SI KOK LEONG

SI KOK LEONG

Kuching

Overview

19
19
years of professional experience
6
6
years of post-secondary education
3
3
Languages

Work History

Project Engineer

BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
11.2024 - Current
  • Daif Sabah (2021)- Pembinaan Sekolah Gantian Penuh di Sk Buit Hill Penampang (Reka & Bina)
  • My Main task is to all ensure all precast material that delivery to site is according with the shop drawing and all the precast components are install accordingly

Project Manager

BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
11.2020 - 11.2024
  • Cadangan Pembinaan Kompleks Agensi Penguatkuasaan Maritim Malaysia (APMM) Daerah Miri, Sarawak (Reka & Bina)
  • The project consists of 7 storey Quarters building (Class D&F), 3 storey Admin block, Marine works, Surau and few ancillary buildings
  • My main task in this project is to coordination among consultant on the issue arise during construction
  • Beside that I also need to ensure that quality and progress of the project are well maintained as per work program

Project Engineer

Pembinaan TK Maju
06.2019 - 11.2020
  • Cadangan Pembinaan Pusat Pembangunan Dan Pengembangan Industri LADA Negara Di Semenggok, Kuching, Sarawak
  • My main task include inspection for both structural and architectural works, highlight discrepancy between architectural, structural and M&E
  • Preparing monthly progress report and QAQC report is also part of my task

Site Engineer

BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
07.2017 - 05.2019
  • Proposed Development of Masjid Bandar Kuching on Sarawak River, section 24, Kuching Town Land Distict at Jalan Gambier, Kuching Sarawak is the second project the I involved in
  • My mainly responsible in all structure works, including all inspection with consultant, highlight discrepancy between structural, M&E architectural and also quality control of material and sub-contractor workmanship

Site Engineer

BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
12.2014 - 07.2017
  • I am a site engineer at a 6-storey hotel complex at Kuching
  • My main task in this project is on the structure works and architectural works for the hotel
  • Besides that, I also need to monitor the progress of the overall hotel construction

Site Engineer

KELLER (M) SDN. BHD.
04.2014 - 12.2014
  • The location of this project is at MuaraTebas land district
  • Keller(M) Sdn
  • Bhd is the main contractor for the ground improvement works of the 48500 m2
  • The stone column is one of the ground improvement method is first time being implement in Sarawak
  • The client of the project is Brooke Dockyard & Engineering Works Corporation
  • My main task on the quality control side, for instance all the stone that used for the stone column must be in the range of 25mm – 37.5mm and many others
  • Besides that, I also need to submit the daily report and weekly report to my superior

Site supervisor

ALU THAI METALS CO. LTD.
09.2013 - 01.2014
  • The project is located at Bangkok, Thailand
  • My scope of work is supervising the extension work for the warehouse

Site supervisor

ALU NORTH METALS SDN. BHD.
01.2013 - 08.2013
  • The project is location at Pasir Puteh, Simunjan District
  • This project is constructing Biogas Plant and Waste Water Treatment Plant for the Livestock Framing Area (LFA) in Kuching
  • The company that I am working with is the sub-contractor in installation of Anaerobic Digestion & Equalization Tank Wall Insulation Cladding
  • My scope of work for this project including supervising workers in installing the insulation (rock wool) and wall cladding
  • Besides that I need to submit the Permit to Work to the main contractor and the safety officer in every week
  • Moreover the safety tool box meeting will also be held twice a week so that all the workers know how to use all the safety equipment and what are the safety procedure that they should follow when they are working in 14m height from the ground

Trainee

CHIUSTON TIMBER SDN. BHD.
02.2012 - 04.2012
  • I was placed at the Kanowit Road construction site in Sibu, Sarawak
  • The site is constructing and completing a two-lane single carriageway acess road leading to Sungai poi
  • During my training period, the task that being assignment to me including the supervision of the pilling work and structural work for the 3m x3m RC box culvert
  • Besides that, I also have the opportunity to witness the earth works include cut and fill, removal of unsuitable material installation of the settlement marker for the surcharges load

Trainee

HASHIM& NEH (SARAWAK) SDN. BHD.
01.2006 - 03.2006
  • During my industrial training, I am working with the consultant firm
  • I am being placed at site on development of Police Marine Base at muara tebas kuching
  • During my training, I being exposed on Pre-fabricated vertical drain (PVD), pilling work for the 9 storey building, concreting and bakau piling for retaining wall, and sand back filling for the site

Education

Bachelor of Civil Engineering (Hons.) -

University TenagaNasional
06.2009 - 11.2012
GPA: CGPA 3.64

Diploma in Civil Engineering - undefined

Institute Eksekutif, Kuching
06.2006 - 04.2009
GPA: CGPA 3.78

Sijil Pelajaran Malaysia (SPM) - undefined

S. M. K. Sungai Tapang
GPA: 5A’s, 4B’s and 1C

Skills

I am a hardworking and well time management person, any tasks that is assigned to me I will be able to complete it on time and with quality work Besides that, I will be able to work in a team I can play my role as a team member very well and always give my full support to all my team members when they need my helps or assistants

undefined

Coursework

  • Roof Truss Installer (Steel)- Level 1
  • Traffic Management Officer

Educational Attainments

  • University Tenaga Nasional, Bachelor of Civil Engineering (Hons.) with CGPA 3.64, 11/2012
  • Institute Eksekutif, Kuching, Diploma in Civil Engineering with result CGPA 3.78, 04/2009
  • S. M. K. Sungai Tapang, Sijil Pelajaran Malaysia (SPM) with 5A’s, 4B’s and 1C., 2005

Identity Card No

880404-52-5443

Personal Information

  • Age: 38
  • Date of Birth: 04/04/88
  • Gender: Male
  • Nationality: Malaysian
  • Marital Status: Married

Timeline

Project Engineer - BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
11.2024 - Current
Project Manager - BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
11.2020 - 11.2024
Project Engineer - Pembinaan TK Maju
06.2019 - 11.2020
Site Engineer - BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
07.2017 - 05.2019
Site Engineer - BANGKIT ENEGRY & PRO LOGISTIC (EM) SDN BHD
12.2014 - 07.2017
Site Engineer - KELLER (M) SDN. BHD.
04.2014 - 12.2014
Site supervisor - ALU THAI METALS CO. LTD.
09.2013 - 01.2014
Site supervisor - ALU NORTH METALS SDN. BHD.
01.2013 - 08.2013
Trainee - CHIUSTON TIMBER SDN. BHD.
02.2012 - 04.2012
University TenagaNasional - Bachelor of Civil Engineering (Hons.),
06.2009 - 11.2012
Institute Eksekutif, Kuching - Diploma in Civil Engineering,
06.2006 - 04.2009
Trainee - HASHIM& NEH (SARAWAK) SDN. BHD.
01.2006 - 03.2006
S. M. K. Sungai Tapang - Sijil Pelajaran Malaysia (SPM),
SI KOK LEONG