Summary
Overview
Work History
Education
Skills
Timeline
Generic

SOO KEONG NG

Equipment Engineering
Bayan Lepas, Penang

Summary

JOB TARGET

To seek and secure an Equipment Manager position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

MAJOR ACHIEVEMENTS

  • A highly motivated individual with 10+ years of process and equipment engineering experiences as well 5 years of maintenance management leadership roles, with OSRAM Opto Semiconductors Manufacturing company in Malaysia, which works in team of 155 engineers and project coordination in LED wafer frontend processing semiconductor industry.
  • Manage a pilot project team for Wafer Frontend and successfully implemented the SAP PM system and eMR project with 100% used in Greenfield Project.

BUSINESS MANAGEMENT

  • Coordinated 10+ projects with budgets over EUR600,000
  • Optimized Equipment Maintenance processes to reduce inefficient maintenance expenditures by 27%
  • Successfully collaborated with cross functional teams of 10~20 colleagues on cost reduction strategies which helped reduce 23% of inventory cost

KEY STRENGTHS

  • Agile and adaptable staff leader with stellar work history, motivational approach and upbeat nature.
  • Skilled at training employees and leveraging organized approaches to handle daily planning, scheduling and equipment service requirements.
  • Forward-thinking and industrious with diplomatic communication style focused on maximizing engagement and satisfaction.

Overview

22
22
years of professional experience
3
3

Years of tertiary education

4
4
Languages

Work History

Staff Engineer (Wafer FE Maintenance Management)

OSRAM Opto Semiconductors (Malaysia) Sdn. Bhd.
Kulim, Kedah
09.2017 - Current

Key Responsibilities :

  • Manage and develop Equipment Maintenance business process to meet business needs as well drive effective execution of maintenance performance to meet organization objectives.
  • Developed and implemented performance improvement strategies and plans to promote continuous improvement.
  • Outlined work plans, determined resources, created timelines and generated initial budgets as part of project scope determination for Spare Parts Inventory Reduction projects.
  • Lead in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.

Key Achievements :

  • Managed the highly successful Cost Down project on Frontend Vacuum system pump’s maintenance for 3 years. Qualified local pump repair vendor support to reduce pump repair time by 50% & cost down by 30% at plant wide level.
  • Led a pilot project team to implement CBM & FDC concept on predictive maintenance as well integrated to MES system.

Specialist Engineer (Process & Equipment)

OSRAM Opto Semiconductors (Malaysia) Sdn. Bhd.
Bayan Lepas, Penang
09.2007 - 08.2017

Key Responsibilities :

  • Learned New Lift Off Process (LOP) technology know-how and transferred from Rbg headquarter as part of Pioneer setup team.
  • Coordinated installation of new equipments setup and facilities hookup. Conducted new equipments buy-off and qualified process evaluation to release for production.
  • Led team of 16 technicians in carry out service maintenance and implementing periodic preventive maintenance programs.
  • Trained and mentored 3 over 5 junior engineers to improve efficiency and productivity.

Key Achievements :

  • Led pilot project team to implement SAP PM system and act as main coordinator for Wafer Frontend team on SAP PM related topics at plant wide level.
  • Managed Lift Off Process (LOP) Au reclaim project and act as project leader on Tape Lift-off (TLO) Mylar Au reclaim to achieve 95% on actual return.

Senior Equipment Engineer (Photolithography)

Unisem-Advanpack Technologies Sdn. Bhd.
Ipoh, Perak
03.2005 - 07.2007

Key Responsibilities :

  • Coordinated wafer bump Fab start up for clean room facilities and organized floor plan layout for installation of wafer bumping equipments.
  • Conducted new equipment's buy-off for final acceptance test and performed internal qualification with process engineer to release for production.
  • Managed Metrology tools and instruments to fulfill ISO 9001 standard calibration requirement.

Key Achievements :

  • Successfully installed UAT Lot Traveler Generation System with external software developers and implemented error proofing barcode scanning system into key process equipments.
  • Formulated activities focused on minimizing downtime and improve equipment efficiency by 20%. Highlights potential pitfalls and equipment potential issues that might have major impact on Equipment Engineering goals and eventually to production performance.

Equipment Engineer (Plasma Dry Etch)

Chartered Semiconductor Manufacturing Ltd.
Singapore
06.1999 - 04.2004

Key Responsibilities :

  • Collaborated with team members in optimizing equipment utilization for yield improvement and cycle time to achieve targeted results.
  • Used coordination and planning skills to carry out equipment maintenance to ensure performance consistency according to process specifications.
  • Reorganized filing system on PM scheduling and maintenance procedures according to QS 9000 specifications for ease of access and systematic documentation for Etch department.

Key Achievements :

  • Managed to save cost for US$300k by performing maintenance service and refurbishment in-house for spare Heat Exchanger Module on Cost Reduction Project and improved AMT8300 Metal Etcher performance.
  • Participated in Defect Density Reduction team for Metal Etcher system on Particle Reduction project and achieved target to win Best Quality Awards.

Education

Mechatronics Engineering

Nanyang Polytechnic
Singapore
05.1996 - 05.1999

Skills

Knowledge Transfer Management

undefined

Timeline

Staff Engineer (Wafer FE Maintenance Management)

OSRAM Opto Semiconductors (Malaysia) Sdn. Bhd.
09.2017 - Current

Specialist Engineer (Process & Equipment)

OSRAM Opto Semiconductors (Malaysia) Sdn. Bhd.
09.2007 - 08.2017

Senior Equipment Engineer (Photolithography)

Unisem-Advanpack Technologies Sdn. Bhd.
03.2005 - 07.2007

Equipment Engineer (Plasma Dry Etch)

Chartered Semiconductor Manufacturing Ltd.
06.1999 - 04.2004

Mechatronics Engineering

Nanyang Polytechnic
05.1996 - 05.1999
SOO KEONG NGEquipment Engineering