Summary
Overview
Work History
Education
Skills
Software
Certification
Quote
Reference
Timeline
SoftwareEngineer
Muzammil Aiman Bin Abdullah Bahadur

Muzammil Aiman Bin Abdullah Bahadur

Telecomunications
Temerloh,Pahang D.M.

Summary

SUMMARY OF EXPERTISE & KNOWLEDGE :

Project Management , QA/QC, Technical Installation (TI) works, Testing & Commissioning, Technical Site Survey, Site Audits

and Acceptance Test.

Overview

4
4
Languages
2
2
Certifications
13
13
years of post-secondary education
26
26
years of professional experience

Work History

TSSR Engineer

Elabram Sdn Bhd
Kuala Lumpur, Kuala Lumpur
03.2020 - 05.2021

Project : WEBE-NFCP2

  • Responsible for site CME design based on RF and Transmission request.
  • Responsible or site design verification and enhancement (TSSR review).
  • Project coordination with WEBE internal and external team.
  • Review proposed CME drawings, site templates ,power requirements, and BOQ based on cost effective design.
  • Responsible for project and TSSR status tracking and reports.

Logistics Manager

AZRB Sdn Bhd
Kuala Lumpur, Kuala Lumpur
09.2018 - 04.2019

Project : Construction of Jalan Hang Jebat, Jalan Stadium (Victoria Instituition) And Chin Woo Tunnels, Elevated U-Turn And Flyover, Galloway Pedestriaan Bridge, Relocation of Existing Utilities, Upgrading And Improvement of Surface RoadAnd Associated Works, Mukim Bandar Kuala Lumpur, Wilayah Persekutuan Untuk Tetuan PNB Merdeka Ventures Sdn Bhd. PMV. Infra Package 06, 07 & 10.

  • To assist the Project Manager/Project Director in detailed logistic planning.
  • This will include planning routes from work sites to off-load sites for the effective removal of excavated material.
  • To liase with clients - PNB Merdeka Ventures Sdn Bhd & PNB, local authorities – DBKL,JKR, JKKP Wilayah Persekutuan, Utilities service provider- TM,Telcos, SYABAS etc, PIGB, building management etc on logistics matters and other relevants as required.
  • Ensuring the effective transit of all materials and equipments around the project area etc.
  • To plan and execute the movement permissions, road conditions and the impact of traffic on the delivery of the logistic plan.
  • To plan and provide on the ground co-ordination between the project and the subcontractor.
  • To ensure that the sub-contractor complies with company procedures and that any lapses by the sub-contractor are caught and addressed, as early as possible.
  • Responsible in keeping the sub-contractor informed of any changes to the programme schedule, which may result in changes to the numbers of sub-contracted assets employed on a particular task.
  • Responsible for material management and distribution, to include the management of small tools and consumable items.
  • Excavated Material Removal Successful planning and delivery of the excavated material removal process in accordance with company procedures.
  • Small Tools and Consumables Effective distribution and tracking of small tools and consumables.

Implementation Manager

ZTE (Malaysia) Corporation Sdn Bhd
Kuala Lumpur, Kuala Lumpur
09.2016 - 09.2018

Main Tasks : Manage Microwave TX Transport E2E for ZTE-UMobile Multiband Projects/ LL Migrations/ PTN&M6K Migrations.

  • To manage, plan and organize on technical plan for UMobile Nationwide microwave transmission project rollout, link upgrade, re-engineering, LL migration, new site, DCN IP plan and operation issue (E2E microwave NEC Pasolink NEO HP/A, iPASO 200 & VR Series) as per Purchase Orders or Work Orders accordingly to the given time frame and targets.
  • To manage, plan and organize teams of ZTE & Subcontractors Field Engineers to perform Installations, Testing and Commissioning task accordingly to the given time frame and targets.
  • To support, investigate and provide technical solutions for issues related to roll-out implementations, commercial matters, site design etc.
  • To manage and organize new materials and equipment deployment as per Site Technical Report, including manage decommissioned materials and equipment to designated warehouse.
  • To manage and analyze BOQ/Variations Order items as per Purchase Order /Work Order and As-Built conditions.
  • Responsible to manage and organize all additional planned activities, such Lease Line Migration, Site Capacity Upgrading etc, as required by Customer accordingly to Work Orders.
  • To manage, plan and responsible for preparing the project documentation on project planning and support implementation team (UMobile Department TND, CAO TX, NIC, NOC and WP team) accordingly to the given time frame and targets.
  • Responsible for guide and advice the Integration Room, Field Engineer especially during live traffic migration activity. (MultiBand Tx Hw / Sw Upgrade, EM & EC Rollout, Maxis RAN Share Exit, re-engineering, Rehoming, LL Migration, RAN & PTN Project Plan Activity)
  • To manage, plan and organize teams for Technical Site Survey including documentations as per Work Order accordingly to the given time frame and targets.
  • To manage and organize teams of Back Office Engineers to Provide Level 2 technical support and any arising technical issue, including to monitor network performance to reduce outage.
  • To manage all real-time faults at site and responsible for troubleshooting activities.
  • To indentity issues related to roll out implementation and provide improvement solutions accordingly.
  • Improve Call Log / docket closure within KPI and maintain mobile network availability.
  • To manage all new materials/equipments for deployments and decommissioned materials and equipments to warehouse , including to update in SPMS.
  • To update progress and related matters in EPMS.
  • May be required to perform other job-related duties as assigned.

Implementation Managing Duties

  • Involved in the planning task includes defining the project objective and developing a timeline plan to accomplish the KPI Targets.

  • Organizing responsibility in identifying and securing necessary resources, determining tasks that must be completed, assigning the tasks, delegating authority, and motivating team members to work together on the project.

  • The controlling function involves tracking progress and comparing it with planned progress.

  • Gap analysis management ie. identifies problem areas, determines the reasons for deviations from the plans and initiates and follows-up on the implementation of corrective actions.

  • To ensure project financial plans are met, ensures all contractual requirements are performed on time and to the customer satisfaction, reviews, and approves all requirements and ensures adequate resources are available to implement required tasks, working closely with the customer point of contact to establish clear reporting and tasking points.

  • To coordinate & manage subcon’s related to major issues in delivering sites as planned.
  • To involve in product & service presentations to customers with relevant experts and teams.

  • To involve and assist in tender process.

  • To monitor & track on the customers/subcontractors Purchase Request/Purchase Orders /Work Orders

  • To plan and managed Acceptance Test Procuedure (ATP) accordingly to customers requirements.
  • To provide necessary Rollout Execution weekly & monthly report.
  • Forecast RE project activities and allocation of resources, tools, information and any other important
  • Itineraries- for planned routes for the regions.
  • Responsible for networks and Installations Quality Assurance
  • Identify and eliminate bottlenecks for all Microwave Transmission RNP Project/WO.
  • Coordination between customers, inter departments, sections, contractors and superiors for all matters related to all Microwave Transmission Project/WO.
  • Ensure all Microwave Transmission RNP Project datelines are met in terms of Rollout Execution SLA.
  • To ensure EHS/HSSE policy adhered and implemented at site without fail.

Implementation Manager

Huawei Technologies (Malaysia) Sdn Bhd
Kuala Lumpur, Kuala Lumpur
02.2015 - 09.2016

Main Tasks : Manage Microwave Transmission E2E with Huawei for 2G New Sites, 3G Sites, LTE(4G), PBTS/MBTS

  • Manage, plan and organize Re-engineering for Klang Valley Region in term of Rollout Execution Functionality according to Customer’s Purchase Order or Work Order accordingly to the given time frame and targets
  • Manage, plan and organize subcons workforce for Microwave Transmission (Huawei) RNP Work Orders for Klang Valley Region in term of Rollouts accordingly to the given time frame and targets.
  • To manage, plan and organize teams for Technical Site Survey including documentations as per Work Order accordingly to the given time frame and targets.
  • To plan and prepare Implementation Timeline and Execution Functionality.
  • To coordinate & manage subcon’s workforce related to major issues in delivering sites as planned.
  • To monitor & track on the subcon’s PR/PO, acceptance & performance as well.
  • To assist and participate in tendering and procurement process, if required.
  • To support and provide technical solutions for issues related to roll-out implementations, commercial matters, site design etc.
  • To manage and organize new materials and equipment deployment as per Site Technical Report, including manage decommissioned materials and equipment to designated warehouse.
  • Provide necessary Rollout Execution weekly & monthly report.
  • To involve, assist & participate in products and service introduction presentations.
  • Forecast RE project activities and allocation of resources, tools, information and any other important.
  • Itineraries for the regions.
  • Responsible for networks and Installations Quality Assurance
  • To plan and managed Acceptance Test Procuedure (ATP) accordingly to customers requirements.
  • Identify and eliminate bottlenecks for all Microwave Transmission RNP Project/WO.
  • Coordination between customers, inter departments, sections, contractors and superiors for all matters related to all Microwave Transmission Project/WO.
  • Ensure all Microwave Transmission RNP Project datelines are met in terms of Rollout Execution SLA.
  • Conduct meeting with Customer and all relevant contractors whom are responsible for Microwave Transmission (Huawei) RNP Project/WO.
  • Educate & evaluate contractors in terms of processes orientation, quality and relevant .technical matters.
  • To ensure EHS/HSSE policy adhered and implemented at site without fail.

Audit Coordinator – Architectural, C&S and M&E

S.N. Akmida Sdn. Bhd
Putrajaya, Putrajaya
02.2014 - 02.2015

Project : THE PROPOSED CONSTRUCTION AND COMPLETION OF 263 UNITS PUBLIC APARTMENTS (PPA1M) AT ZONE 12D, PRECINT 11, PUTRAJAYA MALAYSIA.

  • To heading and coordinating team of Site Auditors .
  • To ensure proper work method adhered according to the specification given and keeping within specified time frame set.
  • To conduct daily audit during implementation progress and instill awareness towards workmanship quality.
  • To coordinate and participate in Pre-Acceptance and Final Acceptance Test. Planning and zoning for audit activity including documentation.
  • To prepare and record daily, weekly and monthly report.
  • To prepare, update and conduct documentations and presentation to the clients, consultants, management etc during various progress meeting.
  • To conduct quality awareness induction to sub-contractors.
  • To liaise with consultants, local authorities, member of public and etc.

Senior Associate Consultant - Network Planning and

DIGI Telecommunications Sdn Bhd
Shah Alam, Selangor D.E.
09.2012 - 09.2013
  • To manage and supervise teams of sub contractor to succeed planned BTS swap activity which involved installations of RBS, BBU’s, RRU’s, Antennas, Feeder/Optic/Power cables and other CME related works by vendors –ZTE-Network & RBS,NEC-Mw/SM-Mw.
  • To assist in Test and Commissioning of RBS or Transmission Equipment including troublehooting.
  • To liase with Swap Room engineer during swap activity, troubleshooting or testing/commissioning.
  • To perform Site Acceptance Test for over all installation works such as RBS, Microwave system, Rectifier power system etc including aerial installation works of antenna system, fiber/feeder cables system, security/caging system etc
  • To monitor and conduct QA/QC inspections during and after installation.
  • To conduct and coordinate Site Acceptance with contractors/vendors and punch-list clearance. To prepare and issue Final Acceptance Certificate (FAC).
  • To perform and conduct or review Technical Site Survey including preparation of Technical Site Survey Report.
  • To test and confirm AC and DC power supply before and after installation and swap activity.
  • To ensure EHS/HSSE policy adhered and implemented at site.
  • To participate in troubleshooting and upgrading works.
  • To monitor/supervise fiber optic cabling and trenching works for HSBB/NGBB periodically.

Other Task :

  • Ensure site implementation of swap and recovery activities are executed as per plan and work targets.
  • Ensure that work by sub‐contractors/vendor are performed according to approved processes, SLAs, working practices, procedures, methods, specifications and guidelines
  • Oversee the general running of sites within assigned territory ensuring that the operations of these conform to HSSE policy
  • Participate in escalation and provide out of hours site visit support when required
  • Supervision of contractors working on network sites in assigned territory
  • Co‐ordination of Planned Works within assigned territory
  • Ensure a smooth implementation by design verification, pre‐construction walk, etc.
  • Ensure that documentation is completed
  • Participate in the evaluation of sub‐contractors (work and staff)
  • Check that the set of quality records (delivery document, commissioning, acceptance report…) related to the contract is performed, recorded and archived
  • Report on his own activities at least towards Cluster Manager, regional manager, project manager or Project Director
  • To prepare and update daily trackers accordingly.
  • To prepare weekly & monthly progress presentation to PM and Project Director
  • Push to solve simple issues and anomalies (technical, logistic...)
  • To provide support and troubleshoot during swap/recovery phases
  • Making calls to check with operation

Cell Site Technician

Sky Communication Pty. Ltd.
Melbourne, Australia
09.2011 - 04.2012

Tasks and duties :

  • Performing CME and RF Technical Site Survey(TSS) for BTS Swap Sites
  • Responsible for generating CME and RF Technical Site Survey Reports(TSSR).
  • Responsible for completing BTS swap from Nokia Equipment to Huawei BTS 3900L for Optus Metro 900 OverBuild Swap project and Vodafone-Huawei Swap project in Melbourne, State of Victoria, Australia.
  • Responsible for all hands-on installations of equipments e.g. BTS, Combiners, Feeders Tails, Connectors etc.
  • Responsible to TX rehoming/migrations
  • Testing and Commissioning/Troubleshooting of BTS and TX equipment
  • Responsible for all document preparation e.g. Site Documents, Inventory List, Quality Audit Sheets, Network Performance test, As-Built Drawings etc.
  • To conduct Site Audit after installation with before and after photo. To prepare and submit Audit report to clients.
  • Liasing with Vendors, Clients and local authorities.
  • Periodically seconded to Huawei Australia as Site Controller if required by Huawei in respectb to contract and customers requirements.
  • Responsible for the site work quality as required by client including to complete the task within the given time frame and cost.

Technologist - NIC

U-Mobile Sdn Bhd
Kuala Lumpur, Kuala Lumpur
12.2010 - 08.2011

Task and Key Duties

  • Identify the major and critical sites that need to be prioritized on all new and refurbishment sites.
  • Responsible for the compilation of data for all UMOBILE sites.
  • To review and recommend CME Technical Site Survey Report (TSSR) by vendors for approval.
  • Responsible for the CME BOQ- Pricing and quantity of sites to be done by Umobile with a complete scope from civil, mechanical, electrical (CME)and telecom installations works.
  • Coordinate all activities and schedules of acceptance for all on - going sites for refurbishment project.
  • Implementation/monitoring of the on-going refurbishment activities including share sites with other telco operators.
  • Responsible for the approval of the project quotation of all sites under refurbishment and shared sites project.
  • Responsible for the BOQ of the refurbishment of the Special o Swap Project.
  • Responsible on auditing and providing complete report on all problematic Tower UMOBILE GSM sites and report it directly to the Project Manager.
  • Providing and advise UMOBILE a better and safer GSM sites by focusing on all issues with regards on the major problems of the Tower(CME) and TI installation.
  • Ensured that all sub-contractors are following the specs and correct rectification on those all problematic tower from their submitted solution from the tower designer up to their implementation.
  • Ensured that all target date for the KPI is met by organizing a weekly one by one meeting with all the vendors that is involved on the project – Refurbishment and Share Sites

CME Coordinator

GTL Network Services (Malaysia) Sdn Bhd
Kuala Lumpur, Kuala Lumpur
06.2010 - 11.2010

Task and Key Duties

  • Implement, Monitor and review relevant KPIs to manage and improve project performance in respect to contracts and customers requirements.
  • Ensured that the Quality is implemented and subcontractors are following the standard.
  • Highlight all red flags and delays of each sub-contractors to the CME Manager and assuring that the red flags were been done according to the target plan and as per the client specifications.
  • Ensured that the target accomplishment of the site is on time with the quality by giving schedule to the partner and focusing to follow the schedule.
  • To perform CME Technical Site Survey(TSS) and generate Technical Site Survey Report (TSSR) to partners for approval.
  • To assist NSN for TSS & TSSR process up to the CME detail drawing design and on hand site activities.
  • Responsible for the site acceptance of sites
  • Responsible for the Bill of Quantity of each site for the partners.
  • Responsible for the technical issues on Roof top and Greenfield sites and tower strengthening for the additional loading for 3G.
  • Coordinate with the service provider and subcontractor for required design and approve them according to customer specification

Project Coordinator

OCK Setia Engineering Sdn Bhd
Puchong, Selangor D.E.
04.2010 - 06.2010

Main Task :

  • To coordinate and monitor implementations of CME and TI works by sub-contractors for Digi/Maxis 2G-3G New Swap Site at Greenfield Site, Sharing Site, In-Building Site, Rooftop Site and Portable Site for Huawei/Ericsson Equipment installations (RRU3804/BBU3900, RBS3306, RBS6000, Eltek TRM and APM cabinet) and MiniLink TN installations/intergration in respect to contract and customers requirements or SLA agreements.
  • To resolve CME and TI issues at site including QA
  • To managed,coordinate and to prepare proper training module in-house TI installation teams
  • Test and Commisioning of Huawei/Ericsson Equipment/Minilinkk TN installed.
  • To coordinate and monitor daily site progress, site acquisition, site access, material mobilisation and other related matter.
  • To resolve sites, materials, equipments and other related issues.
  • To prepare, update and monitor Daily,Weekly and Monthly Progress Report, Daily Progress Tracker and Safety & Health Daily Report etc.
  • To monitor, check and screen Site Acquisition, Site Survey Reports, Technical Proposals, Construction Drawings, As-Built Drawings etc.
  • To monitor and check Technical Drawings, Construction Drawings, As-built drawings, Site Implementations Documents etc.
  • To perform and advise with vendors on CME & RF Technical Site Survey.
  • To review CME & RF TSSR by vendors prior to clients review and approval
  • To resource materials/labour pricing, preparation of Bill of Quantity and Scope of Work/Specification accordingly to Huawei and Digi requirement.
  • To conduct and attend site acceptance/ final inspection, site audit and to prepare QA/QC reports.
  • To liase and attend meetings with Clients Representative, Local Authorities, Land/Buildings owners, Sub-contractors etc.

Regional Coordinator

Zain Communication (Ghana) Pvt. Ltd.
Accra, Ghana
01.2009 - 10.2009

Task and Key Duties

  • Perform acceptance according to the standard and quality of Celtel -Zain Ghana from CME & Telecom installations.
  • Responsible for auditing and providing complete report on all problematic Tower of Zain GSM sites and report it directly to the QA Manager and Project director of Zain.
  • Providing Celtel/ Zain Ghana a better and more safe GSM sites by raising all the issues with regards on the major problems of the Tower and TI installation.
  • Ensured that all sub-contractors are following the specs and correct rectification on those all problematic tower from their submitted solution from the tower designer up to their implementation.
  • Perform regional acceptance for CME & Ericsson equipment installation and testing.
  • Responsible for issuing PAT certificate after the vendor comply with the correct requirement and the Zain standard was been followed on site.
  • Manage of subcontractors and outsourcings related to civil works, electrical installation, GSM(BSS) and TX Network equipment installation of Ericsson according to roll out plan.
  • To conduct CME Technical Site Survey (TSS) with vendors and review Technical Site Survey Reports (TSSR) accordingly to approval.
  • Ensured that Zain CME, Ericsson BSS and TX Specification were been adopt and been followed by the contractors by communicating and visiting sites.

CME Coordinator

Ericsson (Malaysia) Sdn Bhd
Cyberjaya, Cyberjaya
10.2008 - 01.2009

Project : 2G-3G Swap Project for Maxis

Task and Key Duties

  • To coordinate and monitor Civil,Mechanical and Electrical (CME) works by sub-contractors for Maxis 3G New Site at Tower Site, Sharing Site, In-Building Site, Rooftop Site and Portable Site
  • With respect to contract and customers requirements.
  • To coordinate and monitor daily site progress, site acquisition, site access, material mobilisation and other related matter.
  • To prepare, update and extract Daily Progress Tracker through Site Handler/Material Handler.
  • To monitor & review CME Technical Site Survey Reports(TSSR),Technical Proposals (TP), Construction Drawings, As-Built Drawings etc. by ASP prior to clients approval.
  • To monitor and check Technical Drawings, Construction Drawings, As-built drawings etc.
  • To resource materials/labour pricing, preparation of Bill of Quantity and Scope of Work/Specification accordingly to Ericsson and Maxis requirement.
  • To conduct and attend site acceptance/ final inspection, site audit and to prepare QA/QC reports.
  • To liase and attend meetings with Clients Representative, Local Authorities, Land/Buildings owners, Sub-contractors etc.

QA & QC Engineer

LM Ericsson Bangladesh Limited
Dhaka, Bangladesh
07.2007 - 04.2008

Task and Key Duties

  • Ensured that all regional technical issues will be answered and according to Ericsson’s procedures with respect to contract and customers directives by having a meeting with the field supervisors and on line call.
  • Supporting and ensuring that the CW & TI supervisors and subcontractors of Ericsson follow the process of installation by providing some lessons with regards on the specs and Ericsson standard.
  • Managed and monitored progress control of the regional civil works implementation with the quality that client is looking all green field / Urban sites.
  • Responsible for all the technical issues with regards on CW & TI with the customer for the schedule.
  • Responsible for the progress of each site to deliver on the target date for on airing the site.
  • Ensured that all the punch list were escalated and gave mitigations and solutions.
  • Support and manage all construction works risks. Communicated risks to the Regional Manager Formulated action plans to reduce risks and their impact.

Project Coordinator

Downer-REI Sdn Bhd
Kuala Lumpur, Kuala Lumpur
05.2004 - 06.2007


Task & Key Duties.

  • To coordinate and monitor telecommunications CME/RFTI for DiGi and Maxis 3G/2G roll-out projects for Vacant Land, Tower Sharing, Roof Tops, and Room Renovations etc with respect to SLA agreements, contracts and customers requirements
  • To supervise and monitor construction of tower foundations and tower erection – 3 or 4 legged, minimast etc on greenfield/vacant land. To ensure proper methodology and quality requirement adhered strictly.
  • To coordinate/monitor teams of supervisors and sub-contractors and ensure all works / material as per specification, method statement/ approved material.
  • To conduct and perform Installation Engineering for RBS and Access Equipment including documentation.
  • To attend and conduct Technical Site Survey (TSS) – 2G/3G, preparation of Sketch, Survey Reports and Technical Proposal.
  • To coordinate and monitor installation of RBS and other equipments, Feeder Cable, Antennas, Microwave and other related works.
  • To liaise with local authorities such as, TNB, Town Councils, SBC’s etc.
  • To monitor and update Site Tracker (Site Handler)
  • Responsible for project delivery to customer with good quality of service, values and satisfaction.
  • To prepare Site Documentation such as Site Dairy, as-built BOQ, QA/QC, and Safety etc.
  • To conduct and prepare Site Safety Audit and ensure safety at site and QA/QC
  • To attend and conduct Site Acceptance/Final Acceptance /Site Commissioning

Architectural Supervisor

PATI Sdn. Bhd.(Subsidiary of UEM )
Putrajaya, Putrajaya
09.2001 - 05.2004

PROJECT SUPERVISED

  • PROPOSED CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT (LRT) INFRASTRUCTURE WORKS AND SOUTHERN BOULEVARD PACKAGE A, PRECINT 4 OF THE PUTRAJAYA CORE ISLAND DEVELOPMENT PACKAGE LRT-BLVD 104 (CONTRACT NO: 2Aa/COR/LRT/CGE2/CON/10N/0873)
  • PROPOSED CONSTRUCTION, COMPLETION AND MAINTENANCE OF D’CASSIA DEVELOPMENT (PHASE 1) CONSISTING OF 2 BLOCKS OF 10 STOREY (BLOCK A &B) AND 1 BLOCK 8 STOREY (BLOCK C) APARTMNETS WITH FACALITIES ON PART OF LOT 12182 IN CYBERJAYA FLAGSHIP ZONE.

Task & Key Duties.

  • To supervise and monitor all Architectural finishing and installation works at Southern Boulevard Precinct 4 such as tiling works, toilets, water features, features wall landscaping and other related works.
  • To monitor sub-contractors and ensure proper work methods adhered according to the specification given and keeping within specified time frame.
  • To conduct site meeting and inspection with consultants or clients.
  • To attend and resolve Non Compliance Report (NCR).
  • To liaise with other sub-coordinates such as C&S/M&E Supervisor to resolve interfacing problems arises at site or during coordinating period.
  • To assist Project Architect in preparing and reviewing documents such as Construction Drawings, Method Statements, As-built drawings, Shop Drawings, Technical Data Submission, Sample Board Submission and etc.
  • To assist Project Architect to prepare proposed detail drawings, as-built drawings or shop drawings for submission to consultants or clients using AutoCAD or manually.
  • To assist and prepare monthly reports and claims including joint inspection reports.
  • To liaise with local authorities such as, TNB, TMB and etc

Property Officer

SB Properties Sdn. Bhd.
Kuala Lumpur, Kuala Lumpur
08.1998 - 11.2001

Main Task :

  • To manage and supervise all SBB branch and properties in terms of upkeep of buildings, maintenance of M&E system and rental/surveying of buildings.
  • To review, negotiate and make recommendation on upgrading/renovations, rental of properties, and maintenance contract.
  • To prepare reports on SBB properties for management review on upgrading, renovation, purchase and rentals of properties or equipment/peripherals.
  • To attend and resolve complaints on building maintenance and defects.
  • To prepare or review claims and payment for approval.
  • To liaise with local authorities such as DBKL, TNB, TMB and etc.

Building Executive

NST Properties Sdn. Bhd.(Property & Building Management of New Straits Times Press)
Bangsar, Kuala Lumpur
02.1996 - 08.1998

Main Task :

  • To supervise and heading teams of electricians and handyman for daily maintenance & upkeep of company properties & program daily maintenance works as well
  • To supervise and coordinate internal/external contractors performing maintenance & repair works.
  • To design & supervise minor renovation such including arranging supply of office furniture and equipment.
  • To liaise and coordinate with in-house architect, interior designers & contractors for up-grading of office premises, buildings and etc. including coordinating events and conference.
  • To monitor & arrange maintenance and repair works for M&E equipment such as Lift System, Air-Conditioning System, Plumbing and etc.
  • To review and negotiate maintenance and renovation works contracts.
  • To liaise with local authorities such as DBKL, TNB, TMB and etc.

Site Supervisor

ASIA BARU CONSTRUCTION SDN. BHD.
Temerloh, Pahang
01.1993 - 11.1996

PROJECT : TASK & KEY DUTIES

  • Proposed Construction & Completion of Double Storey School Building of Sek. Ren. Keb. Kg. Tengah Temerloh, Pahang D.M. & Sek Ren. Keb. Bandar Mentakab, Mentakab, Pahang D.M. for Jabatan Kerja Raya Pahang.
  • Proposed Construction & Completion of Pipe laying & Reservoirs for Projek Bekalan Air Temerloh – Mentakab Phase 11 for Jabatan Bekalan Air Pahang.
  • To supervise and heading teams of sub-contractors & general workers.
  • To ensure proper work method according to the specification given and keeping within specified time frame set.
  • To supervise and monitor proper usage of machinery and other construction equipment.
  • To liaise with consultants, local authorities, member of public and etc.

Education

Primary School

Sekolah Rendah Kebangsaan Jalan Bahagia
Temerloh, Pahang D.M.
01.1979 - 12.1984

Secondary School

Sekolah Menengah Abu Bakar
Temerloh, Pahang D.M.
01.1985 - 12.1989

Architecture

Politeknik Sultan Hj Ahmad Shah (POLISAS)
Temerloh, Pahang D.M.
06.1990 - 12.1992

Skills

Excellent analytical and problem-solving skills

undefined

Software

AutoCad

Microsoft Office

Certification

Certified First Aider

Quote

Judge a man by his questions rather than his answers.
Voltaire

Reference

1. Satnam Singh A/L Ajit Singh

Authority & Public Relationship Director

ECRL Section 6

HSM912, PT173, Tapak ECRL Kampung

Mukim Luit, (KGLT A/10/22)

26500 Maran Pahang D.M.

E-mail – satnamsingh.s6@cccecrl.com

Contact no: +6017 224 3442

2. Mr Sam Basson

Group Technical Director

Eatons Towers

Western Cape, South Africa

e-mail – nossabas@yahoo.com

Tel : +233260400125

Timeline

TSSR Engineer

Elabram Sdn Bhd
03.2020 - 05.2021

Logistics Manager

AZRB Sdn Bhd
09.2018 - 04.2019

Implementation Manager

ZTE (Malaysia) Corporation Sdn Bhd
09.2016 - 09.2018

Implementation Manager

Huawei Technologies (Malaysia) Sdn Bhd
02.2015 - 09.2016

Audit Coordinator – Architectural, C&S and M&E

S.N. Akmida Sdn. Bhd
02.2014 - 02.2015

Senior Associate Consultant - Network Planning and

DIGI Telecommunications Sdn Bhd
09.2012 - 09.2013

Cell Site Technician

Sky Communication Pty. Ltd.
09.2011 - 04.2012

Technologist - NIC

U-Mobile Sdn Bhd
12.2010 - 08.2011

CME Coordinator

GTL Network Services (Malaysia) Sdn Bhd
06.2010 - 11.2010

Project Coordinator

OCK Setia Engineering Sdn Bhd
04.2010 - 06.2010

Regional Coordinator

Zain Communication (Ghana) Pvt. Ltd.
01.2009 - 10.2009

CME Coordinator

Ericsson (Malaysia) Sdn Bhd
10.2008 - 01.2009

QA & QC Engineer

LM Ericsson Bangladesh Limited
07.2007 - 04.2008

Project Coordinator

Downer-REI Sdn Bhd
05.2004 - 06.2007

Architectural Supervisor

PATI Sdn. Bhd.(Subsidiary of UEM )
09.2001 - 05.2004

Property Officer

SB Properties Sdn. Bhd.
08.1998 - 11.2001

Building Executive

NST Properties Sdn. Bhd.(Property & Building Management of New Straits Times Press)
02.1996 - 08.1998

Site Supervisor

ASIA BARU CONSTRUCTION SDN. BHD.
01.1993 - 11.1996

Architecture

Politeknik Sultan Hj Ahmad Shah (POLISAS)
06.1990 - 12.1992

Secondary School

Sekolah Menengah Abu Bakar
01.1985 - 12.1989

Primary School

Sekolah Rendah Kebangsaan Jalan Bahagia
01.1979 - 12.1984
Muzammil Aiman Bin Abdullah BahadurTelecomunications