Summary
Overview
Work History
Education
Skills
Timeline
Generic

S.Moganaganes Mogan

Project Manager
Seremban, Negeri Sembilan,05

Summary

Accomplished Project manager with a proven track record at FLEXIL ENGINEERING SDH BHD, specializing in project and operations management. Excelled in driving efficiency and spearheading business development initiatives. Demonstrated expertise in team leadership and project management, achieving significant improvements in project delivery and operational processes.

Overview

15
15
years of professional experience

Work History

Project Manager

FLEXIL ENGINEERING SDH BHD
10.2022 - Current
  • Planned, designed, and scheduled phases for large projects related to Schedule waste business.
  • Monitored project performance to identify areas of improvement and make adjustments.

Projects:

  • Design & develop BOO business model on custom made portable medical waste incinerator (SW404). Operate & maintain 3 units of small medial incinerator at 3 main concessionaires (RADICARE Selangor, UEM EDGENTA Taiping &SEDAFIAT Sabah)
  • Design & Develop BOO business model on custom made Strong Acid Neutralization (SW206) at Cenviro Kualiti Alam Sdn Bhd.
  • Design & fabricate furnace system to treat SW422 waste code for MS Waste Sdn Bhd.
  • Managing the project & assist EIA consultant to set-up the new Schedule Waste Recovery plant at Melaka.

Asset Maintenance Manager

Cenviro Kualiti Alam Sdn Bhd
08.2017 - 10.2022
  • Managing mechanical & engineering task of total 11 sub division operation plant at Kualiti Alam Sdn Bhd.
  • Drove operational efficiency through data-driven decision-making processes, leveraging analytics tools for informed strategy development.
  • Reduced operational costs through comprehensive process improvement initiatives and resource management.
  • Achieved departmental goals by developing and executing strategic plans and performance metrics.
  • Optimized resource allocation by conducting regular performance evaluations and providing personalized coaching for staff development.

Projects

  • Introduce Pneumatic conveying system for fly ash to solicitation plant
  • Design & develop bulb crushing system
  • Design & develop air bag inflator destroyer system
  • Improve Leached Treatment Plant RO system
  • Head of technical team to review Cenviro Johor new incinerator facility
  • Member of 5year strategic planning team to manifest company future planning.

Senior Process Design Engineer

Carsten Ranico (M) Sdn Bhd
03.2010 - 08.2017
  • Calculate, Design (2D&3D) and analyzed the mechanical and thermal unit for the oil and gas waste management system.
  • Preparing logbook and log sheet, Maintenance log sheet and S.O.P for
  • orderly record of all routine operation and repairs.
  • Execute mechanical analysis through Inventor (3D) software.
  • Execute PV-Elit software for pressure vessels design.
  • Execute Computing Fluid Dynamic (CFD) simulation software
  • Execute Autodesk Navi work animation for presentation purpose.
  • Involved in technical resolution of design problems that may include

field investigation or inspection.

  • Developed new process and tools for continually improvement.
  • Lead project by preparing project costing, liaise with suppliers and third
  • parties, DOE & DOSH, prepare project management chart, and prepare
  • required technical drawings & documents and on-site sup

Projects

  • Coordinate oversea projects as Project Manager at Norway, Denmark and Holland
  • Coordinate co-processing ARM and AF project (LEO Project) incorporation between Kualiti Alam Sdn Bhd and Lafarge Sdn Bhd.

Plant Engineer

ACMV JanaKuasa Snd Bhd (SREP).
04.2009 - 03.2010

Monitoring entire plant operation from fuel handling system, burner,

  • Boilers, steam turbine and water treatment plant.
  • Preparing logbook and log sheet, Maintenance log sheet and S.O.P for

orderly record of all routine operation and repairs.

  • Involved in inspection and maintenance work of boiler and fittings
  • Join commissioning team and involved in data collection (parameters)
  • Able to control plant operation through DCS (Distribution Control System)
  • Involved in automation equipment installation job. 2D and 3D CAD

drawings.(Solidworks and Autocad)

  • Join development engineering team for material handling system alteration and modification and engineering drawing.
  • In charge person in data collection quality for CDM (Clean

Development Mechanism)

Education

Bachelor of Science - Manufacturing Process

Universiti Teknikal Melaka Malaysia (UTEM)
Melaka
04.2001 -

Skills

Project Management

Operations Management

Team Management

Business Development

Timeline

Project Manager

FLEXIL ENGINEERING SDH BHD
10.2022 - Current

Asset Maintenance Manager

Cenviro Kualiti Alam Sdn Bhd
08.2017 - 10.2022

Senior Process Design Engineer

Carsten Ranico (M) Sdn Bhd
03.2010 - 08.2017

Plant Engineer

ACMV JanaKuasa Snd Bhd (SREP).
04.2009 - 03.2010

Bachelor of Science - Manufacturing Process

Universiti Teknikal Melaka Malaysia (UTEM)
04.2001 -
S.Moganaganes MoganProject Manager