1. Inspiron Consolidation Project (2021)
- Consolidated Inspiron LOB Model Splitter structures across multiple regions.
- Created new Model Splitter categories for 2-in-1 products and deprecated outdated series globally.
2. E-Support Structure Cleanup – Monitors & Accessories (2021)
- Reorganized the outdated monitor hierarchy where all products sat under a single parent node.
- Built new LOB-specific categories (e.g., C-Series, Legacy Monitors) and migrated products based on customer requirements.
3. Monitor Deals Launch (2021)
- Supported weekly monitor-deals launch and collaborated with IT to troubleshoot the new 8225 → monitor-deals custom deals ID implementation.
4. OC Attribute Cleanup (2021)
- Project Manager for global OC Attribute cleanup.
- Coordinated with India (EMEA) team to clean ~1 million records — the largest table in CPV.
5. Sales Application / Configurator Globalization (OSC/DSA) (2021)
- Project Manager for OSC/DSA Globalization across APJ & EMEA (12 countries).
- Completed PROD & G4 setup across 3 phases; Phase 4 scheduled for rollout.
6. OptiPlex Redesign (2022)
- Created new category and Model Splitter nodes for the redesigned OptiPlex structure.
- Added 4 new Model Splitter nodes to Sales Category tables for Content Studio mapping.
7. Product Studio Migration – Wave 9 & Wave 11 UAT (2022)
- Led UAT for 9 frequently-used tables related to DSC/DSA, including:
Gateway Templates, Dynamic Scripting, Backfeeds, Dashboard Filters.
- Wave 11: Executed test cases for active-record toggles and missing-column defects requiring Dev Console cache clearing.
- Migration size: 55 screens/tables and 3M+ records.
- Identified 1,111 issues, with 95.6% resolved during migration.
8. Product Studio & GVT DDS 2.0 – Pilot & Launch (2023)
- Conducted pilot testing for multiple key tables:
Product Variants, Products, Catalog Products, Customer Set AMER/EMEA, API, etc.
- Performed full functional/Gateway testing.
- Reported 49 UAT issues, committed 124 hours, and supported the transition to DDS 2.0.
- Total project outcome: 254 issues reported; 89% resolved by development, enabling a smooth global transition.
9. Inspiron Plus Structure Update (2023)
- Added new Inspiron Model Splitter structures for Inspiron 14 7440 & 16 7640 NPL across 14 global profiles (APJ, EMEA, BR, US, CA, JP, KR, CN, HK, IN, MY, NZ, SMB variants).
- Completed in 2.5 hours.
10. Global Validation Tool – Automation Testing (2023)
- 128 automation rules created for G4 GVT; assigned 7 modules for UAT:
WRNTY_DURTN_YR, OS_BIT_COUNT, VID_BRAND, VID_MODEL, KEYBRD_TYPE, HD_CAPACITY_GB, FORM_FACTOR.
- Logged 49 defects resolved by Developers.
- Contributed 31.5 hours to the testing cycle.
11. Desegmentation Cleanup – Consumer (2023)
- Cleaned Featured SNA SKU table in Product Studio Workbench.
- Removed ~2,500 obsolete records.
- Total effort: 4 hours.
12. OptiPlex Restructure (2023)
- Created 12 new OptiPlex product categories and deployed them across APJ and BR_SMB structures.
13. SnP Tech Specs Automation (2023)
- Managed tech spec assignments for 460 Spare LCD & Keyboard records × 4 country profiles (FR/CH/LU/BE).
- Built a VBA macro to automate data entry and significantly improve processing speed.
- Total commitment: 34.5 hours.
14. Consolidate US catalogs 18 and 08 - PROD (2024)
- Weekend support and Pre-setup for Customer Set and on the day setup for PAC and PS
- Customer Sets impacted are usac1f and usglob1f where setup includes and below
- Mapping the following segments to catalog 8 / US_SMBR:
[ 39 - OFFLEG500 ] Offline LE Global 500
[ 58 - OFFUSAC ] OFFUSAC
- Mapping the above segments with US_SMBR to the global product tree/structure OSC_GLOBAL.
- Moving the following 2 customer sets from catalog 18 to 8 in Catalog tools and PAC:
usac1f (segment 58 - OFFUSAC)
usglob1f (segment 39 - OFFLEG500)
- Map the customer sets to US_SMBR with the above segments.
- Cleanup of old customer sets that will no longer be supported (like g_18 and others).
15. Product Studio FY25 0503 Angular Launch (2024)
- Supported Angular Launch UAT test in G4, Pilot and PROD to identify issues and reporting to Dev and complete each G4 and Pilot in 1 week time, and PROD testing within 7 hours for Collections below.
- Product Sales Alias
- Product Variant Sales Alias
- Component Type Chassis Modules
- Catalog OC Attributes
- Customer Sets AMER
- Customer Sets EMEA/APJ
- Sales Catalog
- Sales Catalog Customer Sets
- Sales Catalog Segments
- Sales Catalog Structure
16. EMEA Spare parts attribution setup (2024)
- Setup is done in Content Studio which includes LCD and Keyboard Spareparts for over 450 Q-codes as below
- Spent 29 hours for both LCD and Keyboard attributes as below
- LCD - DisplaySurface, PanelInterface, BLU(backlightUnit), ViewingAngle, MechType, AspectRatio, PixelType, Brightness(nits), NTSCColorGamut(%), Type, SpecialFeatures, Size(in), ResolutionType, *FCC#, TouchPanelType
- Keyboard - Localization, Keycoating, Marketing Code Name, NumberOfKeys, Backlit, Type, Connection, Height(cm), Width(cm), Battery WH Rating, Multimedia, Wireless