Marks items with details such as grade or acceptance-rejection status
Record inspection or test data, such as weight, temperature, grades, or moisture content, and quantities inspected or graded
Analyzed and interpret blueprint, data, manuals, and materials to determine specifications, inspection and testing procedure
Prepare test or inspection reports describing result, recommendations, or needed repair
Piping and equipment survey for replacement/repair through visual and NDT which need assessments based on code and standard
Perform visual for pipeline inspection from refinery to jetty, plan for NDT base on DEP and API570 requirement
Inspection Involve in pipeline pigging activity and data verification
Perform maintenance visual inspection for structural, pipe support, platform, pressure vessel, tanks, spring hanger, boiler internal support, refractory inside furnace condition in refinery
Involve in jetty marine environment inspection such as, jetty pile, platform, beam structures, loading arm, inboard hub, single buoy marine, and underwater pipeline
Plant equipment inspection such as vessel, heat exchanger, furnace, boiler etc
Involved in plant or jurisdiction inspection and shutdown works
Performed through internal and external inspection on DOSH (jurisdiction) registered equipment as per Scheme of Examination (SOE) for Certificate of Fitness renewal (CF)
Identify possibility of corrosion failure, understand concept of corrosion control options and the suitable to its environment
(eg: design, material selection, coating selection etc.)
Produce finding reports once data collected and to apply appropriate monitoring methods on the relevant corrosion degradation mechanism for inspection
To inspect and justify on the CUI for equipment and piping system and recommend for immediate action to ensure plant or systems integrity
Manage overall DOSH (jurisdiction) activities for the plant and ensure all DOSH (jurisdiction) will be done within the time given
Prepare NDT inspection result according to the requirement ASME code and specification, - Mini TA CDU (crude distillation unit) Shell Refining company
External& Internal Inspection for heat Exchanger, Furnace, Column, P/vessel
Evaluate data and findings with corrosion specialist for fitness service purpose
Perform inspection tasks and schedule monitoring programs to assure the mechanical integrity of the equipment
Determine the corrosion rates, remaining life, and next inspection date for each piping and equipment
Assure that the minimum preheat and postweld heat treatments are performed in accordance with the qualified welding procedures
Ensure all NDE results are evaluated and determined to be accepted or rejected, with recommendations to resolve all deficiencies
Determine the pressure test requirements for pressure vessels after alterations or major repairs, i.e., type of test, test medium, test pressure, test gauges, duration, regulatory requirements and forms
Assuring that all local jurisdiction regulations are followed, including completing all forms, data sheets, and reports
Welding/Coating Inspector
DANAMIN SDN BHD
11.2015 - 12.2015
Seconded to PPM
Project : PSR2 & MG3 TA 2015
Location/contractor : Petronas Penapisan Melaka, Welding on Piping/Structure/Pressure Vessel
Review procedures and all related documents use by KTO for fabrication is approved and up to date with FMC and client requirements
Ensure all fabrication work meet procedures requirement
Inspection base on NOI and ITP (monitor, witness ,hold point) such as material inspection, material verification (piece mark cutting), fit-up inspection, welding activity, Dimensional check and etc
Monitor all fabrication work (structural and pipe) is follow to AFC drawing and up to date for any revision
Review contractor fabrication reports and documentation
Submit weekly report
Witness and verify FAT (Factory Acceptance Test) activities
QAQC
Review Kencana QAQC procedures such as NDT procedures, painting & blasting procedures, WPS, DC procedures, consumable control procedures, levelling, EFAT, FAT and etc
And meets all requirements for production manifolds
Review RT films, MPI reports, Boroscope, hardness test reports and DC reports
Witness WQT and WPS for structural/piping/tubing qualification arrange by Kencana
Witness test panel for blasting and painting guide by procedures
Witness and conducted WPS and WQT for CRA cladding piping
Review Kencana NDT reports,PMI, DC reports and documentation
Perform boroscope inspection on pipe welding root
Submit QAQC weekly reports to clients(Shell).
9.Code References : AWS D1.1, FMC Q,M Spec., API 17D, API 6A, API 1104 &
DEP 1.5.4 - 37.81.10.32-EPP(structural),
DEP 37.81.40.31 (pressure containing part)
LRCC COB Boiler Shutdown, Around
10.2010
Performed Inspection activity base on Inspection Test Plan(ITP)
Monitor Replica Test, Hardness Test for the old tubes
Controlled all welding job followed approved WPS and DEP Standard
Monitor all NDT work such as DPT, RT, PMI and MPI as shell Procedure
Checked all fitting such as flanges, valves were tighten correctly before perform Hydro test
Arrange Shell Inspector and reporting job progress
Documentation and Box-up cert document
Code Ref :ASME VIII, DEP 31.22.20.31-Gen
LPG Bullet Tank Vessel Shutdown Maintenance ( V2902 & V2907)
To arrange NDT team for inspection
To arrange vessel inspection etc TOFD, MPI, UTTG and DPT
To monitor Boroscope/ Video Inspection activity
To submit inspection reports timely
To report any findings to Shell inspector
To do material inspection for new item installed
To follow work progress as per client arrangement
To complete box-up certificate timely
To compile all document in data record
Code Ref :ASME VIII, DEP 31.22.20.31-Gen
Tank Maintenance T1270,T1251,T1264,T1272,T702,T1111 and etc ( 2008-2010)
To check and inspect tank cleaning base on DEP
To arrange tank inspection ex
MFL, Tank Calb, UTTM and etc
To check blasting activity
To submit inspection reports timely
To monitor all coating and painting work on all splash zone area
To check all repairing work tally with procedure
To monitor vacuum test, pontoon Test and Hydro test
To complete box-up certificate timely
To compile all document in data record.Code Ref: API 653, DEP 70.51.10.11-Gen
Amine unit Vessel and Column shut down( Nov-Dis ’08)
Inspected Pressure Vessel before and after cleaning
Finding and decision were following ASME IX and API 510
Job were conducted by inspector
To monitor all procedure that is related to DOSH for any repair work those require DOSH
To monitor material inspection
To monitor NDT team for proper and timely NDT works
To checked inspection reports timely
To monitor Hydro Test
Code Ref :ASME VIII, DEP 31.22.20.31-Gen
Renew Piping Sour Water line at MVU(~400 joint)
Prepared and checked all document such as weld map, ISO drawing, Welder Cert, mill cert, WPS and Welder Qualification before start a work
Control fit-up, visual and request for NDT all welding job
Monitor inspection progress as per scheduled
Monitor and checked piping installed following the ISO drawing
Perform hydro test witnessed by Shell Inspector
ASME B31.3, DEP 31.38.01.31-Gen
Major Turn
Education
Diploma - Mechanical Engineering
Politeknik Sultan Salahuddin Abd Aziz Shah
01.2004 - 01.2007
SPM - Science
MRSM Beseri
01.1999 - 01.2000
Skills
Height :172 cmundefined
Additional Information
CERTIFICATES AND TRAINING
, API510 (Pressure Vessel Inspector Cert. No : 64015)
API570 (Piping Inspector Cert. No :77135)
CSWIP 3.1 Welding Inspector (Cert. No. : 71232)
PCN Radiographic Interpreter Level II : ( PCN NO : 303276)
Valid NIOSH OGSP and AESP Card.