Summary
Overview
Work History
Education
Skills
Software
Work Availability
Timeline
Languages
Generic
Ronald Tan Kian Hoe

Ronald Tan Kian Hoe

Site Supervisor / AutoCAD Drafter
W. P. Labuan

Summary

Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 5 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.

Overview

19
19
years of professional experience
3
3
Languages

Work History

TRAINEE TECHNICIAN / FABRICATION WELDER

ANTARA STEEL MILLS SDN. BHD.
07.2006 - 01.2007

PRACTICAL TRAINING ARRANGED BY ILP, LABUAN

TIG PIPE WELDER

IKUT JAYA ENTERPRISE
02.2007 - 03.2007

MECHANICAL TECHNICIAN / TIG Welder

ANTARA STEEL MILLS SDN. BHD.
03.2007 - 07.2007

COMBINATION WELDER (GTAW/SMAW)

DAYA ASAL ENGINEERING CONSTRUCTION
08.2007 - 03.2008

100MW GAS FIRED POWER PLANT PROJECT

COMBINATION WELDER (GTAW/SMAW)

TURCOMP ENGINEERING & SERVICES SDN. BHD.
06.2008 - 04.2009

PETRONAS METHANOL LABUAN (PML 1) CORRIDOR PIPING PROJECT

COMBINATION WELDER (GTAW/SMAW)

DIALOG PLANT SERVICES SDN. BHD.
08.2009 - 01.2010

PETRONAS METHANOL LABUAN (PML 1) SHUT DOWN FABRICATION & INSTALLATION

COMBINATION PIPE WELDER (GTAW / SMAW / GMAW)

LABUAN SHIPYARD & ENGINEERING SDN. BHD.
05.2010 - 01.2017
  • SUCCEEDED WELDING PROCEDURE SPECIFICATION (WPS) R1,R2 BASE METAL API X52 IN 6G POSITIONN FOR EPCC PERMAS (PR-PA) SUBSTRUCTURE & IPF (HOOK UP & COMMISSIONING) BY GMAW PROCESS
  • SUCCEEDED WELDING PROCEDURE SPECIFICATION (WPS) BASE METAL API X52 IN 6G POSITION FOR EPCC PERMAS
  • (PR-PA) SUBSTRUCTURE & IPF (HOOK UP & COMMISSIONING) BY GTAW / SMAW PROCESS
  • SUCCEEDED WELDING PROCEDURE SPECIFICATION (WPS) BASE METAL API 2H Gr.50 IN 1G POSITION FOR EPCC PERMAS (PR-PA) SUBSTRUCTURE & IPF (HOOK UP & COMMISSIONING) BY GMAW / SAW PROCESS
  • SUCCEEDED WELDING PROCEDURE SPECIFICATION (WPS) BASE METAL HIGH STAINLESS STEEL A312 S31254 IN 6G POSITION FOR SIAKAP NORD-PETAI & KAKAP (SNP) PROJECT OFFSHORE CONSTRUCTION SERVICES FOR KIKEH FPSO BY GTAW PROCESS

COMBINATION WELDER (GTAW/SMAW) (OFFSHORE)

PBJV GROUP
05.2017 - 11.2017

OFFSHORE TALISMAN AT KNDP-A

COMBINATION WELDER (GTAW/SMAW)

DAYANG ENTERPRISE SDN. BHD.
12.2017 - 06.2018

SHELL HUC-UP & COMMISSIONING (SHUC)

SITE SUPERVISOR / AutoCAD DRAFTMAN

TURCOMP ENGINEERING & SERVICES SDN. BHD
08.2018 - Current
  • SUCCEEDED PROJECT JUMPER-LINE AS A COMBINATION WELDER AT PETRONAS CARIGALI LABUAN GAS TERMINAL (LGAST)
  • SUCCEEDED PROJECT JUMPER-LINE 2 AS A COMBINATION WELDER AT PETRONAL CHEMICAL METHANOL LABUAN PLANT 1 (PCML 1)
  • SUCCEEDED AS A SITE SUPERVISOR FOR LATE-WORK-REQUEST PIPING & STRUCTURAL (LWR) BY EFFICIENTLY REPRIORITIZING WORKLOAD DURING PETRONAS CHEMICAL METHANOL LABUAN (PCML 1) TURN-AROUND (TA 2021)
  • SUCCEEDED M.E.T.A. PROJECT FOR FRESH WATER LINE PIPING & STRUCTURAL SYSTEM AS A SITE SUPERVISOR IN PETRONAS CHEMICAL METHANOL LABUAN PLANT 2 (PCML 2) AND PETRONAL CHEMICAL METHANOL LABUAN (PCML 1) IN 2023
  • SUCCEEDED MAJOR PIPING & STRUCTURAL (ORIGINAL WORKLIST) AS A SITE SUPERVISOR IN PETRONAS CHEMICAL METHANOL LABUAN PLANT 1 (PCML 1) DURING TURN-AROUND (TA 2024)
  • THREE (3) YEARS EXPERIENCED IN AutoCAD SOFTWARE OF PLANT 3D PIPING DRAWING.
  • ATTENDED AND COMPLETE AutoCAD 2D ADVANCE TRAINING AND AutoCAD 3D MODELING TRAINING UNTER ACADSYSTEM AT AMPANG, KUALA LUMPUR.
  • CURRENTLY SERVING AS A SITE SUPERVISOR / DRAFTMEN, OVERSEEING ONSHORE PIPING AND STRUCTURAL FABRICATION ACTIVITIES FOR THE PETRONAS FLOATING LIQUEFIED NATURAL GAS (PFLNG 1 & 2) SABAH HIGH SEA MAINTENANCE PROJECT, ENSURING ADHERENCE TO CLIENT REQUIREMENTS, SAFETY STANDARD, AND PROJECT SCHEDULE.

MAINTENANCE JOB FOR PFLNG 1 & 2:

- TO DRAW A 3D DRAWING FOR PIPE SLEEVE USING AutoCAD SOFTWARE AND MODIFICATION 20” & 28” PIPE TO INSTALL SS316 SLEEVE (PFLNG 1)

- CORIOLIS FLOWMETER PIPING (PFLNG 1)

- DRIP RING PIPING INSTALLATION (PFLNG 1)

- MLA TARGETING CONE (MLA) FLANGE RESURFACE (PFLNG 2)

- PORTABLE PUMP PIPING CONNECTION (PFLNG 1)

- SLOP TANK REDUCER PIPING CONNECTION (PFLNG 1)

- PROVISION TO PERFORM ONSHORE FABRICATION FOR PIPING REPLACEMENT (PFLNG 1)


Education

S.M.K. Mutiara
Labuan, Malaysia
04.2001 -

Industrial Training Institute ITI
Labuan, Malaysia
05-2005

CIDB CSWIP
Kuching, Sarawak, Malaysia
08-2007

LOTT Inspection
Labuan, Malaysia
10-2007

Antara Steel Mills Sdn. Bhd.
Labuan, Malaysia
03-2008

SMTC
Bintulu, Sarawak, Malaysia
06-2014

SEQU TAS
Kota Kinabalu, Sabah, Malaysia
07-2018

Skills

Team supervision

Software

AutoCAD 2D ADVANCE, AutoCAD 3D MODELING & AutoCAD PLANT 3D

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

SITE SUPERVISOR / AutoCAD DRAFTMAN

TURCOMP ENGINEERING & SERVICES SDN. BHD
08.2018 - Current

COMBINATION WELDER (GTAW/SMAW)

DAYANG ENTERPRISE SDN. BHD.
12.2017 - 06.2018

COMBINATION WELDER (GTAW/SMAW) (OFFSHORE)

PBJV GROUP
05.2017 - 11.2017

COMBINATION PIPE WELDER (GTAW / SMAW / GMAW)

LABUAN SHIPYARD & ENGINEERING SDN. BHD.
05.2010 - 01.2017

COMBINATION WELDER (GTAW/SMAW)

DIALOG PLANT SERVICES SDN. BHD.
08.2009 - 01.2010

COMBINATION WELDER (GTAW/SMAW)

TURCOMP ENGINEERING & SERVICES SDN. BHD.
06.2008 - 04.2009

COMBINATION WELDER (GTAW/SMAW)

DAYA ASAL ENGINEERING CONSTRUCTION
08.2007 - 03.2008

MECHANICAL TECHNICIAN / TIG Welder

ANTARA STEEL MILLS SDN. BHD.
03.2007 - 07.2007

TIG PIPE WELDER

IKUT JAYA ENTERPRISE
02.2007 - 03.2007

TRAINEE TECHNICIAN / FABRICATION WELDER

ANTARA STEEL MILLS SDN. BHD.
07.2006 - 01.2007

S.M.K. Mutiara
04.2001 -

Industrial Training Institute ITI

CIDB CSWIP

LOTT Inspection

Antara Steel Mills Sdn. Bhd.

SMTC

SEQU TAS

Languages

English
Full Professional
Malay
Full Professional
Chinese (Mandarin)
Full Professional
Ronald Tan Kian HoeSite Supervisor / AutoCAD Drafter