Accomplished telecommunications and network administrator professional with a proven track record at TIME DotCom Berhad, specializing in fiber optic technology, network equipments and project management. Demonstrated expertise in vendor management and network systems installation, complemented by strong problem-solving abilities and teamwork. Achieved significant improvements in network performance and operational efficiency, ensuring high-quality service delivery.
Customer Access Network (CAN):
Lead the Customer Access Network (CAN) schedule routine maintenance, monitor network performance, analyze and restored fault, includes TIME services such as Metro Ethernet, VOIP/SIP Trunk, Voice Switching & DWDM. These include:
· Carrying out activation work including site surveying, preparation of cabling work, equipment installation, and service testing.
• Provide necessary on-site technical support.
• Schedule maintenance requirements and performance on core network.
• Ensure that the quality of the field workmanship carried out
• Ensure occupational health and safety requirements are adhered to
• Manage routine maintenance done within time given.
• Monitor and respond to Network alarm.
• Analyses the cause of network failure and recommends action to eliminate fault causes.
Outside Plant (OSP):
Outside Plant Fiber Optic network (Underground & Overhead):
· Coordinate and monitor project progress at site to ensure meeting dateline and address any issues to manager.
· Ensure works done by contractors are in accordance to the Company’s specification and local authority standard specification.
· Evaluate contractor’s performance and proposing action plan to improve performance.
· On site acceptance test for newly infra from contractor’s.
· Rotate Standby and respond to fiber cut monitored by TIME service operation centre (SOC) team.
· Monitor and managed OSP by reducing network outages.
· Issues Purchase Order (PO) for Maintenance Work Order to contractors.
· Documented OSP as build drawing and fiber configuration.
· Managed panel contractors for planned and corrective maintenance.
Fiber optic technology
Project management
Vendor management experience
Telecommunications field service
Network systems installation
Hardware installation
Problem-solving abilities
Technical troubleshooting
Teamwork and collaboration
KEY EXPEREINCE TIMELINE YEAR 2017 – 2024
SKR1M (Sistem Kabel Rakyat 1Malaysia)
(1)11-28 Feb 2017: Involved in SKR1M as a TIME representative in project Bintulu Pre Laid Shore End (PLSE).
(2)1-10 March 2017: Involved in SKR1M as a TIME representative project Bintulu - Miri Main Lay Cable Installation.
(3)April – May: Involved and supervising contractor for Buntal CLS (Cable Landing Station) preparation such as, electricity, room preparation and cable building access.
TIME Borneo Fiberization Project (2017)
(4) May – June: Involved TIME Borneo Fiberization Project (33KM) to link up Digi TOC Kuching, Maxis TOC Kuching, Samajaya, and TIME Crown Plaza node. This includes supervising & coordinate contractors doing civil work, pulling UG and aerial fibre optic cable, fibre-core assignments, manhole installation, HDD works, fibre optics splicing, fibre optic termination, building access to Digi Kuching, Maxis Kuching, Crown Plaza and Samajaya.
(5) Hands-on installation, troubleshooting and maintenance Mtera DWDM equipments as well as handling Ve-Ex test gear (10gb & 100gb).
(6) Aug: Workshop / Training Mtera DWDM at Glenmarie Shah Alam.
(7) Sept 2017 – Jan 2018: Involved in designing and supervising contractors to link up Celcom TOC, Digi TOC 2nd access Kuching and Aerial cable from Buntal CLS to Junction Merican. This includes, HDD cable pulling UG and aerial, fibre assignments, fibre termination, fibre testing and Mtera DWDM installation. In addition to that, I organized the internal Planned Event fibre optic ring cut for Digi TOC 2nd access Kuching.
(8) April 2018: Project Manager for SAINS fiberization Wisma Bapa Malaysia. Which including planning & supervising contractors for civil works, fiber cable pulling & fiber core assignment.
(10) Jan 2019 - Involved in designing and supervising contractors for new Miri TIME node, TM SKDL to TIME Miri Node.
(11) Feb 2022 - Designing, supervising and commissioning TIME dotcom underground and overhead cable relocation due to JKR road widening at Jalan Diplomatic Kuching.
(12) Jan 2023 (on-going) - Designing, supervising and commissioning TIME dotcom underground cable relocation due to KUTS ART Project for Redline, Blue Line package 2, Greenline package 1 and 2.