Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Languages
Timeline
Generic
Rudy Lee

Rudy Lee

Gelugor, Penang

Summary

Focused Ops Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance. Leading new product introduction (NPI) cross-functional teams through the Product Development Process (PDP) in support of new product development and transition into full production. This includes developing program goals that supports the business and functional objectives by formulating strategies and execution plan to meet those goals. Responsibilities include setting and fulfilling definitive requirements, priorities, and deliverables by interfacing with internal resources (Test Development, Process Engineering, Equipment, Materials and Operations) and geographically dispersed Product Development sites.

Overview

25
25
years of professional experience
1
1
Certification
12
12
years of post-secondary education

Work History

Ops Project Manager III

Jabil
Gelugor, Penang
03.2020 - Current

• Drive and steer qualification activities within a project from initial qualification through to issue within the NPI department. Provide analytical leadership, a level of Manufacturing, Project Management, Test and Quality knowledge to all aspects of product analytics.

• Support the building and leading of an effective, high performing cross-functional team

• Interface between Engineering, Manufacturing, Site Procurement, Suppliers, Customers and other key functional groups to develop, generate, and execute program plans to transition products.

• Work with ORT, Test, Planning and Production Team to establish customer priorities to meet customer approval for products under EVT, DVT and PPAP build and meet Production needs while keeping an effective daily Operations.

• Initiate regular Team meetings, establishing action items and due dates for activities of Engineering, Manufacturing, Procurement, Supply Chain, Planning and Quality.

• Facilitate early involvement of commodity Procurement executives for all NPI materials for EVT build.

• Define core data files required for PCBA and Box Build level NPI processes (SMT, SPI, FAI, Reflow, AOI, Manual Assembly, Wave Soldering, 5DX, ICT, On-Board Program, Functional Test, Potting, Conformal Coating, Box build) coordinate information exchange between customer and Jabil site.

• Advise customer on product data requirements on NPI, EVT, DVT, PPAP build.

• Develop qualification processes to determine site capabilities identify gaps (PFMEA, FMEA, Target Yield, Quality Objective) vs. requirements for specific NPI projects (E,g. NPI, Engineering Build, Pilot, PPAP).

• Establish timeline and goals specific to each project.

• Develop clear and measurable goals and objectives by which to quantify, track and report project status.

• Manage project effectively without having direct accountability for production personnel leverage site level operations resources.

• Interact with Program Manager and Operation Team to close gaps vs. established goals or milestones.

• Support portfolio management of the initiatives governed by the Product Review Meeting.

• Interact with site operations and global support groups as necessary to resolve issues/problems on projects and tasks.

• Lead and manage cross-functional teams to execute the site NPI process within the operations group.

• Set an overall Operational NPI plan, Set Ops KPI’s, track and follow NPI project progress, manage risk and report accordingly.

• Define the NPI methodologies, interfaces, and process within the operation matrix to ensure smooth product introduction

• Providing engineering leadership for the definition and scoping of NPI projects for all aspects of manufacturing and transitioning of projects to Manufacturing for project implementation and subsequent operation.

• Ensure Design for Manufacturing guidelines are well implemented in the product design and validate implementation impact on product quality

• Overall accountability of NPI data integrity including: BOM, NPI documentation, jigs and tooling, product regulation.

• Coordinate concept though final approval process of the creation of photo samples, label artwork, carton artwork, user manual and other product literature.

• Establishing and documenting NPI process specifications that ensure manufacturing operations will meet product capability and quality expectations.

• Analyze and recommend improvements to all production processes and methods to facilitate cost reduction and quality improvement through engineering change request.

• Establish readiness build plans for all NPI projects and coordinate with all stakeholders to ensure a good quality product – represent the operations in the product life cycles gates.

• Spearhead Wabtec Locomotive Electronics Module, Collins Aerospace, Keysight NAS and Advantest Verigy 93000 EXA Scale SOC Test System Project

• Performed task central to project progress, project schedule, risk management, project execution and project closure

• Collaborate with customer (internal or external) from requirements gathering through product acceptance / approval

• Align the project team to customer needs by establishing milestone, goals, and objectives based on input from all functional areas and stakeholders within the project

• Review project schedules with Business Unit on Project allocations (Materials, Resources, Test, Equipment, Tooling, Facilities)

• Provide guidance and motivation to stakeholders to successfully achieve project goal and corporate initiatives

• Serve as interface with customers, vendors, stakeholders and project sponsor(s)

• Manage development of project plans with focus on achievement of project goals and corporate initiatives, including project specific Key Performance Indicators (KPI’s) or metrics

• Responsible for recognizing project's Key Performance Indicators (KPI) and manage the work within scope, quality, time and cost constraints

• Coordinate the efforts of the team to develop an integrated project plan and risk analysis with action plans to mitigate the risks

• Management of resource capacity and time tracking allocated to the project

• Report project status, issues and implemented solutions as well as evaluations and assessments of the results

• Provide leaders with updates, including greatest opportunities for improvement

• Recognize potential problem areas against the plan and identify and implement alternative solutions

• Identify best cost solutions to reduce cost by streamlining processes and systems (i.e., modification of responsibilities or consolidation of tasks, elimination of non-value added processes, or complete re-engineering of processes and systems)

• Provide key stakeholders with regular project performance status, variances to plan, and identification of corrective actions (if required)

• Drive continuous improvement through trend reporting analysis and metrics management

• Demonstrate a commitment to customer service; anticipate, meet and exceed expectations by solving problems quickly and effectively, making customer issues a priority

• Drive relevant, concise and effective communication through a variety of mediums

• Comply and follow all procedures within the company security policy

• Consistently met deadline with the Team in achieving commendations for 5 consecutive months

Manufacturing Section Head

IQ Group Holdings Berhad
06.2013 - 02.2020

• Steer and direct PCBA and HLA manufacturing operations that generate $1M in annual revenue. Establish operational policies and implement process improvements to ensure superior quality and outstanding output of custom molded and extruded parts


• Directly manage 10 non-exempt employees. Design and implement coaching and training programs to develop staff, facilitate efficiency, and improve performance. Manage operational and capital expense budgets exceeding $3M. Ensure adherence to strict quality control procedures


• Drive and lead manufacturing processes from inception phase to complete phase with process qualification (SMT, PTH Manual Insertion, Wave Soldering, PTH Robotic Soldering, ICT Test, Functional Test, Semi-Automated Feed Torque Driver, Semi-Automated Glue Dispensing, Semi-Automated Heat-stick, Final Test)


• Preparation of manufacturing process documentation (Process Flow, Control Plan, Work Instruction, FMEA)


• Managing daily manufacturing activities include (establish product startup, New Product Introduction (NPI) readiness, manufacturing KPI, existing Manufacturing Continuous Improvements, LEAN Manufacturing, First Pass Yield (FPY), Productivity, Product Quality, 8D, Cost, 5S, Balance Scorecard, OTD and Resources Planning)


• Oversees the execution of manufacturing schedules and assures the overall planned manufacturing schedules to meet management goal and customer requirements


• Perform “Gemba Walk“ and participate daily manufacturing operation through personal interaction with manufacturing associates, response to immediate issues and regular counsel Supervisors, Engineers and Technicians


• Provides feedback and solutions to other department such as Procurement, R&D, Engineering, Quality Control, Supplier Quality Assurance pertaining to issue occurrence during observation from manufacturing operations


• Issue “Manufacturing Quality” feedback to respective department in charge if found parts discrepancy and with written 8D report advise


• Preparation of manufacturing setup cost (CAPEX) estimation for new and existing product, manufacturing activities effort tracking, customer co-ordination, test reporting


• Lead the development, installation, debug qualification and hands-on troubleshooting existing and new assembly equipment such as autofeed torque drivers, thermal adhesive dispensers, thermal heat-stick dispenser


• Define manufacturing activities, minimize factory overhead cost, and maximize capacity throughput via DMAIC methodologies


• Development activities test specification analysis, evaluate and validate test system design, mechanical test jigs and fixtures design


• Leading a Team of 10 indirect Engineering and Technical Personnel in day-to-day operation and manufacturing support of mechanical jigs and fixtures fabrication of test control apparatus and equipment


• People management, hiring, coach and establish Manufacturing Team that meets agreed objectives (KPI) which delivers optimum practice results by continuous training need analysis, value added services, and continuous improvements


• Oversees the development and implementation of manufacturing processes to maintain proper product functionality as well as cost efficiency


• Manage and audit PCBA repair area components disposition for every 6 months to ensure obsolete components “Not Use“ are dispose off the shelves


• Co-ordination project transfer to counterpart and establish a new setup and installation


• Determine project milestones are met and adhering to approved budget


• Committee member of ISO14001 environmental impact aspect (EIA) reviewer

Test Design Engineer II

Plexus Corp, Electronics Manufacturing Services
Bayan Lepas, Penang
05.2010 - 05.2013

• Develop and implement PCBA level Functional Test, High Level Assembly (HLA), Environmental Stress Screening (ESS) test solutions to meet and fulfilled global and regional (APAC) customer’s requirement

• Development activities include test requirements specification (TRS), control matrix, test system design, test algorithm, test software development, and rack mount mechanical jigs and fixtures design

• Implementation activities include test system integration, test software coding, source code debugging, test system build support, start-up installation, user acceptance training, and intra-site manufacturing test support

• Develop and compile user maintenance procedure, tester schematic diagram for existing and new product launch to ease manufacturing intra-site troubleshooting and maintenance purposes

• Develop and compile existing and new tester parts list to identify future parts sourcing activities due to tester duplication and breakdown

• Test performance characterization includes test coverage, on-board programming, calibration functions, automation, repeatability, reliability, safety, ergonomics, and supportability

• Work with Project Manager to review project schedule weekly from customers request of the readiness tester hardware duplication, product specification, product firmware, test procedure, test hardware consignment (customized interface module), test equipment

• Tested and analyzed equipment design and performance feasibility to determine potential ROI.

• Conducted technical evaluations of engineering designs and test results.

• Implemented automated systems to improve accuracy and efficiency of engineering processes.

• Involved in Design Assurance to ensure product compliance with RoHS, REACH, IPC Standards 1752-2, 610 Rev F

Senior Test Development Engineer II

Kontron Asia Pacific Design Sdn. Bhd.
Perai, Penang
04.2002 - 04.2010

• Created comprehensive test plans, test scripts, and use cases to support testing objectives.

• Tracked test reports and failures determined by root cause data trends.

• Reviewed, evaluated, and identified requirements for testability.

• Developed and maintained test and evaluation strategies for testing to show operational readiness and suitability with planned project decision points.

• Tested hardware and software within sandbox environment prior to release to production.

• Researched new developments in testing methods and equipment and made recommendations to improve testing procedures.

• Authored code fixes and enhancements for inclusion in future code releases and patches

• Corrected, modified and upgraded software to improve performance.

• Develop manufacturing test solutions for existing and new product introduction (PCBA & Box Build)

• Develop test methods which include innovative test fixture design to simulate the proving ground environment in the lab using physical test

• Communicate and work with diverse and cross-cultural organizational team environment (Design, Validation, NPI, QA, and Manufacturing) to ensure product quality, test yield, cost and manufacturability are fulfilled

• Managed and released of device firmware according to Engineering Change Notification (ECN) from customer

• Develop customize mechanical test jigs and fixtures to cater and support varieties of PCBA and Box Build test methodologies

• Provide jigs and fixtures operation training to Maintenance Technicians once new tester has been released to manufacturing

Manufacturing Test Engineer I

Siemens VDO Automotive AG
Perai, Penang
05.2000 - 04.2002

• Perform Total Preventive Maintenance (TPM), and Predictive Maintenance to upkeep test equipment, mechanical test fixtures and jigs in optimum condition

• Perform Measurement System Analysis (MSA) to validate sample data analysis of the robustness test equipment with respect to the test system

• To determine the Mean Time Between Failure (MTBF) rate for the respective test equipment, and overall equipment efficiency (OEE)

• To perform system self-test on test equipment with known good sample to validate the individual section and sub-section test system hardware failure which contribute either from test equipment or device under test (DUT)

• To perform In-Circuit test system device learning and boundary scan with respect to known good sample to validate test system stability and eliminate intermittent issues

• Troubleshoot In-Circuit tester Teradyne (Genrad 228x) found intermittent failure due to relay cards

• Perform In-Circuit test program learning via boundary scan to identify the device characteristics

• Perform functional test using NI LABView test program to determine the device characteristics on ±30° slope on a semi-automated test fixtures to ensure DUT meeting the specification limits

• To perform system self-test on test equipment to identify the section and sub-section hardware failure which contribute either from test equipment or device under test

• Perform final functional test to identify the ECU checksum of the device with respect to required value

• To identify FIFO method responsible for spare parts inventory management for all test equipment in sufficient stock level to prevent downtime

• Hands on the operation of various tester from Genrad 228x In-circuit Test, Accelerometer Functional Tester, Burn-In Tester, Leakage Functional Test, customized tester

Test Engineering Technician II

Unico Technology Berhad
Perai, Penang
04.1998 - 04.2000

• Assign to reduce the computer main board failure rate from the production fallouts in order to achieve production target (KPI) and ontime delivery (OTD)

• Perform failure analysis on the rejected PCBA to identify the root causes either due to open or short circuitry induce by SMD component level, plating through hole component, process, incoming quality

• Well verse in product schematic, PCB layout, gerber files, wiring diagrams and product diagnostic tools

• Use of fabmaster diagram and Q-stat to identify component location

• Hands on experience in replacing PCB burnt copper track caused by either open or short circuitry with appropriate soldering and desoldering tools

• Identify key rejects either due to Test or Process and feedback to respective product owners for continuous improvements with quality alerts on workstation instruction to prevent invalid rejects re-occurrence impact manufacturing low yield

• Responsible for compiling and maintaining PCBA debug records associated with test and debug processes for key improvements

• Support manufacturing MRB weekly review on hardcore, bon-pile or beyond repair PCBA for salvaging efforts

Education

Bachelor of Engineering - Electrical, Electronics Engineering Technologies

University of Lincoln
Brayford Pool, United Kingdom
11.2000 - 03.2003

Associate of Applied Science - Electrical, Electronics Engineering Technologies

Megatech Institute
Kuala Lumpur, Malaysia
Apr.1995 - Mar.1998

Associate of Arts - Accounting And Business Management

Keat Hwa (Private) School of Business Studies
Alor Setar, Kedah, Malaysia
01.1993 - 02.1994

High School Diploma -

Keat Hwa High School
Alor Setar, Kedah
Jan.1987 - Nov.1992

Skills

  • Project Management
  • Project Planning
  • Lean Manufacturing and Design
  • Multi-Unit Operations Management
  • Conflict Management
  • Performance Evaluations
  • Processes and Procedures
  • Cross-Functional Collaboration
  • Change Control Processes
  • HVAC Systems
  • Microsoft Office Suite Expertise
  • Quality Assurance and Control
  • Project Development
  • New Product Introduction Strategies
  • Project Scope Analysis
  • Technical Specifications
  • Project Deadlines
  • Status Updates
  • Project Drawings
  • Managing Multiple Projects
  • Materials Take-Offs
  • Timely Project Completion
  • Project Records
  • Project Goals and Milestones
  • Presentations
  • Forecasting
  • Teamwork and Collaboration
  • Process Improvement Initiatives
  • Operational Procedures
  • Employee Performance Evaluations
  • Manufacturing Operations Management
  • Corrective Actions
  • Root Cause Analysis
  • Staff Management
  • Process Improvement Strategies
  • Continuous Improvements
  • Complex Problems Analysis
  • Process Engineering
  • Review of Design
  • Stencil Design
  • Advanced Quality Planning (AQP)
  • Vendor Management
  • Risk Management
  • Pre-Production Approval Process (PPAP)
  • Gauge R&R
  • Failure Mode Effect Analysis (FMEA)
  • Statistical Process Control (SPC)

Accomplishments

Ops Project Manager III - Jabil

• Successfully transferred of Phase I 32 models from sister-site (Jabil Huang Pu) to Jabil Penang within 3 months from July to September 2020

• Successfully transferred of Phase II 40 models from sister-site (Jabil Huang Pu) to Jabil Penang within 3 months from May to July 2021

• Successfully implement Jabil Advanced Quality Planning tools to monitor project compliance within each phases of the project by models from PCBA level to HLA level with regards to Manufacturing Awards, Product Planning, Engineering Evaluation, Product validation and Start of Production prior project kick start

• Work with Industrial Engineering, EHS and Facilities to establish facilities setup readiness, floor space allocation and expansion for additional hook-up and installation of test equipment, conformal coating machine, oven, chamber and approve chemicals to be used in the plant

• Work with Test, Logistics and Facilities team to facilitate the transfer of tooling via land freight from sister-site (China) to Jabil Penang plant, which spanned across from China, Laos, Vietnam, Cambodia, Thailand and Penang is to ease the lead time from 14 days to 8 days in which previously deployed by sea route

• Work with Customer, Business Unit, Procurement, Supply Chain to facilitate the materials transfer from sister-site (Jabil Huang Pu) to Jabil Penang within 10 days

• Steer and co-ordinate with Workcell and production team to expedite the manufacturing processes from SMT until shipping to ensure meeting customer on-time delivery within 14 days

• Successfully get customer agree to procure materials from open market due to non-availability from approved supplier

• Successfully localize packaging materials to local supplier instead of depending on overseas supplier to eliminate the lead time from 14 days to 10 days

• Successfully established materials inventories system to prevent unexpected materials shortages by introducing “Min” and “Max” level particularly for long lead time materials

• Successfully performed and identified DFM issues to customer pertaining to PCB layout flaws on the “Hot-Items” to improve before kick-off mass production

• Live video call with sister-site Team and customer to provide technical expertise in terms of training needs analysis for tester setup, installation and verification with known good sample prior qualification build kick start

• Successfully applied Fishbone chart to indicate the cause and effect of the header and receptacle connector in which recommend to customer to replace with key-in plug type instead of threaded plug type

• Successfully achieved Phase I qualification build of 32 models kick-off on October 2020 successfully shipped and delivered by mid of December 2020

• Successfully achieved mass production of 20 models officially kick-off on mid of January 2021 and shipped by March 2021

• Successfully achieved mass production of 15 models officially kick-off on April 2021 and shipped by mid of May 2021

• Successfully achieved Phase II qualification build of 40 models kick-off on August 2021 successfully shipped and delivered by mid of October 2021

• Successfully achieved mass production of 10 models officially kick-off on December 2021 and shipped by January 2022

• Work cohesively with Keysight Penang and US Team and external supplier to expedite part changes qualification of the approval changes made on the mechanical drawings and materials readiness delivery

• Advised to Keysight Penang and US Team with regards to the EMI gasket rework risk assessment due to potential copper gasket will drop off during the removal process internally of the chassis if miss out, potential risk of electrical shock

• Successfully support from Keysight US Test Team to release test software of the 5 units to overcome fan speed issue due to incompatible version from previous batch

• Successfully overcome changes made on the modification of metal enclosure of Keysight NAS, and shipped pilot build unit of 5 sets to meet urgent delivery

• Successfully drive for ECN release of new parts pertaining to new parts cut in from 5 days to 2 days to meet customer urgent shipment

• Successfully completed 14 units of RMA remodeling units from Keysight NAS to lower cost version, in which 4 units consists of Direct Order Fulfilment (DOF) shipped direct to customer

• Established project schedule and share to customer on the lead time of the materials prior to commit schedule delivery

• Live video call with Advantest Team to provide technical expertise in terms of training needs analysis for tester test head wiring upgrade

• Work with Industrial Engineering team to expedite the replacement of tester test head POGO block wiring from previous AWG22 to AWG18 with total of 10 sets for Advantest Verigy 93000 EXA Scale SOC Test System

• Successfully shipped 2 units pilot build of SOC Test System Ringo mainboard to Advantest US

• Steer and execute Advanced Quality Planning tools for all project execution with 2 weeks timeline prior phase gate review kick-off with respective stakeholders

• Successfully drive and execute product validation phase within 3 weeks prior meeting Workcell quality objective of FPY 97.00% before moving to SOP phase

• Successfully drive and closed SOP phase of 5 models out of 25 models to fully release to manufacturing

• Successfully reduce aging WIP’s from 140 units to 10 units consists of 3 customers

Manufacturing Section Head - IQ Group Holdings Berhad

• Implemented Just-in-Time (JIT) production methodology to control costs and inventory, resulting in a 20% improvement in efficiency

• Replaced labour-intense processes while simultaneously enhancing workflow through new technology that reduced staff by 15

• DFM to re-design multi cavities PCB slot width from 5.0mm to 2.0mm to eliminate solder overflow

• DFM to improve QFP package ambient light sensor PCB foot print width from 0.5mm to 0.7mm to eliminate solder non-wetting issues

• DFM to improve PTH regulator solder bridging to enlarge PCB foot print length from 2.0mm to 5.0mm, to enable solder dragging effect and prevent excess solder during wave soldering process

• DFM feasibility study to use “Bow & Twist“ with thickness measurement filler method to measure PCB warpage > 7mils / inch spec, and propose to R&D to re-design PCB layout by adding extra PCB edge to strengthen and prevent PCB warping issue during wave soldering process

• Propose to R&D group on SMD component orientation placement to follow IPC-610 standard to eliminate solder non-wetting issues

• Propose to Engineering group to add silicone standoff against the PTH IR lead to prevent bending caused by optical lens after enclosure

• Propose to Engineering group on PIR sensor seat to revise the existing stud diameter from 0.5mm to 0.4mm (±0.01mm) to compensate the PIR sensor seat stud insertion issue against the PCB, trigger SQE to perform upfront sample inspection on supplier site to prevent issue reoccurrence

• DFM feasibility studies to propose and improve existing PCB reliability material (Phenolics) to FR4 double sided 4 layers material for optimum product quality

• DFM to improve power supply module multicore lead wire of AWG25 (0.455mm) protruded 4.0mm cause solder cracked, thus increased the lead wire protruded to 4.5mm when wave soldering process against the PCB PTH sufficient lead wire to form solder bell curve

• Failure analysis on metal core PCB LED due to no light up issues during power up test, after investigation found mechanical overstress during de-panelize process, improvement on de-panelize equipment by adding linear slider underneath the support jig to prevent metal core PCB bending leads to mechanical overstress

• Improve to add stiffeners on solder wave solder pallet to support the wire harness from bending cause insufficient solder against the PCB

• Apply pin chart with PCBA assembly drawing to initiate immediate action against quality issues related to process, design and workmanship to serve as a quality alert for improvement

• Connect transient voltage suppressor (TVS) in the functional tester against the output voltage with respect to the test probe to arrest sudden high voltage against the DUT

• ROI on benchmarking various selective wave soldering machines vs existing and new product in associated with product and machines capability and process improvements

• Formulate and implement PCBA repair procedure and chart to assist Repair Technician establish proper method on PCBA troubleshooting with the use of right soldering and de-soldering tools with respect to the components

• Identify training needs analysis (TNA) for existing Repair Technician, new hires, and interns to perform practical training with the use of obsolete or scrap PCB

• Execute weekly MRB meeting with the respective department Team members to advise the corrective action of PCBA disposition. (hardcore PCBA, beyond repair, incoming defective (material), workmanship, process)

• Successfully coordinate product transfer and manufacturing support built (350pcs PCBA, 350 complete unit) on Aug 2016 to Nov 2016

• PTH barrel fill improvements by pre-heat the PCB 100°C at 60sec to eliminate thermal lag, and perform X-ray inspection to observe PTH barrel > 75% filled per IPC standard 610

• Improvements on PCB stencil aperture dimension opening design for existing PCB re-layout to eliminate solderability issues

• Metal core PCB de-panelize equipment top and bottom blade cost reduction from RM3,400 to RM2,280 quarterly

• DFM feasibility studies to improve PCB layout by removing jumper connection to replace by copper track (cost improvement: RM15,000)

• DFM solder bridging improvements to revise PCB layout based on IPC610 standard (cost improvement: RM10,785 quarterly)

• Reduced staff by 20 while maintaining production levels through a redesign of operational processes and improved training and staff utilization

• Play integral role in identifying and transitioning work to outsourced vendor, reducing total manufacturing costs by 30%

• Replace PTH components manual soldering to automated robotic PTH components soldering process with customized fixture supported (cost improvement: RM35,380 quarterly)

• Implement wave soldering palletize to reduce conveyor changeover cycle time by standardize the wave soldering pallet dimension (cycle time improvement: - setup time: 20 mins (before palletize), setup time: 0 mins (after palletize)

• Implement semi-automated feed robotic soldering machine to eliminate labour intensive dependency on manual soldering process of plating through hole components with respect to the PCB

• Observe PCB substrate delamination caused bubbling issues during wave soldering process, failure analysis on cross-section determine moisture trapped within PCB internal layer, proposed PCB pre-heat at 100°C at 60sec prior wave soldering process, excess PCB to vacuum pack to prevent further moisture trap

• Improve manual heatsink thermal paste application jig to cost effective pneumatic universal base with customized stencil thermal paste application jig

• Implement Hi-Pot test with 1.8KV at 0.8msec probing on the metal casing of High Bay and Mid Bay Lamp to ensure no current leakage

• Define and implement snubber circuits to serve as a protection circuit in the power supply module occurs due to switching operation, lightning strikes, short circuits

• Implementation of manufacturing activities include continuous process improvements via KANBAN and KAIZEN process using PDCA tools

• Drive and manage overall PCBA repair WIP to 5% target weekly

• Reduced non-recurring engineering (NRE) cost by 40% to eliminate non-value added services on the manufacturing activities

• Reduced RFQ processing lead time from 4 days to 2 days resulting in USD450k in cost savings per year

• Successfully handled various capacity expansion, cost reduction activities and quality improvements project from counterparts in Taiwan, China, US, Europe and Japan

Test Design Engineer II - Plexus Corp, Electronics Manufacturing Services (EMS)

• Development of functional tester to test the PCBA level of a patient monitor module using NI LABView test platform to execute the test sequence

• Development of St. Jude Medical devices HLA Tanto Hi-Pot tester using Plexus Test Executive to execute the test plan

• Improvement on X-Ray Universal RAD mainboard by adding a fly-back diode to the device as protection from high inrush current flow back

• Implement the self-test platform to identify the hardware malfunction for the aerospace electronic devices

• Improvement in terms of testability of the functional tester with respect to hardware and software to identify and eliminate the intermittent issues and flaws

• Re-designed relay switching cards by adding fly-back zener diode in parallel with the relay output to prevent high inrush current storage in the relay flow back to the system circuitry after power off which causes malfunction to the system circuitry

• Manage ECO change for software release application package, control matrix, BOM

• Improvement on Bluetooth test device to eliminate the intermittent failure by implementing RF Shield-box

• Improvement on the functional tester failed to power on the device during boot-up on respective test cavities to add grounding wires

Senior Test Development Engineer II - Kontron Asia Pacific Design Sdn. Bhd.

• Develop mechanical functional fixtures and jigs to support manufacturing test on networking protocol for IP KVM switches on OEM branded (Avocent, IBM, HP, Dell, Fujitsu-Siemens)

• Hardware development for device firmware via TFTP and RS232 programming

• Analyzing device hardware and software architecture to develop test specific requirements for testing

• Designed and implemented interface hardware for PXI test platform.

• Maintain device that have been previously released to manufacturing for testing, these often includes test code debugging, test hardware interaction

• Integrate test solution for optimum test coverage and automation.

• Improvements on manufacturing test time by splitting the existing test station to the next station to eliminate bottleneck test time

• Execute test development activities on various platform (Electronics, Electrical, Mechanical and Electro-Mechanical) and implement pneumatic mechanical test jigs and fixtures design to ease test manufacturing processes improvement

• Hands on customized tester for overall interface parts assembly, installation and manufacturing test setup

• Successfully developed, installed and setup of Qualcomm PCBA level test and HLA level test with total of 34 units of tester in Production ramp up

Test Manufacturing Engineer I - Siemens VDO Automotive AG

• Maintain automotive tester and equipment to ensure test specification are within the limits and compliance with TS16949 automotive standard

• Develop tester maintenance procedure for maintenance support Technician to carry out tester maintenance guidelines, and training purposes

• Improve product test coverage for through hole components from In-Circuit test system by adding test jet on top of the components to detect either open or short test

• To perform system self-test on test equipment with known good sample to validate the individual section and sub-section test system hardware failure which contribute either from test equipment or device under test (DUT)

• Identify designated test probes are being deployed against the DUT to prevent false reject by weekly audit each test jig, and immediate action replace the required test probes

Test Engineering Technician II - Unico Technology Berhad

• Undergone industrial training at Intel Kulim Motherboard Design Center of Malaysia (BDCM), and gained beneficial experience to learn about the actual board design concept, circuit analysis, engineering change and identify fault locating techniques

• System configuration and supporting circuits with the development of new ICs which were to be used in the latest motherboard system

• Evaluation and troubleshooting of IC's prototype circuits, and series of performance and reliability specifications (radiated and conducted emissions, RF immunity, EFT/B and surge immunity, voltage dips/interruptions, high and low temperature tests, temperature cycle test, aging test, etc)

• Provide key training to manufacturing Repair Operator to upscale their repairing skills, with the use of right tools and IPC standard 7711/21 methodologies to perform repair on the rejected main board

• Develop PCBA WIP tracking matrix based on product models to ease repairing activities with pivot table

• Introduce the product directly to a sub-contractor manufacturing facilities and supporting the initial production process in order to ramp up the yield

• Hands on experience in repairing and debugging complex PCBA down to SMD component level of soldering from 0201 to 2512 packages and de-soldering of (SMD, BGA, MSOP, QFP, TQFP, PLCC, SSOP, Fine Pitch)

• Hands on test equipment handling (Multimeter, DC Power Supply, DC Electronic Load, Oscilloscopes, Curve Tracer, Logic Probe, RF Shield-box, Spectrum Analyzer, Network Analyzer, Data Logger, Data Acquisition, Signal Generator)

Certification

  • Certified LEAN Six Sigma, Jabil
  • Microsoft Project, OTC Training Center
  • ISO9001:2015, SGS Academy
  • ISO14001:2015, SGS Academy
  • Compliance & Management Risk, MYWAVE
  • Six Sigma & DFSS, Neville Clarke
  • LabVIEW Development, National Instruments
  • Social Responsibility System SA8000, Total Performance Advance Consultancy

Languages

English, Chinese (Mandarin), Chinese (Cantonese), Malay
Native language
English
Proficient
C2
Chinese (Mandarin)
Advanced
C1
Chinese (Cantonese)
Proficient
C2
Malay
Advanced
C1

Timeline

Ops Project Manager III

Jabil
03.2020 - Current

Manufacturing Section Head

IQ Group Holdings Berhad
06.2013 - 02.2020

Test Design Engineer II

Plexus Corp, Electronics Manufacturing Services
05.2010 - 05.2013

Senior Test Development Engineer II

Kontron Asia Pacific Design Sdn. Bhd.
04.2002 - 04.2010

Bachelor of Engineering - Electrical, Electronics Engineering Technologies

University of Lincoln
11.2000 - 03.2003

Manufacturing Test Engineer I

Siemens VDO Automotive AG
05.2000 - 04.2002

Test Engineering Technician II

Unico Technology Berhad
04.1998 - 04.2000

Associate of Applied Science - Electrical, Electronics Engineering Technologies

Megatech Institute
Apr.1995 - Mar.1998

Associate of Arts - Accounting And Business Management

Keat Hwa (Private) School of Business Studies
01.1993 - 02.1994

High School Diploma -

Keat Hwa High School
Jan.1987 - Nov.1992
Rudy Lee