Summary
Overview
Work History
Skills
Timeline
Generic
Siew Tiong Sia

Siew Tiong Sia

Site Senior Supervisor
Pasir Gudang,malaysia

Summary

Safety Officer is responsible for safety and security of the company and its employees. This includes managing the planning and execution of all safety related activities. This includes performing risk assessments, developing policies, procedures, and procedures for the company, and providing information to the appropriate function.

Overview

32
32
years of professional experience
1
1
Language

Work History

Computer Safe & Office System (senior Supervisor)

Kim Leng Pte Ltd
04.2004 - Current
  • Installed office furniture, safe box reconfiguration tasks and functions related to furniture systems.
  • Loaded furniture orders on trucks and helped transport products to the customer in a timely manner.
  • Communicated with customers' regarding project status to assure customer satisfaction.
  • Prepared documentation, drawing, and project needs the night before an install to make sure customers' installation was assembled perfectly.
  • Inspected furniture for any kind of defects for proper operability according to manufacturer's guidelines.
  • Maintained a professional appearance in accordance with the operations policies and procedures.
  • Supposed to work for one month, and with hard work was able to work full time.

Interior and Metal Worker

Belcraft Wrought Iron Pte Ltd
04.1998 - 03.2004
  • Operated hand and power tools and heavy machinery safely.
  • Tended cutoff saws, presses and forming machines.
  • Coordinated and assembled ducts, hoods and other sheet metal products.
  • Painted and applied protective coatings to various parts.
  • Drilled and punched holes in metal for screws, bolts and rivets quickly and efficiently.
  • Coordinated tasks and determined correct amount of material required to complete assignments.
  • Constructed both one-off and mass-produced items with skilled finishing work such as engravings and embossings.
  • Maneuvered, installed and anchored completed units into proper positions.

Partition and Ceiling Interior (Supervisor)

Urban Design House Pte Ltd
01.1992 - 03.1998
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Maintained relationships with local suppliers for cost-effective materials.
  • Smoothed and leveled new concrete or other materials.
  • Provided excellent customer service and answered questions related to project timelines and costs.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Observed safety regulations on job sites to minimize accidents.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Assembled and disassembled scaffolding and ladders to guarantee safety of workers while performing tasks at heights.
  • Installed drywall, flooring and other interior finishes to create finished and functional living and work spaces.
  • Conducted daily site inspections to identify potential safety hazards.
  • Worked with contractors and other tradespeople to meet project specifications and deadlines.
  • Followed blueprints and diagrams to complete projects according to specifications.
  • Assisted in constructing roads, bridges and other infrastructure projects to respond to economic, fiscal and environmental changes.
  • Dug trenches and set up forms to specified requirements for concrete pours.
  • Assisted with post-construction cleanup and maintenance.
  • Loaded and carried materials to facilitate transport at construction sites.
  • Trained and supervised team of construction workers.
  • Followed industry regulations and local building codes.
  • Utilized equipment to break old forms and structures.
  • Monitored project budgets and expenses.
  • Conducted quality control of materials used in construction.
  • Prepared and applied construction materials to build structures or fill gaps.
  • Coordinated with architects and designers to support satisfactory end products.
  • Built custom homes to develop local areas.
  • Developed successful system for tracking project progress.
  • Developed system for tracking job costs and project profitability.
  • Developed safe and efficient workflows for construction projects.
  • Coordinated with subcontractors and other stakeholders to complete projects on time.
  • Inspected completed projects to meet customer expectations.
  • Supervised installation of electrical and plumbing systems.

Skills

Supervisor, customer service experience, safety training, safety audits,safety meetings, warehouse

undefined

Timeline

Computer Safe & Office System (senior Supervisor)

Kim Leng Pte Ltd
04.2004 - Current

Interior and Metal Worker

Belcraft Wrought Iron Pte Ltd
04.1998 - 03.2004

Partition and Ceiling Interior (Supervisor)

Urban Design House Pte Ltd
01.1992 - 03.1998
Siew Tiong SiaSite Senior Supervisor