Work Preference
Summary
Overview
Work History
Education
Skills
Languages
Bachelor Final Year Project
Work Availability
Timeline
Generic
SIM KOCK LEE

SIM KOCK LEE

Staff Equipment Engineer
Kota Samarahan, Sarawak

Work Preference

Work Type

Full TimeContract Work

Location Preference

On-Site

Important To Me

Work-life balanceCareer advancementCompany CultureHealthcare benefitsStock Options / Equity / Profit SharingPaid sick leavePersonal development programs

Summary

Experienced Equipment Engineer with a strong background in the manufacturing industry. Specializes in equipment upgrades, efficiency enhancement, and resolving production issues for global companies. Skilled in overseeing equipment-based projects, developing and implementing equipment for safety, operations, and functionality. Collaborates effectively with cross-functional teams to ensure high-quality project delivery within tight deadlines. Committed to continuous learning and staying up-to-date with the latest advancements in mechanical engineering. Ready to leverage skills and expertise to contribute to the success of a dynamic organization in need of a talented mechanical engineer.

Overview

14
14
years of professional experience
4
4
years of post-secondary education

Work History

Staff Equipment Engineer

LONGI MALAYSIA SDN BHD
4 2016 - Current

Accomplishment:

Longi Wafer Plant, 2016-2020.

  • Successfully decommissioned 36 units of old DS271 Wire Saw machines within the tight schedule (3 weeks) set by management.
  • Successfully recommissioned long shutdown equipment, DW288+ Wire Saw, for production ramp up and maintaining yield at 95% in collaboration with various parties.
  • Created troubleshooting database for DW288+ to enhance troubleshooting competency of shift technician, thus reducing machine downtime.
  • Created work instruction and preventive maintenance checklist for new setup DW288+ Wire Saw machine.
  • Cost-saving improvement projects include modification of the wire break detection system to enhance detection sensitivity, minimizing severe wire break cases by 70%, and evaluating a qualified 2nd source pulley with 30% cheaper cost while maintaining the operating lifetime.
  • Lead the conversion project of DW288+ from low-flow mode to high-flow mode for yield improvement.
  • Coordinate with the vendor in solving problems during the conversion work to ensure no delay of the project, and the machine is released to production run with a 94% yield.

Longi Cell Plant, Jan 2020 - Present.

  • Pioneer team to set up new Longi Cell 3 plant in 2020, and Longi Kuching Cell 4 plant in 2022.
  • Meet target to complete machine move within 10 weeks, and full production line released within scheduled 4 months.
  • Main coordinator in Longi Kuching new Cell 3 Plant and Cell 4 plant machine unloading & uncrate activity with ZERO safety incident among Equipment team as well as contractors.
  • Participate in project to make Longi Kuching Cell 4 plant the most advanced with fully automated manufacturing production via implementing Autonomous Guided Vehicle system.
  • Lead team to increase printing machine productivity by 5%, through optimizing machine parameters, which improve cycle time from 0.9s to 0.85s, without compromising quality.

Equipment Engineer

SUNEDISON KUCHING SDN BHD
10.2010 - 04.2016

Accomplishment:

  • Involved in the start-up phase of the newly constructed manufacturing company, MEMC Kuching Sdn Bhd, in 2010 and contributed to producing the company's first product (solar wafer) in January 2011.
  • Completed 44-unit DS271 Wire Saw machine setup within schedule and with minimal supervision in 2011.
  • Successfully developed the Condition Based Maintenance in vibration analysis using Viber X5 MK III to monitor machine healthiness in 2014.
  • Upgraded maintenance practice from preventive maintenance to predictive maintenance.
  • Involved in the evaluation phase of the new generation equipment DW288+ Wire Saw, as well as tool setup in 2015.

Education

Bachelor of Engineering (Mechanical) - Mechanical

Universiti Teknologi Malaysia(UTM)
Johor
05.2006 - 09.2010

Higher Secondary/Pre-U/"A" Level - undefined

Labuan Matriculation College

Skills

SpectraPro (Vibration Analysis)

Languages

Bahasa Malaysia
Proficient
C2
English
Advanced
C1
Mandarin
Proficient
C2

Bachelor Final Year Project

Develop a diagnostic defect test rig in vibration monitoring which is capable in simulating common machinery faults which includes shaft misalignment, mechanical looseness, bearing fault, rotor unbalance and belt drive problem.

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Equipment Engineer

SUNEDISON KUCHING SDN BHD
10.2010 - 04.2016

Bachelor of Engineering (Mechanical) - Mechanical

Universiti Teknologi Malaysia(UTM)
05.2006 - 09.2010

Staff Equipment Engineer

LONGI MALAYSIA SDN BHD
4 2016 - Current

Higher Secondary/Pre-U/"A" Level - undefined

Labuan Matriculation College
SIM KOCK LEEStaff Equipment Engineer