AutoCAD 2D ADVANCE, AutoCAD 3D MODELING & AutoCAD PLANT 3D
Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 5 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.
PRACTICAL TRAINING ARRANGED BY ILP, LABUAN
100MW GAS FIRED POWER PLANT PROJECT
PETRONAS METHANOL LABUAN (PML 1) CORRIDOR PIPING PROJECT
PETRONAS METHANOL LABUAN (PML 1) SHUT DOWN FABRICATION & INSTALLATION
OFFSHORE TALISMAN AT KNDP-A
SHELL HUC-UP & COMMISSIONING (SHUC)
MAINTENANCE JOB FOR PFLNG 1 & 2:
- TO DRAW A 3D DRAWING FOR PIPE SLEEVE USING AutoCAD SOFTWARE AND MODIFICATION 20” & 28” PIPE TO INSTALL SS316 SLEEVE (PFLNG 1)
- CORIOLIS FLOWMETER PIPING (PFLNG 1)
- DRIP RING PIPING INSTALLATION (PFLNG 1)
- MLA TARGETING CONE (MLA) FLANGE RESURFACE (PFLNG 2)
- PORTABLE PUMP PIPING CONNECTION (PFLNG 1)
- SLOP TANK REDUCER PIPING CONNECTION (PFLNG 1)
- PROVISION TO PERFORM ONSHORE FABRICATION FOR PIPING REPLACEMENT (PFLNG 1)
Team supervision
AutoCAD 2D ADVANCE, AutoCAD 3D MODELING & AutoCAD PLANT 3D