Summary
Overview
Work History
Education
Skills
Timeline
Generic
Shanthamaria A/P Selvanazan Selvanazan

Shanthamaria A/P Selvanazan Selvanazan

SITE SAFETY SUPERVISOR

Summary

Since 2 years i was experienced as a Site Safety Supervisor and EHS Supervisor to inspect, investigate rectify any unsafe acts, accidents and conflicts at the workplace Practice and promote a safe workplace to all site team and contractors. Prepare and review all documentations related to safety & health and adheres to deadlines and report to SHO or related safety management. Organize work plan, coordinating with Construction Manager, for volunteer crews prior to their build day on site. Monitors all sub-contractors and required inspections. Maintain site working at height activities and confine space. As EHS Supervisor role i am supervision on awareness training of employee on the health ,safety and environmental issues. This organize training to develop awareness on materials and communicate company policies and SOP also DOSH safety and regulation in terms of EHS Supervisor Cum Site Safety Supervisor

Overview

1
1
year of professional experience
3
3
Languages

Work History

SITE SAFETY SUPERVISOR

, PUB- JOHOR RIVER WATER TREATMENT PLANT(HONGANG ENGINEERING) KOTA TINGGI JOHOR
03.2025 - 06.2025
  • -Ensure to lead and monitoring safety work ,reporting to project manager of job progress and safety issues to SHO also to DOSH department
  • -To supervise daily site inspection, observation ,site coordinating and communication between management and contractor .
  • -Updating and reporting job progress . .To ensure all control measures required in the risk assessment and permits are implemented on site. -To implement safety regulations and ensuring compliance with general health and government safety legislation
  • -Maintain and monitoring on SAFETY SOP Standard - - Documents and Inspection, incident records on Electrical and Mechanical maintenance activity by employer
  • - Risk Assessment ,Safety work procedure, organization chart , plant rescue plan ,emergency rescue plan was implementation by my role as supervision conducted in safety in plant .
  • -Conduct tool box meetings and regular inspection of company’s machinery, equipment and power tools, Electrical panels, electrical maintenance installation activities .
  • Well-experience in handling inspection and monitoring safety measures on water treatment machinery process and safety standard to ensure a reliable and efficient system.
  • -Ensure all electrical maintenance work are being executed ,replacement and handed manual installation by workers safely. and it refers to systems used by HONGAN ENGINEERING in semiconductor system according to the company spec.
  • -Ensure to lead and monitoring safety work ,reporting to project manager of job progress and safety issues to SHO also to DOSH department
  • -To supervise daily site inspection, observation ,site coordinating and communication between management and contractor ,updating and reporting job progress . .To ensure all control measures required in the risk assessment and permits are implemented on site. -To implement safety regulations and ensuring compliance with general health and government safety legislation -Maintain monitor SAFETY documents and Inspection, incident records on Electrical and Mechanical maintenance activity by employer - Risk Assessment ,Safety work procedure, organization chart , plant rescue plan ,emergency rescue plan was implementation by my role as supervision conducted in safety in plant . Conduct tool box meetings and regular inspection of company’s machineries, equipment and power tools, Electrical panels, electrical maintenance installation activities .
  • Well-experience in handling inspection and monitoring safety measures on water treatment machinery process and safety standard to ensure a reliable and efficient system.
  • -Ensure all electrical maintenance work are being executed ,replacement and handed manual installation by workers safely. and it refers to systems used by HONGAN ENGINEERING in semiconductor system according to the company spec. These systems include heavy machinery transport that travels for necessary high risk job on to access equipment directly, optimizing the flow in water plant area operations by FMA ACT139 under BOWEC 1986.
  • -Conduct Safety Awareness indoor training weekly/monthly presentation session to the workers to refresh their tasks according job scopes. -Monitor workers work in safe environment when handling electrical maintenance installation , components maintenance and replacement spare parts equipment .
  • -Ensure no workers to stand under suspended load during reposition activity.
  • -Ensure check all tools and equipment to using in good condition and follow safety low to enter work area to prevent falling object in hazardous energy area.
  • -Ensure toolbox meeting session conducted and brief before start the work to the workers everyday.
  • . Obtain Risk Assessment according MOS(method of statement)
  • . Obtain Permit To Work
  • . Obtain Confine Space Work Permit/ Documentation
  • . Obtain Work At Height Permit
  • . Obtain Hot work Permit To Work
  • . Obtain Lifting Permit To Work
  • . Related safety documentation procedure / Approval related Sources
  • . Inspection checklist by daily, weekly, monthly( materials, tools equipment, machinery, electrical & mechanical tools equipment - Site /plant inspection
  • . Safety MONTHLY summary report record will submission to management
  • All related safety documentation under DOSH REGULATION in FMA ACT139 under BOWEC 1986.
  • -Conduct Safety Awareness indoor training weekly/monthly presentation session to the workers to refresh their tasks according job scopes. -Monitor workers work in safe environment when handling electrical maintenance installation , components maintenance and replacement spare parts equipment .
  • -Ensure no workers to stand under suspended load during reposition activity.
  • -Ensure check all tools and equipment to using in good condition and follow safety low to enter work area to prevent falling object in hazardous energy area.
  • -Ensure toolbox meeting session conducted and brief before start the work to the workers everyday.
  • . Obtain Risk Assessment according MOS(method of statement)
  • . Obtain Permit To Work
  • . Obtain Confine Space Work Permit/ Documentation
  • . Obtain Work At Height Permit
  • . Obtain Hot work Permit To Work
  • . Obtain Lifting Permit To Work
  • . Related safety documentation procedure / Approval related Sources
  • . Inspection checklist by daily, weekly, monthly( materials, tools equipment, machinery, electrical & mechanical tools equipment - Site /plant inspection
  • . Safety MONTHLY summary report record will submission to management

SITE SAFETY SUPERVISOR

BONDIC MNC ( OIL&GAS), PETRONAS PENGERANG JOHOR
12.2024 - 03.2025
  • To implement safety regulations and ensuring compliance with general health and government safety legislation on order to avoid unpleasant PETRONAS PROJECT in Pengerang Construction/Plant site. Maintain monitor SAFETY documents and records. Risk Assessment ,Safety work procedure, organization chart , plant rescue plan ,emergency rescue plan was implementation by my role as supervision conducted in safety in plant . Conduct tool box meetings and regular inspection of company’s machinery, equipment and power tools.
  • Well-experienced in handling Underground Pipping Installation Project and planning, execution adherence to safety standard to ensure a reliable and efficient system.
  • -Ensure the pipes are being stored ,transported and handed installation by workers safely. and it refers to systems used by this Bondit in semiconductor system according to the company spec.
  • To implement safety regulations and ensuring compliance with general health and government safety legislation on order to avoid unpleasant PETRONAS PROJECT in Pengerang Construction/Plant site. Maintain monitor SAFETY documents and records. Risk Assessment ,Safety work procedure, organization chart , plant rescue plan ,emergency rescue plan was implementation by my role as supervision conducted in safety in plant . Conduct tool box meetings and regular inspection of company’s machinery, equipment and power tools.
  • Well-experienced in handling Pipping Installation Project and planning, execution adherence to safety standard to ensure a reliable and efficient system.
  • -Ensure the pipes are being stored ,transported and handed installation by workers safely. and it refers to systems used by this Bondit in semiconductor system according to the company spec. These systems include heavy machinery transport that travels on to access equipment directly, optimizing the flow in operations by FMA ACT139 under BOWEC 1986.
  • - Conduct Safety Awareness indoor training weekly/monthly presentation Session refresh to the workers -Monitor workers safety when handling piping installation , maintenance and replacement spare parts equipment and work area in safety measures.
  • -Ensure no workers to stand under suspended load during reposition activity.
  • -Ensure check all tools and equipment to using in good condition and follow safety low to enter beyond the barricade area to prevent falling object hazard.
  • -Ensure toolbox meeting session conducted and brief before start the work to the workers .
  • -.Ensure to lead and monitoring safety work ,reporting to project manager of job progress and safety issues to SHO also to the DOSH department. To supervise daily site inspection, observation ,site coordinating and communication between management and contractor ,updating and reporting job progress .To ensure all control measures required in the risk assessment and permits are implemented on site.
  • .Obtain Risk Assessment according MOS(method of statement)
  • . Obtain Permit To Work
  • . Obtain Excavation Work Permit
  • . Obtain Confine Space Work Permit/ Documentation
  • . Obtain Work At Height Permit
  • . Obtain Hot work Permit To Work
  • . Obtain Lifting Permit To Work
  • . Related safety documentation Implement
  • . Inspection checklist by daily, weekly, monthly( materials, tools equipment, machinery, and for the site /plant inspection
  • . Safety MONTHLY summary report record will submission to management
  • By FMA ACT139 under BOWEC 1986.
  • - Conduct Safety Awareness indoor training weekly/monthly presentation Session refresh to the workers -Monitor workers safety when handling piping installation , maintenance and replacement spare parts equipment and work area in safety measures.
  • -Ensure no workers to stand under suspended load during reposition activity.
  • -Ensure check all tools and equipment to using in good condition and follow safety low to enter beyond the barricade area to prevent falling object hazard.
  • -Ensure toolbox meeting session conducted and brief before start the work to the workers .
  • -.Ensure to lead and monitoring safety work ,reporting to project manager of job progress and safety issues to SHO also to DOSH department. To supervise daily site inspection, observation ,site coordinating and communication between management and contractor ,updating and reporting job progress .To ensure all control measures required in the risk assessment and permits are implemented on site.
  • .Obtain Risk Assessment according MOS(method of statement)
  • . Obtain Permit To Work
  • . Obtain Confine Space Work Permit/ Documentation
  • . Obtain Work At Height Permit
  • . Obtain Hot work Permit To Work
  • . Obtain Lifting Permit To Work
  • . Related safety documentation Implement
  • . Inspection checklist by daily, weekly, monthly( materials, tools equipment, machinery, and for the site /plant inspection
  • . Safety MONTHLY summary report record will submission to management

EHS SUPERVISOR

Intel Pelican ( MURATEC) PG12 (EXYTE), Pulau Pinang
07.2024 - 12.2024
  • -To implement safety regulations and ensuring compliance with general health and government safety legislation on order to avoid unpleasant at Intel Pelican Construction site
  • - Maintain and monitor EHS documents and records.
  • -Conduct regular inspection of company’s machinery, equipment and power tools.
  • Well-experienced in handling EHS as per Clean Room & Ultra Clean room Protocol for AMHS Installation Project.
  • -“AMHS” stands for Automated Material Handling System, and it refers to systems used by Muratec in semiconductor fabrication.
  • These systems include automated transport that travels on an overhead track to access equipment directly, optimizing the flow in cleanroom operations.
  • - Conduct training EHS personnel training Awareness.
  • Monitor workers when handling Material lifter to lifting the railing to up the walkable ceiling.
  • -Ensure EHS check that F-Claim or Lashing belt is secured with rail before lifting up to walkable ceiling. check working area before installing Stocker and inspect chain block to prevent from falling object. Ensure provide competent rigger to secure Electrical Panel with shackle and sling belt.
  • -Ensure no workers to stand under suspended load during reposition activity.
  • -Ensure check spotter to monitor un- authorized person to enter beyond the barricade area to prevent falling object hazard.
  • -Ensure SPA conducted and brief to workers.
  • - Have been conducted 100000 Safe Man Man hour celebration without L.T.I and World Osh Day of 2024

Education

SPM -

SMKK KULIM KEDAH DARUL AMAN
Kulim, Kedah
01.2005

Skills

  • Problem-solving
undefined

Timeline

SITE SAFETY SUPERVISOR

, PUB- JOHOR RIVER WATER TREATMENT PLANT(HONGANG ENGINEERING) KOTA TINGGI JOHOR
03.2025 - 06.2025

SITE SAFETY SUPERVISOR

BONDIC MNC ( OIL&GAS), PETRONAS PENGERANG JOHOR
12.2024 - 03.2025

EHS SUPERVISOR

Intel Pelican ( MURATEC) PG12 (EXYTE), Pulau Pinang
07.2024 - 12.2024

SPM -

SMKK KULIM KEDAH DARUL AMAN
Shanthamaria A/P Selvanazan SelvanazanSITE SAFETY SUPERVISOR