Summary
Overview
Work History
Education
Skills
Certification
Software
References
Timeline
Generic
SYAZWAN WAN IBRAHIM

SYAZWAN WAN IBRAHIM

Drilling Manager / Senior Drilling Engineer
KUALA LUMPUR

Summary

Experienced drilling manager with 17 years of expertise in leading complex drilling operations and optimizing projects in exploration and development phase. Proven ability to manage multi-million dollar budgets, prioritize safety and environmental standards, and effectively handle stakeholders. Skilled in driving innovative drilling strategies and mentoring teams to achieve operational excellence. Committed to leveraging technical knowledge and leadership skills to enhance drilling performance and deliver value-driven solutions. Passionate about integrating new technologies for improved efficiency and sustainability in drilling activities.

Overview

17
17
years of professional experience
7
7
years of post-secondary education
1
1
Certification

Work History

WELLS MANAGER

WELLS MALAYSIA EXPLORATION, PETRONAS
09.2023 - Current

Led a team of seven engineers, overseeing the planning and execution of an average of three exploration wells annually, each with varying complexities. Managed a total budget of USD 150 million per year, ensuring cost efficiency without compromising safety or operational excellence.

  • Spearheaded the plan and execution of company HSE policy by ensuring full compliance during operations. Championed a strong safety culture by leading initiatives that minimized operational risks and improved the mental health of crew working offshore. Conducted regular management HSE visits to the rig to drive continuous improvement in drilling operations
  • Led end to end drilling planning and execution, optimizing well designs, casing programs and drilling operations to maximize efficiency and drive cost-effectiveness. Collaborated cross-functionally with subsurface and service partners in ensuring seamless integration of drilling objectives with overall field development strategies. Proactively identified and mitigated operational challenges, reducing NPT and optimizing rig utilization
  • Continuously explored, assessed and implemented cutting-edge drilling technologies to improve safety, operational efficiency and cost. Successfully introduced new technologies to assist the plug & abandonment activities of the well, reducing vibration with downhole tools technologies and offline rig capabilities to drive performance improvements while maintaining high safety and environmental standards

MANAGER

WELLS MALAYSIA JOINT VENTURE, PETRONAS
01.2022 - 08.2023

Strategize and monitor the development and implementation of drilling strategy and solutions for Joint Operated Block and Operated by Others of JV Drilling ventures in respective areas to safeguard business strategic interest and safeguard company objectives and aspirations

  • Steer cost and operation optimization of SK408 drilling campaign for six (6) high rates carbonate gas wells utilizing synthetic-based mud with PMCD method resulting in cost containment of USD 2 Million
  • Steer new technology utilization in plug & abandonment (P&A) campaign of three (3) PM8E wells on through tubing cement logging. The technology allows the cement logging to be conducted prior rig arrival through tubing. Managed to save 1.5 days of spread rates (rigs and associate services) approximately USD 500 k.

SENIOR WELL ENGINEER

PETRONAS
04.2021 - 12.2021

Led a digital initiative on improving the accuracy of Authorization for Expenditure (AFE) estimates via machine learning utilizing Phyton Programming

  • Provide technical support for Joint Venture Company on well planning, engineering and operation
  • Protect PETRONAS interest (on wells perspective) in the Joint Venture ensuring maximum value creation in reviewing its plan activities and budget
  • Actively promote HSSE and Sustainable Development (SD) in all activities and ensure compliance with business principles

SENIOR WELL ENGINEER, SOUTH SUDAN OPERATION

PETRONAS
12.2016 - 03.2021

Seconded by PETRONAS to Dar Petroleum Operating Company (DPOC) as Senior Well Engineer.

  • Lead engineer preparing engineering program averaging 50 wells with ESP and PCP completion per year with 4 land rig which include of Development, Exploration, Water Disposal, Water Injector and Plug & Abandoning (P&A) in highly depleted reservoir
  • Established internal Well Engineering and Drilling Operation manual for the company as a standard operating procedure in well design in ensuring the well design and operation follow the industry standard
  • Optimized the well design and adopted for slim well architecture which translated to cost containment of USD 600K per well
  • Spearheaded the 'zero discharged' initiatives where drill cuttings, sludges and used mud were treated to an acceptable quality before properly discharged
  • Trained and coached local four (4) well engineers to be capable and up to the industry standard

WELL ENGINEER

PETRONAS
08.2013 - 12.2016
  • Lead engineer for planning and executing two (2) exploration wells with a narrow margin and basement drilling challenges utilizing semi-submersible and jack-up rig
  • Drilled Limbayong-3ST1 with a water depth of 1000m offshore Sabah with PMCD ready due to total losses expected in the carbonate formation
  • Drilled Pendekar-1 well offshore Lahad Datu with Constant Bottom Hole Pressure (CBHP) Managed Pressure Drilling (MPD) technology ready to enable drilling into narrow margin zone as expecting a total losses basement formation
  • Setting up new temporary support base and helibase at Lahad Datu and Sandakan as the drilling activity took place in the new frontier
  • Work closely with related government agencies for special protection as the drilling site was in the area categorized as a high-security threat area
  • Well Engineer planning and executing three (3) wells on the Straits of Melaka Exploration Campaign utilizing Pressurized Mud Cap Drilling (PMCD) technology on semi-submersible rig
  • Drilling into carbonate formation where total losses was expected and wireline logging in PMCD was planned
  • Led the team in setting up a temporary support base, helibase and logistic requirements as the drilling campaign took place in a new territory
  • Work closely with the Malaysian Authorities for security support as the area has been classified as a piracy threat
  • Lead on well planning and execution of Limau Manis-A well with two casing strings (Low Cost Well)
  • Optimized the well with 13-3/8" Casing While Drilling (CWD) for the top hole section in addressing the issue of well stability
  • Well was drilled, logged and abandoned 7 days ahead of time and with lower than planned cost

WELLSITE ENGINEER, DEVELOPMENT PROJECT

PETRONAS
04.2012 - 07.2013
  • Drilling Engineer on planning & executing two (2) ERD wells with 2:1 ratio one of it is the longest well in Malaysia using a tender-assisted drilling rig
  • Ran 9-5/8" liner on floatation in long 12-1/4" hole section which enables to reduce the drag
  • Support Drilling operations as a Wellsite Drilling Engineer and was involved with calculating cementing activities, casing tallies, and preparing Daily Drilling Reports and Daily Cost Reports
  • Plan, engineered and supported on the operation of one infill well of Bekok A platform with tender assisted drilling rig
  • Well was planned, drilled and landed horizontally using Geosteering and completed with sand screen
  • Managed to drill the well to its technical limits where the drilling of the intermediate hole with lower than expected LOT
  • MOC was obtained prior to drilling ahead
  • Successfully delivered the well with lower than planned cost and within the planned schedule

PETROLEUM ENGINEER

PETRONAS
04.2010 - 03.2012
  • Assist superior on planning and implementing PE activities for field development by influencing JV Partners to prudently develop oil and gas discoveries, ensuring the application of optimum technology, managing development risks, and resolving project implementation challenges for timely monetization in achieving PETRONAS Corporate Agenda target
  • Assist superior on developing PE activities and influence Host Government and JV Partners to evaluate near field potentials in matured basins, by providing technical expertise and recommendations for the Management and JV Partners in order to sustain PETRONAS' reserve growth
  • Assist superior on reviewing and evaluating subsurface proposal & performance by recommending optimum technical solutions and influencing JV Partners in optimizing reservoir development to achieve PETRONAS production growth and maximize value creation
  • Advise and recommend technical decisions to respective JV Management and Partners on PE matters through comprehensive and accurate technical review & evaluation throughout field development to maximize hydrocarbon recovery and value creation for PETRONAS upstream and downstream businesses
  • Coordinate, monitor and review all well proposal and NOOP, daily drilling operational report and final well report

PROJECT ENGINEER

PETRONAS
04.2008 - 03.2010
  • Project engineer for Phase 2 Rejuvenation and De-Bottlenecking (P2RD) of Plant-1 production and been assigned for Cooling Tower Package which involves in designing, procurement, construction, installation and commissioning of the package
  • Engineer for April 2009 ASU Thawing where in charge of Flue Gas Duct refractory repair including physical inspection and repair
  • Members in Process Safety Information (PSI) and Management of Change (MOC) which elements of Process Safety Management (PSM) as part of Plant Safety Improvement

Education

BACHELOR OF ENGINEERING (HONOURS) - MECHANICAL ENGINEERING

UNIVERSITI TEKNOLOGI PETRONAS
Teronoh, Perak, Malaysia
04.2001 - 05.2008

Skills

Drilling Operations

Certification

IWCF Level 4

Software

WELLCAT

DrillBench

COMPASS

WELLPLAN

CasingSeat

OpenWells

References

Azral Abdul Rahim

Head of Wells Malaysia

PETRONAS Carigali Sdn Bhd

+60 19 651 2171

azral_rahim@petronas.com


Norhisham Safiin

Senior Manager - Wells Engineering & Contract

PETRONAS Carigali Sdn Bhd

+60 12 231 2045

norhisa@petronas.com

Timeline

IWCF Level 4

03-2024

WELLS MANAGER

WELLS MALAYSIA EXPLORATION, PETRONAS
09.2023 - Current

MANAGER

WELLS MALAYSIA JOINT VENTURE, PETRONAS
01.2022 - 08.2023

SENIOR WELL ENGINEER

PETRONAS
04.2021 - 12.2021

SENIOR WELL ENGINEER, SOUTH SUDAN OPERATION

PETRONAS
12.2016 - 03.2021

WELL ENGINEER

PETRONAS
08.2013 - 12.2016

WELLSITE ENGINEER, DEVELOPMENT PROJECT

PETRONAS
04.2012 - 07.2013

PETROLEUM ENGINEER

PETRONAS
04.2010 - 03.2012

PROJECT ENGINEER

PETRONAS
04.2008 - 03.2010

BACHELOR OF ENGINEERING (HONOURS) - MECHANICAL ENGINEERING

UNIVERSITI TEKNOLOGI PETRONAS
04.2001 - 05.2008
SYAZWAN WAN IBRAHIMDrilling Manager / Senior Drilling Engineer