Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

Muhammad Rahimi Bin Mohd Suhaimi

Nilai

Summary

Process integration professional with proven history of streamlining operations and driving efficiency improvements. Known for collaborative approach and ability to adapt to evolving project needs. Skilled in data analysis, process optimization, and fostering productive team environments.

Overview

10
10
years of professional experience

Work History

Process Integration Engineer

ONSemiconductor ISMF Wafer Fab
02.2022 - Current
  • Reduced device scrap costs by $12.37K in six months through electrical yield improvements, exceeding the 2024 target
  • Managed defect density program, achieving an 11% reduction from baseline and meeting site KPIs for 2023
  • Increased probe card availability from 57.4% to 90% in 2024, eliminating lot holds (from 3 cases/month to zero) and reducing repair cycle time by 42.86% (from 14 days to 8 days) with the vendor
  • Conducted cross-vendor study, achieving 24% probe card cost reduction by switching to a local vendor
  • Optimized Engineering Build Requests (EBR), achieving 95.67% on-time delivery (OTD) in 2023 and 97.2% in 2024
  • Conducted device yield analysis (Die Yield: 99.26%, Survival Yield: 99.58%), driving Continuous Improvement Projects (CIP) and implementing yield dashboards
  • Served as CBSM Site Ambassador, reducing PI Peeling rate by 22% in 2024
  • Automated data handling via Tableau, eliminating manual processes and reducing redundant work by two headcounts
  • Led Fab Prober Consolidation project (2025), improving tool productivity by 60% and reducing utility costs by 30% through cross-platform studies

Process Engineer

Samsung SDI Battery Seremban
09.2014 - 02.2022
  • Led new product introduction for three Bosch power tool batteries, achieving 99.2% average yield with no major quality issues
  • Managed two major EV battery transfer projects from HQ (Cheonan), successfully passing product qualification
  • Reduced material waste by 7%, saving $6.5K annually, by optimizing laminating trimming width
  • Drove lean process adoption, cutting cycle time by 25% while maintaining strict safety compliance
  • Improved OEE by 40% through a cross-platform laminating machine study, shutting off one tool and reducing utility costs by 22%
  • Earned HQ Masterpiece Award (2019)
  • Enhanced laminating cycle time and CPK, increasing CPK by 28.4% and cutting cycle time by 19.33%
  • Awarded HQ Masterpiece Award (2019)
  • Established a new reel laminating line for polymer batteries, training 12 operators and ensuring zero downtime in the first quarter post-launch
  • Implemented real-time database monitoring (RTDB) for reel laminating process poka-yoke in 2020, eliminating 100% of quality accidents, reducing defects from 4 cases per 3 months to zero

Education

Bachelor of Engineering - Mechanical Engineering

Universiti Tun Hussein Onn Malaysia
01.2014

Skills

  • Statistical analysis
  • TPS
  • RCPS
  • Failure mode and analysis
  • Leadership and Facilitation
  • Lean manufacturing
  • Cost savings
  • Power BI
  • Excel Advance
  • Tableau

Personal Information

Work Permit: I authorize your handling of my personal details as per 'Malaysian Law Personal data Protection Act 2010 (PDPA 2010)'

Timeline

Process Integration Engineer

ONSemiconductor ISMF Wafer Fab
02.2022 - Current

Process Engineer

Samsung SDI Battery Seremban
09.2014 - 02.2022

Bachelor of Engineering - Mechanical Engineering

Universiti Tun Hussein Onn Malaysia
Muhammad Rahimi Bin Mohd Suhaimi