Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic
Al Hussien Abdul Hamid

Al Hussien Abdul Hamid

Kajang, Selangor

Summary

Exciting news! I am a highly motivated and passionate professional with over 16 years of experience in the Oil and Gas industry, both downstream and upstream. During this time, I have designed, integrated, tested, and commissioned numerous small, medium, and large complex electrical power systems with various HV and LV electrical equipment.

My expertise includes working with gas-driven generators, diesel engine generators, distribution transformers, MV and LV switchboards, conventional and modular UPS, Ex-rated motors and panels, and electrical heaters. This has led to successful completion of various local and international projects.

In my career, I have demonstrated a strong focus on achieving results, meeting deadlines, and targets. My confidence, enthusiasm, excellent communication skills, and time management skills make me an accomplished, results-oriented individual.

I am interested in taking on new challenges and exploring new areas. Specifically, I am seeking a position as a Senior Electrical Engineer or Senior Executive on Renewable Energy as well as in Data Analytics. I believe my adaptability and high level of awareness make me an excellent fit for these roles.

Also, I am willing to explore new ventures on Non Technical position. Embracing change, I am determined to leap into a new career industry and relentlessly upskill, driven by my unwavering desire to achieve excellence and carve a path towards a fulfilling and successful future.

Overview

15
15
years of professional experience
4
4
years of post-secondary education
3
3
Certifications

Work History

Executice Race 2 Decarbonize

Petronas Enterprise Decarbonization, PD&T,
Kuala Lumpur
04.2023 - Current
  • Drove the strategic role of Lead Electrical Engineer, orchestrating the identification, selection, and sequence of impactful projects, optimizing execution strategies in partnership with PETRONAS OPU
  • Pioneered the advancement of their Decarbonization agenda
  • Total 4 Projects identified with estimated cost reaching RM120M
  • Collaborated seamlessly with PETRONAS OPU, deftly navigating intricate project landscapes, and ensuring the flawless execution of Decarbonization initiatives
  • Total yearly abatement for BESS deployments project identified is 0.032 mil tCO2e
  • Exemplified profound technical stewardship by spearheading the selection and deployment of Battery Energy Storage System (BESS) Projects throughout PETRONAS OPUs
  • Currently poised at the threshold of securing final investment decision (FID) approval for Malaysia's pioneering Utility Scale BESS project and the first offshore BESS deployment in the Asia Pacific region
  • Successfully addressed the complex challenge of site-specific constraints, leveraging my technical expertise to identify optimal locations for BESS deployment
  • This involved intricate analyses of terrain, grid connectivity, and local regulations, leading to a comprehensive site selection strategy that aligns with our sustainability goals
  • Assumed a commanding role as Electrical Lead in propelling cutting-edge technologies under the Race 2 Decarbonize initiative, encompassing Organic Rankine Cycle (ORC) tech, Natural Gas Fuel Cell tech, Regenerative Power Pack System, and Twin Screw Turbine.

Executive (Engineering Data)

Upstream Data, PETRONAS
Kuala Lumpur
04.2022 - 04.2023
  • Executice (Wells & Engineering Data)
  • Enabled seamless Upstream data operations through expert facilitation and execution, ensuring strict adherence to corporate and Upstream data governance
  • This catalyzed operational excellence, enabling Upstream to unlock unparalleled value from its data assets for strategic decision-making
  • Spearheaded the alignment of data operations with stringent corporate and Upstream data governance standards, minimizing risks and ensuring data integrity
  • Leveraged advanced Python programming, PowerBI, and MS Excel skills to translate complex Upstream data users' requirements into actionable solutions
  • Seamlessly transformed intricate data requirements into intuitive visualizations and reports using PowerBI, effectively catering to the unique needs of Upstream data users
  • Streamlined data processing pipelines utilizing Python, optimizing data accessibility, reliability, and efficiency.

Site Engineer

Petronas IRSO Sabah, PD&T
01.2019 - 04.2022
  • Successfully led and completed the execution of FIP SOGT Low Voltage Air Circuit Breaker 2500A retrofit for Substation 3 at SOGT admin building in September 2019, achieving a timely completion of electrical progress 1 week ahead of the approved PEP schedule with 0% HSE incidents
  • Expedited ACB delivery, reducing the lead time from 10 weeks to 4 weeks, resulting in a 60% reduction
  • Signed Initial Acceptance form on 9th September 2019
  • Oversaw and completed the FIP Portable Diesel Generator (PDG) Sync Panel and Electrical Cable project, meeting the PEP schedule within the approved budget with a 100% on-time completion rate
  • Recorded 0% HSE incidents during the 52-day project execution
  • Improved reliability of black start redundancy with a 50% reduction in downtime for Power and Control cable tie-in to the existing Electrical system
  • Completed FIP SMG ICT UPS Upgrading, with a planned completion rate of 100% in December 2019
  • Conducted FAT on 5th and 6th December 2019, aligned with the planned execution on 16th December 2019, achieving a 0% deviation
  • This project aims to improve UPS redundancy for ICT equipment at SAMARANG, ensuring safety and operability with 100% replication of new technology using SONICK batteries
  • Monitored the construction activities of EPCC and Subcontractors/Vendors for a specific work discipline, ensuring adherence to approved plans and procedures, resulting in improved safety, quality and efficiency of the project
  • Spearheaded communication with local authorities, namely Sabah Electricity Sdn Bhd, Tenaga Nasional Berhad, and Civil Aviation Authority of Malaysia (CAAM), for multiple projects, ensuring collaborative and effective communication, resulting in smooth project execution
  • Successfully delivering FIP Erb West and Samarang Heater and Control Panel Replacement, FIP SOGT 2nd Means of Blackstart, FIP SOGT ENMCS Ungrading, FIP SOGT 5000A ACB Retrofitting at 6.6kV HV Substation, meeting project objectives and timelines while adhering to quality and safety standards

Sr Executive

Petronas Carigali STS
01.2018 - 01.2019
  • Oversaw the end-to-end execution of Facilities Improvement Projects (FIP), from planning, budget acquisition, site execution, and handover to operation, resulting in timely and cost-effective project delivery
  • Managed stakeholder expectations on standards and executions, ensuring compliance with technical standards, and promptly reported, resolved, and escalated issues related to FIP and Technical Standards Issues, fostering a sense of ownership towards asset or projects in custody
  • Led the successful delivery of Electrical Engineering and Project deliverables for various Facilities Improvement projects Onshore and Offshore LV system, including FIP Zuhal East – Wind Turbine pilot project, FIP MTEG Pilot at Offshore Erb West, FIP Impressed Currect Cathodic Protection SOGT Project, FIP SBGAST ACB Retrofitting, and FIP Samarang and Erb West Relay Upgrading
  • Implemented effective project management proactive and collaborated with cross-functional teams to ensure adherence to quality, safety, and operational standards, resulting in increased efficiency and successful project outcomes
  • Maintained a proactive approach towards identifying project risks and implementing risk mitigation strategies, resulting in minimized project delays and cost overruns
  • Developed and maintained strong relationships with internal and external stakeholders, including suppliers, contractors, and regulatory authorities, ensuring smooth project execution and timely issue resolution

Lead Electrical Engineer

Petronas RAPID
02.2017 - 12.2017
  • Overseeing detailed engineering and construction of 4 nos of High Voltage 33kV Substations (SUB210, SUB240, SUB521 and SUB473) under TOYO Japan and TOYO Thai as main contractor for RAPID Package 5, Steam Cracker Project for PRPC
  • Led the review of EPCC contractors critical Electrical engineering drawings and vendor data, ensuring compliance with engineering document and data requirements set forth in the EPCC contracts and the documents review and approval matrix, resulting in streamlined project execution
  • Addressed EPCC contractors clarification requests on errors or inconsistencies in the FEED engineering deliverables, resulting in improved accuracy and reduced rework
  • Coordinated with licensors to ensure compliance check and deviation approval, particularly on BOMBA certification and Suruhanjaya Tenaga requirement, resulting in seamless project execution and regulatory compliance
  • Collaborated with other disciplines to ensure inter-discipline checks are being performed by EPCC Contractor, leading to a significant reduction in rework and change orders
  • Assisted the Field engineering & Permitting Manager/Area Construction Manager in monitoring and verifying the contractor discipline construction activities, ensuring contractual requirements in areas od Safety, Schedule, Quality and Cost were met, resulting in timely and cost-effective project delivery
  • Monitored the construction activities of EPCC and Subcontractors/Vendors for a specific Work Discipline, ensuring adherence to approved plans and procedures, resulting in improved safety, quality and efficiency of the project

Sr Executive

PC Turkemenistan Sdn Bhd
01.2015 - 01.2017
  • Led the electrical review on vendor drawings for fabricator supplied items during the construction of the Garagol Daniz Drilling Platform at Kiyanly yard, Turkmenistan, ensuring compliance with project requirements and regulations, resulting in successful project execution
  • Supervised cable laying, support installations of LV Systems onshore, wiring, earthing works, and panel installations for the construction of GDDP-A, ensuring adherence to safety and quality standards, resulting in timely and cost-effective project delivery
  • Led the 400V LV Switchboard FAT at ABB Korea, collaborating with the operation and project teams, resulting in successful project outcomes and improved efficiency
  • Led the investigation and resolution of HVAC rectification issues at an offsite substation, including RCA investigation, technical discussions with vendors, site visits, and MOC development for operations, resulting in improved system performance and increased customer satisfaction
  • Led site visits to onshore GTPOGT, Kiyanly Turkmenistan, and Offshore MCR-A to enhance design and familiarize with existing facilities, resulting in improved design and operational efficiency
  • Led a team in conducting ELSOR review to check 6.6kV electrical operability for the GR Magtymguly project, ensuring compliance with project requirements and regulations, resulting in successful project execution
  • Served as a focal person responsible for addressing electrical matters arising during HAZOP, HAZID, and LDR, resulting in improved safety and adherence to regulations
  • Leveraged technical expertise, project management skills, and cross-functional collaboration to drive successful project outcomes, resulting in increased efficiency, customer satisfaction and team performance.

Sr Executive

PT Technip Jakarta
07.2013 - 03.2015
  • Developed and reviewed Scope of Work (SOW) and Contract Technical Requirements (CTR) for GSWP Oil to be executed by engineering consultant for Conceptual Engineering, ensuring project requirements were clearly defined and met
  • Prepared and reviewed Power Generation Selection study to determine the best option for power generation
  • Led electrical system design for six different options of 400V LV Electrical System to meet Process and Operations needs, providing reliable and safe electrical systems
  • Conducted review on electrical deliverables during FEED and Detailed Engineering, ensuring high quality deliverables were achieved
  • Collaborated with potential GSWP users to improve design and increase flexibility to cater to a broader range of users
  • Participated in discussions with other PCSs to share lessons learned on implementing the design one, build many concept
  • Act as a team member to promote and market the GSWP Oil design to potential users in the PCSB fraternity
  • Led initiative to reduce weight and power consumption to minimize costs and make the design more attractive to potential users
  • Led a task force to solve issues related to electrical room requirements for HVAC and positive pressurization, ensuring safe and efficient operations

Electrical Engineer

MMHE, Gudang
Pasir
04.2009 - 06.2013
  • Contributed to the successful construction of the KNPG-B Topsides Platform at MMHE Pasir Gudang in 2009 and Hook Up Commissioning at Offshore Sabah in 2012, by leading key activities such as:
  • Reviewing and approving electrical fabrication shop drawings, testing and commissioning procedures, and final documentation, ensuring compliance with applicable standards and specifications
  • Leading commissioning activities for LV Electrical equipment at the fabrication yard and at the offshore site, conducting both Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT)
  • Conducting technical evaluations on Fabricators Electrical supplied items, including LV Switchboard, LV Busduct, Distribution Boards, Cable Ladder and LV Transformer, to ensure compliance with project requirements
  • Initiating and leading the Ex Inspection for Kinabalu NAG platform, collaborating with stakeholders from SIRIM, PETRONAS, PCSB and MMHE to ensure compliance with regulatory standards
  • Serving as the main point of contract for client queries and concerns related to Electrical issues during the construction process
  • Facilitating the review of Relay Coordination Study performed by third party consultant, ensuring compliance with project requirements

Education

BEng - Electrical & electronics, Control Engineering

Universiti Putra Malaysia
Malaysia
01.2002 - 02.2006

Skills

    Budgeting

undefined

Accomplishments

  • Lead Technical Data Operations on PRIME and P-EDMS as part of Centre of Excellence Upstream Data team
  • Initiate and Lead In-House Engineering for GTG 6.6kV System TCP Earthing Improvement project for SOGT which significantly improves system immunity against EMI and minimizing risk of trip due to EMI which haunt SOGT in previous trip incident2020
  • Lead project execution for 6 nos of Transformer Rectifier (TR) upgrading due to malfunction and obsoletion which may harm Cathodic Protection in SOGT
  • Lead execution of SOGT 2500A at LV Switchboard Retrofit project ahead od 1 week as per approved Plan
  • Expedite delivery of materials from 10 weeks to 4 weeks2019
  • Value Creation of RM788k
  • Lead and complete execution FIP PDG Sync Panel and Electrical Cable project
  • Timely completion as per schedule in PEP within approved budget
  • No HSE incidents recorded for 52 days (8976 safety man-hours) project executions
  • SMG ICT UPS Upgrading project with introduction of new SONICK batteries technology
  • Successfully obtain cash avoidance of 6% or RM95k discount obtained on total PO with Duta Berkat Corporation as well as cash avoidance of RM190k for WOP by PETRA
  • Initiate and Pilot New Tech of ‘Future Proof’ ACB Masterpact as part of Going Digital Inititive by Petronas at SOGT Plant at Sabah
  • Issued and Closed NCR to main contractor for RAPID P5 Project at Pengerang on 11kV and 400V HV and LV Switchgear and AC Motors issues on preservation timely and effectively at SUBSTATIONS
  • Lead cost saving initiative od USB78,000 by changing HVAC system to split unit type with still following international standards for Turkmenistan substation- 2014
  • Lead Electrical for Design Optimization and Drive Cost Saving initiative for Generic Satellite Wellhead Platform (GSWP) Oil- 2013
  • Electrical Engineer on successful delivery of KNPG-B Platform Onshore Fabrication at MMHE as well as Offshore HUC for KNPG-B

Certification

ESG Malaysia - Professional Member

Timeline

ESG Malaysia - Professional Member

10-2023

Executice Race 2 Decarbonize

Petronas Enterprise Decarbonization, PD&T,
04.2023 - Current

Malaysia Board of Technologist- Professional technologist - P Tech

11-2022

Executive (Engineering Data)

Upstream Data, PETRONAS
04.2022 - 04.2023

Site Engineer

Petronas IRSO Sabah, PD&T
01.2019 - 04.2022

Sr Executive

Petronas Carigali STS
01.2018 - 01.2019

Lead Electrical Engineer

Petronas RAPID
02.2017 - 12.2017

Sr Executive

PC Turkemenistan Sdn Bhd
01.2015 - 01.2017

Sr Executive

PT Technip Jakarta
07.2013 - 03.2015

Electrical Engineer

MMHE, Gudang
04.2009 - 06.2013

Board of Engineers - Graduate Member

06-2008

BEng - Electrical & electronics, Control Engineering

Universiti Putra Malaysia
01.2002 - 02.2006
Al Hussien Abdul Hamid