Demand Forecasting, Inventory Optimization, SAP, Power BI & Excel (Advanced), Microsoft Project, Advance Power Bi, Excel, Power Apps (In Progress), 5S & A3 Project

Timeline

Senior Material Planner

TechnipFMC
10.2022 - Current

Manufacturing Planner

TechnipFMC
01.2019 - 10.2022

Material Planner

OneSubsea
01.2018 - 01.2019

Manufacturing Scheduler

Halliburton
01.2014 - 01.2016

Manufacturing Planner

ASM Technology
01.2013 - 01.2014

Bachelor of Engineering Technology (Hons) - Quality Engineering

Universiti Kuala Lumpur
01.2010 - 01.2013
WAN NUR FARHANA BINTI WAN MUDASenior Material Planner