Summary
Overview
Work History
Education
Skills
Certification
Key Projects Summary
References
Timeline
background-images
SYAHRUL IZAD BIN ABDUL KARIM

SYAHRUL IZAD BIN ABDUL KARIM

Shah Alam

Summary

Client Representative and Senior Welding & NDT Inspector with over 15 years of experience in offshore, subsea, and topside construction projects. Proven track record in EFAT and FAT integrated testing using Yokogawa software, AUT/PAUT validation, and QA/QC supervision for major operators including Shell, Petronas, and Worley. Extensive knowledge of international codes and standards (ASME, API, DNV, ISO, Shell DEP) and a strong focus on safety, quality, and timely project delivery.

Overview

20
20
years of professional experience
1
1
Certification

Work History

General/NDT Inspector (Client Representative)

Sarawak Shell Berhad
08.2023 - 09.2025
  • Oversaw EFAT and integrated testing for subsea control modules (SCM) and hydraulic systems (HPU) using Yokogawa software.
  • Supervised welding and NDT activities for 207.5 km of 32” and 4.5” MEG lines under the Marjoram and Crux Projects.
  • Validated AUT/PAUT procedures and data per ASME Section V and ISO 13588 standards.
  • Ensured compliance with Shell DEP and managed QA/QC documentation for final project handover.

Construction Supervisor

Worley Pte Ltd
06.2018 - 05.2023
  • Supervised 230kV submarine power cable EPC for Singapore Power Group.
  • Ensured full QA/QC and HSE compliance between Singapore and Malaysian authorities.
  • Monitored marine installation, trenching, testing, and commissioning operations, ensuring zero LTI incidents.
  • Worley is a global engineering company providing project delivery and asset services to the resources and energy sectors.

General/NDT Inspector (Client Representative)

Petronas Carigali Sdn Bhd
03.2010 - 12.2017
  • Supervised pipeline and subsea installation (Bardegg, BNCPP, Kanowit).
  • Conducted AUT validation, EFAT testing, hydrotesting, and pre-commissioning activities.
  • Ensured full compliance with ASME, API, and Petronas QA/QC specifications.

QA/QC Engineer

VH Energy Sdn Bhd
03.2013 - 06.2013
  • QA/QC Engineer for Brunei Methanol MEF project.
  • Performed inspection and documentation review for marine hose replacement operations in accordance with OCIMF guidelines.

QC Inspector / NDT Technician

01.2006 - 12.2010
  • Performed UT, PT, and MT inspections for pipeline, riser, and structural works across Petronas, Shell, and CPOC offshore projects.
  • Ensured equipment calibration, weld quality, and compliance with ASME, API, and ISO codes.

Education

Higher National Diploma - Electrical & Electronic Engineering

Terengganu Advanced Technical Institute
01.2002

Skills

  • Welding
  • NDT
  • QA/QC Inspection
  • EFAT/FAT Integrated Testing
  • Yokogawa Software
  • Subsea Construction Supervision
  • Offshore Construction Supervision
  • Topside Construction Supervision
  • Pipeline Installation
  • Pre-commissioning
  • WPS
  • ITP
  • WPQT
  • Documentation Review
  • HSE Compliance
  • Risk Management
  • Client Interface Coordination
  • Contractor Interface Coordination

Certification

  • CSWIP 3.1 Certified Welding Inspector, TWI, 08/28
  • CSWIP Level 2 in AUT Data Interpretation, TWI, TBA
  • AUT Data Interpretation Level II, SNT-TC-1A, 06/29
  • PCN Level II in PAUT, BINDT, TBA
  • PT & MT Level II, ISO 9712:2012, 2029
  • GCPV Design Course, SEDA, 03/23

Key Projects Summary

  • Shell Crux / Rosmari Marjoram – Subsea System EFAT with Yokogawa simulation; 207.5 km of 32”, 4.5” and 20 km of 16” CRA offshore pipeline system.
  • Worley / Singapore Power Group – 230kV Submarine Power Cable EPC, QA/QC and construction supervision across SG-MY border.
  • Petronas Carigali – Offshore and Subsea installation (Bardegg, BNCPP, Kanowit, SKO fields), AUT/EFAT testing and QA/QC coordination.
  • Brunei Methanol – SBM Hose Replacement QA/QC engineering and pre-deployment testing oversight.
  • Various Offshore Fabrication/Construction Projects – NDT inspection (UT, PT, MT), AUT/PAUT validation, FAT/EFAT testing and pre-commissioning.

References

  • Hammad Khan, Project Manager, Worley, hammad.khan@worley.com
  • Gary Chong, Pipeline Engineer, Shell, Gary.Chong@shell.com

Timeline

General/NDT Inspector (Client Representative)

Sarawak Shell Berhad
08.2023 - 09.2025

Construction Supervisor

Worley Pte Ltd
06.2018 - 05.2023

QA/QC Engineer

VH Energy Sdn Bhd
03.2013 - 06.2013

General/NDT Inspector (Client Representative)

Petronas Carigali Sdn Bhd
03.2010 - 12.2017

QC Inspector / NDT Technician

01.2006 - 12.2010

Higher National Diploma - Electrical & Electronic Engineering

Terengganu Advanced Technical Institute
SYAHRUL IZAD BIN ABDUL KARIM