Summary
Overview
Work History
Education
Skills
Certification
Custom Section
References
Languages
Timeline
Generic
MUHAMMAD MAWARDI BIN MOHAMAD JOHARI

MUHAMMAD MAWARDI BIN MOHAMAD JOHARI

SELANGOR

Summary

Enhance the knowledge’s and improve quality of my work in the new challenging area. Always provided the good services quality to client, by operated the area of operating and inspection area. A team members play with cooperation and always find an effective management, analytical and problem solving skill develop through dedication, hard work, passion.

Overview

2
2
Languages
1
1
Certification
9
9
years of professional experience

Work History

INTERNATIONAL PETROLEUM CORPORATION
10.2025 - 10.2025
  • DESCRIPTION: MONITORING PHASED ARRAY ULTRASONIC & C SCAN INSPECTION
  • PROJECT : Provision of Pressures & Heat Exchanger Inspection, Maintenance & repair for IPC Malaysia

PETRONAS CARI GALI SDN BHD
08.2025 - 09.2025
  • DESCRIPTION: C SCAN INSPECTION FOR TANK 3 OF CRUDE OIL TERIMNAL. Scope of work on bottom plate & annular plate. Verify MFL finding by measured depth thickness.
  • PROJECT : BINTULU INTEGRATED FACILITY (BIF)

PETRONAS
05.2025 - 09.2025
  • DESCRIPTION: J868 PROVISION OF PROCUREMENT CONSTRUCTION AND COMMISSIONING FOR THE MAIN CRYOGENIC HEAT EXCHANGER (MCHE) REPLACEMENT WORK AT MODULE 4, MLNG DUA, PETRONAS LNG COMPLEX.
  • PROJECT : MALAYSIA LNG

PETROVIETNAM DRILLING
04.2025 - 04.2025
  • DESCRIPTION: PHASED ARRAY ULTRASONIC & MAGNETIC PENETRANT TESTING change out of 3’ & 5’ Bleep Valve on Mud Pump 3 PVD III on Mud Pump Room
  • PROJECT : PVD III LABUAN

VELESTO
01.2025 - 01.2025
  • DESCRIPTION: PHASED ARRAY ULTRASONIC & LAMINATION USED ABSEILING WITH LEVEL 3 Slew bolt crack on 3 different crane on Top site
  • PROJECT : NAGA 3

PETRONAS CARIGALI SDN BHD
11.2024 - 12.2024
  • DESCRIPTION: PHASED ARRAY ULTRASONIC & LAMINATION USED ABSEILING WITH LEVEL 3 SUPERVISED TO CHECK PREFERENTIAL WELD CORROSION
  • PROJECT : TERENGGANU CRUDE OIL TERMINAL

HIBISCUS PETROLEUM (LABUAN CRUDE OIL TERMINAL)
10.2024 - 10.2024
  • DESCRIPTION: C SCAN Monitoring for Remaining wall thickness on pipe has been
  • PROJECT : C-SCAN PERFORM ON SCHDULE PIPELINE

PETRONAS CARI GALI TERMINAL CRUDE OIL PAKA
05.2024 - 09.2024
  • DESCRIPTION: PHASED ARRAY ULTRASONIC Monitoring for Preferential weld corrosion(PWC) on pipe
  • PROJECT : PAUT PWC ON PIPE

PETRONAS CHEMICAL FERTILISER KEDAH
02.2024 - 02.2024
  • DESCRIPTION: PHASED ARRAY ULTRASONIC Monitoring and new pipe installation
  • PROJECT : RSD 2024

PETRONAS CARIGALI SDN BHD
10.2023 - 10.2023
  • DESCRIPTION: PHASED ARRAY ULTRASONIC & LAMINATION USED ABSEILING WITH LEVEL 3 SUPERVISED
  • PROJECT : TERENGGANU CRUDE OIL TERMINAL

INTERNATIONAL PETROLEUM CORPORATION
06.2023 - 06.2023
  • DESCRIPTION: MONITORING PHASED ARRAY ULTRASONIC
  • PROJECT : Provision of Pressures & Heat Exchanger Inspection, Maintenance & repair for IPC Malaysia

ARAMCO ROWAND OIL (ARO)
06.2023 - 06.2023
  • DESCRIPTION:
  • PHASED ARRAY ULTRASONIC WITH ROPE ACCESS IRATA. ON THE CRANE PCM 120.
  • PROJECT : RIG ARO 2001 CRANE

MSM SUGAR REFINERY SDN BHD
05.2022 - 08.2022
  • DESCRIPTION
  • PHASED ARRAY ULTRASONIC (AUBT), TIME FLIGHT DIFFRACTION, TFM, and HTHA on pressure vessel. With requirement standard refer to procedure for high temperature hydrogen attack.
  • PROJECT : #UNIT 2 BPVC

ARAMCO ROWAND OIL (ARO)
06.2022 - 07.2022
  • DESCRIPTION:
  • PHASED ARRAY ULTRASONIC WITH ROPE ACCESS IRATA. ON THE CRANE PCM 220. CHECK THE PIN INTEGRITY FOR ANY SUSPECTED CRACK. WITH THICKNESS 500 ABOVE. BASED CLIENT SPECICIFICATION ACCEPTANCE
  • PROJECT : RIG 56 CRANE

EXXON MOBIL
03.2022 - 03.2022
  • DESCRIPTION: PHASED ARRAY ULTRASONIC (AUBT), TOTAL FOSUCING METHOD on pressure vessel test separator nozzle. With requirement standard refer ASME SEC VIII Division 2. For finding crack on nozzle forged neck.
  • PROJECT :TOP SIDE OIL SEPARATION VESSEL

MALAKOFF CORPORATION SDN BHD
01.2022 - 01.2022
  • DESCRIPTION:
  • PHASED ARRAY ULTRASONIC C-SCAN ON Pulverized Fuel (PF) Burner Outer Sleeve Unit #20.
  • PROJECT : #20 SHUTDOWN

OIL & GAS NATURAL GAS CORPORATION LTD INDIA
10.2020 - 10.2020
  • DESCRIPTION:
  • PHASED ARRAY ULTRASONIC THICKNESS 60~120mm THICKNESS. DOUBLE V WELDMENT on CARBON STEEL MATERIAL. ACCEPTANCE CRITERIA BASED ON API RP 2X TYPE C.
  • Prepared validation & calibration setup based on thickness required
  • PROJECT :KG-DWN 98/2 MAIN PILE MAKE-UP CPP JACKET (MAIN PILE)

GAS PROCESSING PLANT COMPLEX B SANTONG
08.2020 - 09.2020
  • DESCRIPTION
  • PHASED ARRAY ULTRASONIC ON SMALL BORE FOR EXISTING & NEW PIPE ELBOW. LOW THICKNESS ON STANILESS STEEL & CARBON STEEL MATERIAL.
  • PROJECT :ALEXIS GPP 5&6

GS PAPERBOARD & PACKAGING SDN BHD
07.2020 - 09.2020
  • DESCRIPTION:
  • PHASED ARRAY ULTRASONIC ON 10” X 10 Diameter thickness for Cogeneration system pipeline.
  • PROJECT : EXTERNAL GAS LINE FOR PM3 COGEN PROJECT

TNB JANAELEKTRIK SULTAN AZLAN SHAH
04.2020 - 06.2020
  • DESCRIPTION: - PERFORM UTTM ON UPV, BOILER, PIPING, DRUM, WATER WALL, SEPARATOR, PENT HOUSE - MPI FLUROSCENT IN
  • PROJECT :THICKNESS MONITORING (MAJOR TURNAROUND

SKF BEARING (M) SDN BHD
03.2020 - 03.2020
  • DESCRIPTION: -PERFORM EDDY CURRENT SURFACE OPERATOR AND DATA COLLECTOR ON BEARING & SOCKET for HEAVY MACHINERY.
  • PROJECT : SURFACE CRACK BY EDDY CURRENT SURFACE

HYUNDAI PTE LTD
10.2018 - 10.2018
  • DESCRIPTION: LOCATE CORROSION WALL THICKNESS & FINDING PITTING ON UNDERGROUND TANKS & PIPING BY USING INFRARED THERMOGRAPHIC
  • PROJECT: CRAVEN ROCK ,HYUNDAI

EXXON MOBILE SINGAPORE
09.2018 - 09.2018
  • DESCRIPTION: PERFORM PHASED ARRAY ULTRASONIC doing inspection on long seam on elbow. Calibration and validation by Exxon (Scanner Technician )
  • PROJECT: DUPLEX ELBOW STAINLESS STEEL (SHUTDOWN

HENGYUAN REFINING COMPANY PORT DICKSON
08.2018 - 08.2018
  • DESCRIPTION: PERFORM PHASED ARRAY ULTRASONIC TESTING OPERATOR -IN SERVICE for HEAT EXCHANGER EQUIPMENT & SRBI PIPING. INSPECT OF ROOT WALL LOSS & REMAINING WALL LOSS 2”INCH-16”INCH PIPE-24”INCH BPVC
  • PROJECT : DESIGN & ENGINEERING PROJECT EURO 5 (G)

LOTTE CHEMICAL TITAN SDN BHD
03.2018 - 04.2018
  • DESCRIPTION: PERFORM PHASED ARRAY ULTASONIC
  • Doing inspection and scanning from 2”- 18” inch pipe
  • PROJECT: SHUTDOWN PE-3 & KCOT PROJECT

KAPAR ENERGY VENTURE
02.2018 - 02.2018
  • DESCRIPTION: PERFORM PHASED ARRAY ULTRASONIC
  • CROSSCHEKING TUBE ON EXISTING & NEW JOINT (OPERATOR & INTERPRETER DATA ANALYSIS)
  • PROJECT: CROSSCHECKER FOR SHUTDOWN

SHELL BUKOM, SINGAPORE
Bukom
01.2018 - 01.2018
  • DESCRIPTION: PHASED ARRAY ULTRASONIC & MULTITECH
  • VALIDATION & CALIBRATION BASED ON CODE &STANDART
  • ASME SEC VIII, API 653, ACCEPTANCE ASME SEC VIII
  • PROJECT : BUKOM CRUDE OIL TANKS (BCOT)

HYUNDAI PTE LTD
10.2017 - 10.2017
  • DESCRIPTION: LOCATE CORROSION WALL THICKNESS & FINDING PITTING ON UNDERGROUND TANKS & PIPING BY USING INFRARED THERMOGRAPHIC
  • PROJECT: CRAVEN ROCK ,HYUNDAI

LOTTE CHEMICAL TITAN SDN BHD
03.2017 - 04.2017
  • DESCRIPTION: PERFORM PHASED ARRAY ULTASONIC
  • Doing inspection and scanning from 2”- 18” inch pipe
  • PROJECT: SHUTDOWN PE-3 & KCOT PROJECT

KAPAR ENERGY VENTURE
02.2017 - 02.2017
  • DESCRIPTION: PERFORM PHASED ARRAY ULTRASONIC
  • CROSSCHEKING TUBE ON EXISTING & NEW JOINT (OPERATOR & INTERPRETER DATA ANALYSIS)
  • PROJECT: CROSSCHECKER FOR SHUTDOWN

MULTITECH CUM ASSIT

EXXON MOBILE SINGAPORE
JURONG YARD, SINGAPORE
09.2016 - 09.2016
  • Achieved service time and quality targets.
  • Demonstrated consistent hard work and dedication to achieve results and improve operations.

Education

DIPLOMA IN AUTOMATED SYSTEMS AND MAINTENANCE TECHNOLOGY - MECHATRONIC

UNIVERSITY KUALA LUMPUR
BANGI SELANGOR
01.2011

Skills

  • MS Word
  • MS Excel
  • Drawing
  • Team Work
  • Communication
  • Management
  • Risk assessment
  • Inspection reporting
  • Client coordination
  • Quality control
  • Calm under pressure

Certification

  • ULTRASONIC TESTING (3.1, 3.2) LEVEL II PCN, LEVEL II
  • PHASED ARRAY ULTRASONIC TESTING LEVEL II CSWIP, LEVEL II
  • MAGNETIC PARTICLE ASNT LEVEL II, LEVEL II
  • DYE PENETRATE ASNT LEVEL II, LEVEL II
  • RATA LEVEL I, LEVEL I
  • BOSEIT, 2027-05-16
  • H2S, 2025-07-10
  • MEDICAL OFFSHORE, 2025-05-11
  • OGSP EXP, 2026-06-07
  • AESP EXP, 2025-11-24
  • CIDB EXP, 2024-10-10
  • NTSP EXP

Custom Section

Enhance the knowledge’s and improve quality of my work in the new challenging area. Always provided the good services quality to client, by operated the area of operating and inspection area. A team members play with cooperation and always find an effective management, analytical and problem solving skill develop through dedication, hard work, passion.

Languages

English
Advanced
C1
Arabic
Beginner
A1

Timeline

INTERNATIONAL PETROLEUM CORPORATION
10.2025 - 10.2025

PETRONAS CARI GALI SDN BHD
08.2025 - 09.2025

PETRONAS
05.2025 - 09.2025

PETROVIETNAM DRILLING
04.2025 - 04.2025

VELESTO
01.2025 - 01.2025

PETRONAS CARIGALI SDN BHD
11.2024 - 12.2024

HIBISCUS PETROLEUM (LABUAN CRUDE OIL TERMINAL)
10.2024 - 10.2024

PETRONAS CARI GALI TERMINAL CRUDE OIL PAKA
05.2024 - 09.2024

PETRONAS CHEMICAL FERTILISER KEDAH
02.2024 - 02.2024

PETRONAS CARIGALI SDN BHD
10.2023 - 10.2023

INTERNATIONAL PETROLEUM CORPORATION
06.2023 - 06.2023

ARAMCO ROWAND OIL (ARO)
06.2023 - 06.2023

ARAMCO ROWAND OIL (ARO)
06.2022 - 07.2022

MSM SUGAR REFINERY SDN BHD
05.2022 - 08.2022

EXXON MOBIL
03.2022 - 03.2022

MALAKOFF CORPORATION SDN BHD
01.2022 - 01.2022

OIL & GAS NATURAL GAS CORPORATION LTD INDIA
10.2020 - 10.2020

GAS PROCESSING PLANT COMPLEX B SANTONG
08.2020 - 09.2020

GS PAPERBOARD & PACKAGING SDN BHD
07.2020 - 09.2020

TNB JANAELEKTRIK SULTAN AZLAN SHAH
04.2020 - 06.2020

SKF BEARING (M) SDN BHD
03.2020 - 03.2020

HYUNDAI PTE LTD
10.2018 - 10.2018

EXXON MOBILE SINGAPORE
09.2018 - 09.2018

HENGYUAN REFINING COMPANY PORT DICKSON
08.2018 - 08.2018

LOTTE CHEMICAL TITAN SDN BHD
03.2018 - 04.2018

KAPAR ENERGY VENTURE
02.2018 - 02.2018

SHELL BUKOM, SINGAPORE
01.2018 - 01.2018

HYUNDAI PTE LTD
10.2017 - 10.2017

LOTTE CHEMICAL TITAN SDN BHD
03.2017 - 04.2017

KAPAR ENERGY VENTURE
02.2017 - 02.2017

MULTITECH CUM ASSIT

EXXON MOBILE SINGAPORE
09.2016 - 09.2016

DIPLOMA IN AUTOMATED SYSTEMS AND MAINTENANCE TECHNOLOGY - MECHATRONIC

UNIVERSITY KUALA LUMPUR
MUHAMMAD MAWARDI BIN MOHAMAD JOHARI