Practical and hands-on Senior Field/Project Engineer adept at successfully and effectively interacting with contractors across multiple construction sites. Excellent project management abilities demonstrated by career history of completed projects. Particular experience in oil & gas and wind energy projects.
Overview
2
2
Languages
2
2
Certifications
6
6
years of post-secondary education
13
13
years of professional experience
Work History
Senior Field Engineer
Sapura Offshore Sdn Bhd (Subsidiary of Sapura Energy Berhad)
The Mines Seri Kembangan, Selangor
06.2019 - Current
Interacted effectively with site engineering team and field staff to coordinate work that complied with design and construction documents.
Hired and supervised subcontractors to improve production and meet critical deadlines.
Confirmed that construction progressed as scheduled and in compliance with contract specifications.
Monitored construction methods and installations, inspection and testing processes.
Served as liaison between site engineering team and field to coordinate work in accordance with design and construction documents.
Observed construction methods and installations, inspection and testing processes to maintain consistent progress.
Coached junior field engineers.
Prepare and submit Project Execution Plan, Project Schedule, Project Manpower Loading, Project Material Take Off and Project Equipment and Machineries List, Work Pack, Work Procedures, Method Statements, Technical Query and Site Technical Query for management and client approval prior/during project execution.
Involved with Procurement & Subcontracting stage - prepare material specification/scope of work for ITB compilation, prepare Technical Bid Evaluation and prepare Technical Clarification during tendering process.
Plan, manage, supervise and execute fabrication, construction & installation activities in line with the approved schedule and procedures.
Interface, liaise, coordinate and organize with client, construction team and subcontractors during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and project specifications and standards.
Projects involved: MARCH 2019 – PRESENT: TRANSPORT & INSTALLATION OF OFFSHORE WIND TURBINE SUBSTRUCTURE FOR YUNLIN OFFSHORE WIND FARM, YUNLIN, TAIWAN
Project Type: T&I – Offshore Wind Farm
Client: YUNNENG WIND POWER CO. LTD. subsidiaries of WPD OFFSHORE GmBh.
• Transport & Installation of 80 Monopiles Substructure (8m in diameter) by using Sapura 3500 as the main work vessel.
• Main installation equipment and machineries: Monopile Gripper (MPG), Upending Hinge (UEH) Barge, IHC Upending Tool (UET) 2025MT WLL, IHC S2000 Hammer, Hydro Sound Damping (HSD) Box & Net, Double Big Bubble Curtain (DBBC) and 2000MT SWL Spreader Bar.
SEPT 2019 – MARCH 2019: TRANSPORTATION & INSTALLATION OF PIPELINE AT PARGO CLUSTER FIELD – CARAPEBA NEW EXPORT LINE, BRAZIL
Project Type: T&I
Client: PERENCO PETROLE E GAS DO BRASIL
• 16” Dia. x 9.566km PPG-1A to PCP-2 Pipeline
• Riser Stalk-On Installation at PPG-1A & PCP-2 Platform
• Riser Clamp Installation
• Mattress Installation
JUNE 2019 – AUGUST 2019: GULF OF SUEZ (GOS) PIPELINE PROGRAM PROJECT, EGYPT
Project Type: T&I
Client: GULF OF SUEZ PETROLEUM COMPANY (GUPCO), EGYPT
• 20” Dia. x 9.20km M-36B to MWF Pipeline
• Mattress Installation
• October Platform Flare Tip Replacement
Senior Field Engineer
Dialog Energy Sdn Bhd
Mutiara Damansara, Selangor, Malaysia
01.2019 - 05.2019
Prepare and submit Project Execution Plan, Project Schedule, Project Manpower Loading, Project Material Take Off and Project Equipment and Machineries List, Work Pack, Work Procedures, Method Statements, Technical Query and Site Technical Query for management and client approval prior/during project execution.
Involved with Procurement & Subcontracting stage - prepare material specification/scope of work for ITB compilation, prepare Technical Bid Evaluation and prepare Technical Clarification during tendering process.
Plan, manage, supervise and execute fabrication, construction & installation activities in line with approved schedule and procedures.
Interface, liaise, coordinate and organize with client, construction team and subcontractors during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and project specifications and standards.
Projects involved:
2019: PROVISION OF EPCIC FOR BAYAN REDEVELOPMENT PROJECT PHASE 2B & 2C, SARAWAK, MALAYSIA
Project Type: EPCIC
Client: HALLIBURTON BAYAN PETROLEUM (HBP), KUALA LUMPUR, MALAYSIA
• New Deck Extension for BYDP-D
• SIPROD Preparation for BYDP-B, BDYP-C & BYDP-D
Field/Project Engineer
Anticorrosion Protective Systems (M)
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
08.2018 - 01.2019
Prepare and submit Project Execution Plan, Project Schedule, Project Manpower Loading, Project Material Take Off and Project Equipment and Machineries List, Work Pack, Work Procedures, Method Statements, Technical Query and Site Technical Query for management and client approval prior/during project execution.
Involved with Procurement & Subcontracting stage - prepare material specification/scope of work for ITB compilation, prepare Technical Bid Evaluation and prepare Technical Clarification during tendering process.
Plan, manage, supervise and execute fabrication, construction & installation activities in line with approved schedule and procedures.
Interface, liaise, coordinate and organize with CSR, SKO Operation Team, APS construction team and subcontractors during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and project specifications and standards.
Projects involved: 2018: EPCIC FOR PROVISION FOR PIPELINE REHABILITATION WITH IN-FIELD LINING (IFL) TECHNOLOGY FOR PETRONAS CARIGALI SDN BHD. – SK-OIL
Project Type: EPCIC
Client: PETRONAS CARIGALI SDN BHD – SK-OIL, MIRI, SARAWAK, MALAYSIA
• Tukau PL 192 Damaged IFL Extraction Works (2018)
• Temana PL 324 – 6” IFL Installation Works (2018)
• Tukau PL 192 Chemical Injection Skid Refurbishment and Topside Piping Removal (2018)
• Bayan PL 272 IFL Inspection Works (2018)
• Bayan PL 272 IFL Extraction Works and Subsea Pipeline Sectional Replacement. (2018)
Senior Project Engineer
Subsurf Sdn Bhd
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
11.2017 - 07.2018
Acting as Project Manager - Manage end to end process for Price Agreement for Single Point Moorings and Underwater Maintenance Project. Client: MISC Maritime Services & MRCSB Sdn Bhd.
Prepare budgetary and P&L for project.
Managing procurement and subcontracting of equipment, material and services for project
Plan, manage, supervise and execute project in line with approved schedule and procedures.
Interface, liaise, coordinate and organize with CSR and Client’s Operation Team, Air Diving Team, Construction team and subcontractors during project execution.
Ensure all work is comply with quality and safety requirement as stipulated in contract, procedures and specifications.
Projects involved: 2017-2018: THE PRICE AGREEMENT FOR SINGLE POINT MOORINGS AND UNDERWATER MAINTENANCE PROJECT
Project Type: Maintenance Project
Client: MISC MARITIME SERVICE (MMS) SDN BHD & MRCSB SDN BHD, SG UDANG, MALACCA, MALAYSIA
• Floating Hose Onshore Inspection (FHOI) 2018 – completed one day ahead of schedule
• SBM & PLEM Bi-Yearly Inspection (2017)
• SBM & PLEM Quarterly Inspection (2018)
• Mooring Hawser Change Out (2018)
• Pre-Berthing Inspection and Berthing Operation (Continuous Operation)
• UWILD for SBM (2018)
Field/Project Engineer
Anticorrosion Protective Systems (M)
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
04.2016 - 10.2017
Assist Project Manager for all related scope of works.
Prepare and submit Project Execution Plan, Project Schedule, Project Manpower Loading, Project Material Take Off and Project Equipment and Machineries List, Work Pack, Work Procedures, Method Statements, Technical Query and Site Technical Query for management and client approval prior/during project execution.
Involved with Procurement & Subcontracting stage - prepare material specification/scope of work for ITB compilation, prepare Technical Bid Evaluation and prepare Technical Clarification during tendering process.
Plan, manage, supervise and execute fabrication, construction & installation activities in line with approved schedule and procedures.
Ensure all work is comply with quality and safety requirement as stipulated in contract, procedures and specifications.
Interface, liaise, coordinate and organize with CSR, SKO Operation Team, APS construction team and subcontractors (i.e. Pre-commissioning, Habitat, Cold Cutting, Bolt Torqueing, FJC and etc.) during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and project specifications and standards.
Projects involved: 2016-2017: EPCIC FOR PROVISION FOR PIPELINE REHABILITATION WITH IN-FIELD LINING (IFL) TECHNOLOGY FOR PETRONAS CARIGALI SDN BHD. – SK-OIL
Project Type: EPCIC
Client: PETRONAS CARIGALI SDN BHD – SK-OIL, MIRI, SARAWAK, MALAYSIA
• Baram, PL 14 – New IFL Detailed Engineering Design (2017)
• Baronia PL 26 – New IFL Detailed Engineering Design (2017)
• Bokor PL 63 – New IFL Detailed Engineering Design (2017)
• Tukau PL 192 – 10” IFL Installation Works (2016)
• Bayan PL 272 – 8” IFL Installation Works (2016)
• Baram PL 323 – 10” IFL Installation Works (2016)
Field Engineer
GOM Resources Sdn Bhd (fka GLOBAL OFFSHORE MALAYSIA)
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
02.2013 - 01.2016
Manage end to end process of installation projects, from development detail, offshore installation procedures (e.g. pipeline shore approach, pipeline trenching, installation of subsea pipelines (S-Lay)/spools, cables/umbilicals, risers, PLTS etc.)
Prepare Project Execution Plan, Project Scope of Work, Project Schedule, Project Manpower Loading, Project Material Take Off and Project Equipment and Machineries List.
Prepare Work Pack, Installation Procedures & Method Statements for client approval prior project execution.
Prepare rigging calculation & configuration for heavy lifting activities i.e. Linepipe, Riser, Tie-in Spool, J-Tube, Riser Clamps and etc.
Prepare and submit Technical Query and Site Technical Query for client approval prior/during project execution.
Involved with Procurement & Subcontracting stage - prepare material specification/scope of work for ITB compilation, prepare Technical Bid Evaluation and prepare Technical Clarification during tendering process.
Attend marine vessel inspection together with Petronas Maritime Surveyor.
Plan, manage, supervise loadout and sea-fastening activities for vessel mobilization to site.
Plan, manage, supervise and execute fabrication, construction & installation activities in line with approved schedule and procedures.
Prepare Daily Progress Report during project execution.
Interface, liaise and coordinate with CSR and Client’s Operation Team at site prior/during project execution.
On board pipelay barge DLB 264/installation vessels and provide technical support during installation operation.
Interface, coordinate and organize with installation team and subcontractors (i.e. AWS, FJC, ROV, SAT/AIR Divers, and etc.) during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and in compliance with project specifications and standards.
Conduct daily/weekly progress/interfacing meeting with client and subcontractors.
Ensure all documents (i.e. drawings, specifications, test reports, completion reports and etc.) are available for verification throughout execution of project.
Ensure all work is comply with quality and safety requirement as stipulated in contract, procedures and specifications.
Assist documentation team for Final Documentation compilation.
Projects involved: 2015: GOM RESOURCES INTERNAL WORKS
• Bidding Works for Provision of Pipelines & SSIV Systems Tie-In & Pre-Comm Services for North Malay Basin - HESS
• Bidding Works for Guntong EOR Pipeline Installation Project (12” X 12km) - EXXON
• Bidding Works for Provision of Offshore T&I Activities for F12 Wellhead Platform (WHP) –MMHE
• Provision for Fabrication of Stinger for DLB 264 vessel 2015: TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR PETRONAS CARIGALI, MALAYSIA
Project Type: T&I
Client: PETRONAS CARIGALI SDN BHD, MALAYSIA
• ENERGY Pipeline Pre-Commissioning Works Phase 2 2014: TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR PETRONAS CARIGALI, MALAYSIA
• ENERGY Pipeline Pre-Commissioning Works
• Fabrication & Installation of 28” & 24” Subsea Tie-In Spool for ENERGY Pipeline
• Installation of 28’ x 282km Pipeline EVA-NMB Gas Delivery System (ENGDS) Project 2013: TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR PETRONAS CARIGALI, MALAYSIA
Project Type: T&I
Client: PETRONAS CARIGALI SDN BHD, MALAYSIA
• 28’ Pipeline EVA-NMB Gas Delivery System Shore Approach Project
• Kinabalu Pipelines Pre-Commissioning Works Phase 2
• Tukau Pipeline Replacement Project
Field/Project Engineer
Stonehouse Construction
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia
10.2011 - 01.2013
Seconded to Maser Marine Engineering Sdn Bhd.
Supervise and monitor 33kV subsea cable recoiling and spooling onto Cable Lay Barge – Labroy 156
On board Pipelay Barge Arwana Satu during offshore installation for S-Lay subsea pipeline installation and provide technical support.
Assists Construction Manager to plan & supervise modification of Crane Barge Catermas 9 for riser and subsea tie-in spool installation and pipeline post trenching operation.
To supervise and provide technical support during shore approach, pipelay start up, pipelay operation, riser installation, riser clamps installation, tie-in spool installation and J-tube installation.
Prepare Daily Progress Report during project execution.
Interface, liaise and coordinate with CSR and Client’s Operation Team at site prior/during project execution.
Interface, coordinate and organize with installation team and subcontractors (i.e. AWS, FJC, ROV, SAT/AIR Divers, etc.) during project execution ensuring scope of work is achieved in accordance with contract requirements, time frame and in compliance with project specifications and standards.
Projects involved: 2011-2013: 30” SUBSEA PIPELINE & 33KV SUBSEA CABLE INSTALLATION, TESTING & PRE-COMMISSIONING FOR EPCIC ALLIANCE FOR THE LNG REGASIFICATION UNIT, ISLAND BERTH SUBSEA PIPELINE-SG UDANG MELACCA, MALAYSIA
Project Type: T&I
Client: PETRONAS GAS BERHAD (PGB) & RANHILL WORLEY PARSON (RWP)
• 30” Pipeline Shore Approach and Pipelay
• 30” Onshore Pipeline & Beach Valve Installation
• 30” Subsea Tie-In Spool Installation
• 30” Riser Installation
• 30” Pipeline Pre-commissioning
QAQC Engineer - Source Inspection
Sime Darby Engineering
Pasir Gudang, Johore, Malaysia
10.2010 - 09.2011
To be responsible as QAQC SDE representative to project assigned.
Responsible for Source Inspection of mechanical, piping, E&I and structural equipment. Inspection based on applicable standard such as ASME, API, ASTM, IEC, ISO, British Standard, European Standard etc.
To review QA/QC procedures and documents such as inspection test plan, vendor data master list, production schedule, test procedures, installation operation manual and vendor final documentation for source inspection packages.
Civil & Structural Engineer
Sime Engineering Sdn Bhd
Pasir Gudang, Johore, Malaysia
03.2008 - 09.2010
Responsible for coordination, implementation, execution, control & completion of civil & structural activities (i.e. reinforced concrete structure and etc.) ensuring compliance with requirements of contract and PETRONAS Technical Standard (PTS).
Coordination with consultants, clients, suppliers, vendors and subcontractors at site for engineering related activities. Assist in technical design review ensuring compliance with requirements of contract.
Site Engineer (Civil & Structural)
Malaysia Marine & Heavy Engineering (MMHE) Sdn Bhd
Pasir Gudang, Johore, Malaysia
05.2007 - 02.2008
Perform technical, organizational, and supervisory role in works such as erection of steel structures, construction of reinforced concrete structure and road pavement, and installation of various type of piling system i.e. Bore pile, spun pile etc.
Supervise, inspect and ensure all works done by contractors are comply with quality and safety requirement as stipulated in contract, procedures and specifications.
Education
Bachelor of Engineering - Civil Engineering
University Technology Malaysia (UTM)
Johore, Malaysia
06.2002 - 03.2008
Skills
Standards and compliance
undefined
Certification
Project Management Professional (PMP) Preparation Course Training
Timeline
Senior Field Engineer
Sapura Offshore Sdn Bhd (Subsidiary of Sapura Energy Berhad)
06.2019 - Current
Senior Field Engineer
Dialog Energy Sdn Bhd
01.2019 - 05.2019
Project Management Professional (PMP) Preparation Course Training
11-2018
Field/Project Engineer
Anticorrosion Protective Systems (M)
08.2018 - 01.2019
Senior Project Engineer
Subsurf Sdn Bhd
11.2017 - 07.2018
Field/Project Engineer
Anticorrosion Protective Systems (M)
04.2016 - 10.2017
Field Engineer
GOM Resources Sdn Bhd (fka GLOBAL OFFSHORE MALAYSIA)
02.2013 - 01.2016
Field/Project Engineer
Stonehouse Construction
10.2011 - 01.2013
QAQC Engineer - Source Inspection
Sime Darby Engineering
10.2010 - 09.2011
Certified Graduate Engineer, Board of Engineers, Malaysia (63908A)
02-2010
Civil & Structural Engineer
Sime Engineering Sdn Bhd
03.2008 - 09.2010
Site Engineer (Civil & Structural)
Malaysia Marine & Heavy Engineering (MMHE) Sdn Bhd
05.2007 - 02.2008
Bachelor of Engineering - Civil Engineering
University Technology Malaysia (UTM)
06.2002 - 03.2008
Similar Profiles
MUHD AIZAT BIN MOHD NAJIBMUHD AIZAT BIN MOHD NAJIB
Senior Project/Field Engineer at SKYBORN RENEWABLES GmbH (fka as wpd offshore GmbH)Senior Project/Field Engineer at SKYBORN RENEWABLES GmbH (fka as wpd offshore GmbH)