Summary
Overview
Work History
Education
Skills
Software
Additional Information
Timeline
Generic

Rakesh Nair

Kuala Lumpur

Summary

Results-driven safety professional with a strong foundation in construction safety practices and regulations. Recently transitioned into the role of Clerk of Works to broaden expertise and contribute to successful construction projects. Demonstrated ability to ensure compliance with specifications, regulations, and quality standards. Equipped with a solid technical knowledge of civil and structural engineering principles, coupled with a keen eye for detail and a commitment to maintaining the highest safety standards.

Experienced in conducting thorough site inspections, monitoring construction activities, and documenting site progress. Proficient in coordinating with contractors, subcontractors, and project stakeholders to address issues and drive project success. Strong communication skills enable effective collaboration and the ability to deliver clear and concise reports.

Proven track record of identifying and resolving construction-related challenges while maintaining a focus on safety. Extensive familiarity with local building codes, health and safety regulations, and environmental requirements. Adaptable and proactive, capable of adapting to changing circumstances and delivering results in fast-paced environments.

By leveraging a background in safety management and venturing into the Clerk of Works role, consistently deliver projects on time, within budget, and to the highest quality standards. Seeking to utilize expertise in construction safety and project coordination to contribute to the successful completion of challenging construction endeavors.

Overview

10
10
years of professional experience
4
4
Languages

Work History

Clerk of Works/Inspector of Works

Guocoland Malaysia Berhad
Kuala Lumpur
07.2017 - Current

Projects;

1. Construction of Sales Gallery 2017-2018

2. Earth Works and Drain Diversion 2018-2020.

3. Piling Package 1 2019-2020.

4. THE EXECUTION AND COMPLETION OF SUPERSTRUCTURE AND ASSOCIATED WORKS (PARCEL 1 – PACKAGE A) FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN BHD 2019-2023.

5. THE EXECUTION AND COMPLETION OF SUPERSTRUCTURE AND ASSOCIATED WORKS (PARCEL 1 – PACKAGE C) FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN BHD 2020-2023 .

6. THE EXECUTION AND COMPLETION OF UPGRADING WORKS ALONG CHERAS-KAJANG EXPRESSWAY (CKE) FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN BHD (PILING, BRIDGE STRUCTURE & ANCILLARY WORKS, UPGRADING EXISTING ROAD AND INFRA WORKS) 2019-2023 .

7. THE EXECUTION AND COMPLETION OF PILING, PILE CAP, PAD FOOTING, STRUCTURAL WORKS, SOIL NAILING WALL, M&E SERVICES AND ASSOCIATED WORKS (PACKAGE 3 & 4) FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN BHD. 2021-2023

8. THE EXECUTION AND COMPLETION OF EXTERNAL SEWERAGE SYSTEM AND UPGRADING WORKS OF EXISTING SEWERAGE TREATMENT PLANT AND NETWORK PUMP STATION FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR 2021-2022.

9. THE EXECUTION AND COMPLETION OF EXTERNAL LINK BRIDGE, COVERED WALKWAY AND ASSOCIATED WORKS FOR PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN. BHD. 2022-2023.

10. THE EXECUTION AND COMPLETION OF EXTERNAL INFRASTRUCTURAL AND ASSOCIATED WORKS (INTERIM) FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN FOR GLM EMERALD SQUARE (CHERAS) SDN. BHD. 2022-2023.

11. THE EXECUTION AND COMPLETION OF WATER PIPE DIVERSION FOR THE PROPOSED EMERALD 9 CHERAS DEVELOPMENT ON LOT 809 AND 810, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN 2022-2023 .

12. FASA 4: 2 BLOK 1072 UNIT PANGSAPURI PERKHIDMATAN (KEDIAMAN) (BLOK C – 536 UNIT & BLOK D – 536 UNIT) 44 – 45 TINGKAT TERMASUK 8 TINGKAT PODIUM TEMPAT LETAK KERETA (TLK) BERSERTA KEMUDAHAN. PEMBANGUNAN SECARA ‘TRANSIT ORIENTED DEVELOPMENT' (TOD) DI ATAS LOT 58697 (DAHULUNYA LOT PT 60109 DAN JUGA LOT 809, 810), MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. UNTUK TETUAN GLM EMERALD SQUARE (CHERAS) SDN BHD. 2022- Ongoing.

Job Description and Responsibilities.

  • Quality Assurance: Monitor construction activities on-site to ensure compliance with design specifications, quality standards, and relevant codes and regulations.
  • Site Inspections: Conduct regular inspections of the construction site to check the progress, quality, and safety of the work being carried out.
  • Documentation: Maintain detailed records of site activities, including daily reports, inspection reports, and any deviations from the original plans.
  • Compliance: Ensure that construction activities comply with health and safety regulations, environmental requirements, and local building codes.
  • Coordination: Collaborate with contractors, subcontractors, and other stakeholders to resolve any construction-related issues and ensure smooth progress of the project.
  • Material Inspection: Inspect and approve construction materials delivered to the site, ensuring they meet the required specifications and standards.
  • Change Management: Assess proposed changes or variations to the original plans, evaluate their impact, and provide recommendations to the project team.
  • Problem-solving: Identify potential construction issues or conflicts and provide practical solutions to address them effectively.
  • Progress Reporting: Provide regular updates to the project manager or client regarding the construction progress, highlighting any delays, challenges, or variations encountered.
  • To attend on monthly progress claim verification (work done).
  • To maintain all relevant forms, documents, correspondences and records in respect to daily work records.
  • To ensure that materials used are in accordance to contract specifications.
  • To issue site memo/ NCR to contractors for work not comply to required Quality Standard, Construction Drawings and Specifications.

Clerk of Works

Guocoland Malaysia
07.2015 - 07.2017

Project;
Damansara City; Consist of 2 Office Tower, 2 Service Apartment, 1 Hotel Tower & Mall

Project Involve;

Construction of 2 Office Blocks, Hotel Tower, Mall and Infrastructure.

  • Performing site supervision and coordination to ensure that the works carried out by the Contractors are within quality standards and correcting specification.
  • Regularly report to relevant superiors on the progress of works, preparing and update daily progress report.
  • To attend on monthly progress claim verification (work done)
  • To maintain all relevant forms, documents, correspondences and records in respect to daily work records.
  • Regularly report to relevant superiors on the progress of works, preparing and update daily progress report.
  • To ensure that materials used are in accordance to contract specifications.
  • To issue site memo/ NCR to contractors for work not comply to required Quality Standard, Construction Drawings and Specifications.
  • Involve in enhancing works for Mall and Residence.

Safety Executive

Guocoland Malaysia
Kuala Lumpur
07.2014 - 07.2016

Project;

Damansara City; Consist of 2 Office Tower, 2 Service Apartment, 1 Hotel Tower & Mall

Job Description and Responsilities

  • Identified accident causes and optimal prevention strategies by conducting thorough investigations and analyses.
  • Monitored workplace activities to determine compliance with safety regulations and standards.
  • Researched and devised new safety initiatives and strategies to improve safety performance.
  • Devised and monitored safety performance metrics to assess and improve safety performance.
  • Investigated incidents, determining root causes and implementing corrective actions.

Education

Bachelor of Science - Safety And Health

Curtin University
Perth Australia
07.2010 - 2013.02

Skills

    Attention to Detail

undefined

Software

Microsoft Words

Microsoft Power Point

Microsoft Excel

Additional Information

References

Lai Soong Kong

Construction Manager

012-3856626

Timeline

Clerk of Works/Inspector of Works

Guocoland Malaysia Berhad
07.2017 - Current

Clerk of Works

Guocoland Malaysia
07.2015 - 07.2017

Safety Executive

Guocoland Malaysia
07.2014 - 07.2016

Bachelor of Science - Safety And Health

Curtin University
07.2010 - 2013.02
Rakesh Nair