Microsoft Office
Results-oriented Senior Project Engineer with 14 years of experience designing and implementing mission critical projects. Successful in determining project scope, creating project parameters, review technical drawings to meet construction objectives and building project deadlines that lead to on-time completion. Proficient communicator in working with teammates to solve problems that arise during implementation.
Data Center
undefinedMicrosoft Office
Microsoft Project
AutoCAD
BIM
Autodesk Construction Cloud
2024 - Project Mercury Data Center for Yu Ao Sdn Bhd Design and Build CSA and MEP for 120 MW Data Center.
2023 - Bridge Data Center - MY06 Project Design & Build M&E Contract for 93MW IT Power Outfit.
2022 - Microsoft Data Center - KUL03 Supply, Delivery and Installation of HVAC Wet System.
2021 - Supply of Precast Beam for YTL Warehouse, Klang.
2020 - Design and Build for Administrative Building of Malaysia Embassy in Moscow, Russia.
2018 - Petronas RAPID - Package 14 - UIO Units - Engineering, Procurement, Construction & Commissioning (EPCC) Of Main Control Buildings and Laboratory Buildings.
2017 - Design & Engineering in Replacement of Wastewater Piping at CJ Bio Malaysia.
2017 - Design & Engineering in Replacement of 11 Units Scrubber Chemical Piping for Scrubber at CJ Bio Malaysia.
2017 - LCOT Effluent Discharge Pipeline Replacement for SHELL - Provision of HDPE Pipes & Fittings.
2017 - Installation, Testing & Commissioning of DN200 HDPE Pipe Networks for Kapar Energy Ventures at Selangor.
2017 - Installation, Testing & Commissioning of DN500 GRP Pipe for Underground Raw Water Transfer for Jimah East Power at Negeri Sembilan.
2016 - Lamination Works of GRP Pipe & Fittings for AKSB at Merbau Chondong, Kelantan.
2016 - Conduct training of Lamination Jointing (Butt & Wrap) for GRP Pipe.
2015 - Replacement and Maintenance of GRE Pipe for Sabah Shell Petroleum Company at St. Joseph Offshore Platform, Sabah.
2015 - Installation, Testing & Commissioning of DN1100 GRP Pipe for Sewerage Force Main for Puncak Niaga at Sg Bunus, KL.
2014 - Installation, Testing & Commissioning of DN1100 GRP for Raw Water Transfer for Air Kelantan S/B at Kelantan.
2014 - Change Out of Helideck Firewater Piping to GRE for Sarawak Shell Berhad at M1 Offshore Platform, Sarawak.
2013 - Design & Engineering in Replacement of Hypochlorination Dosing Pump Discharge Line to GRE for Sabah Shell Petroleum Company at Barton Offshore Platform, Sabah.
2013 - Provide Technical Support for Replacement Of Underground Carbon Steel Firewater Piping to GRP/GRE Pipes at GPP2 & GPP4, Petronas.
2013 - Installation, Testing & Commissioning of DN400 GRP for Raw Water Transfer for JKR KESEDAR at Kelantan.
2012 - Replacement 28” HDPE Pipe Header at Malakoff Power Plant, Perak.
MOHD KHIROL IZAM
Project Manager, PMX Malaysia Sdn Bhd
Mobile: +6011-59543324
E-mail: izam.rahim@pmxmalaysia.com
PHILIP CHEN
Project Director, Arrow Media Sdn Bhd
Mobile: +6019-2626393
SUHAIMI SALLEH
Manager M&E, Binapuri Sdn Bhd
Mobile: +6013-3450266