Skilled in mechanical engineering with 10 years of experiences, had improves and maintaining tools, power plant processing systems, and equipment. Seeking to leverage my expertise to join your Company as a Lead Mechanical Engineer or equivalent.
Established since 2006 and has been providing operating and maintenance services to the SBPC 100MW Combined Cycle power plant at Kota Kinabalu Sabah.
Established since 2006 and has been providing operating and maintenance services to the SBPC 100MW Combined Cycle power plant at Kota Kinabalu Sabah.
Owned by Samling Group of Companies with capacity of 45mt. Had received nationwide acclaim from MPOB for achieving the highest OER in year 2002 and 2007.
Teamwork
2Nd Grade Steam Engineer License. (DOSH)
GT2 HGPI 2015.
Unit Frame 6B
Date: October 17, 2015
Duration: 14 days
GT1 HGPI 2016.
Unit Frame 6B
Date: March 26, 2016
Duration: 13 days
GT2 MI 2019.
Date: Unit Frame 6B
October 29, 2019
Duration: 28 days
GT1 MI 2020.
Unit Frame 6B
Date: July 26, 2020
Duration: 23 days
STMI 2018.
Type: Single cylinder, impulse, single flow, induction condensing turbine, indoor type.
Date: July 6, 2018
Duration: 30 days
STMI 2022.
Type: Single cylinder, impulse, single flow, induction
Condensing turbine, indoor type.
Date: July 23, 2022
Duration: 28 days
Annual HRSGs Overhaul & DOSH Inspection.
Duration: 14 days
Quarterly GT OLWW.
Duration: 2 days
Underground Gas Pipeline Integrity Inspection 2019.
Date: May 17, 2019
Duration: 3 days
New Fire Hydrant Pipeline Installation, above ground 2022/2023.
Date: In progress.
Duration: 2 weeks
Other Projects
1. GTs Accessories Gearbox overhaul.
2. GTs Load Gearbox overhaul.
3. GTs Exhaust Plenum repair.
4. HRSGs lateral during repair.
5. Aux. Firetube Boiler service & overhaul.
6. HP BFW pumps overhaul.
7. ACC Reduction gearbox overhaul.
8. Gas skid PSVs servicing & calibration.
9. Aux. pumps overhaul.
10. FF Duty pumps overhaul.
11. FF Foam tank, bladder replacement.
12. Daily tank diesel cleaning.
13. Underground FF Hydrant pipeline leaks repair.
14. Boiler valves servicing (CV) & replacement (manual valve).
15. GT LO heat exchanger tube burst plugging repair.
16. Steam air ejector cooler tube burst plugging repair.
17. Fabricated LO Filtration portable unit.
18. Built car park roofing x 30 lots.
19. Built room petition for Surau.
20. Built a proper SW storage.
AGTES (NIOSH-DOSH)
Member of Board of Engineers Malaysia. (BEM)
CEPSWaM. (DOE)
2Nd Grade Steam Engineer License. (DOSH)