Summary
Overview
Work History
Education
Skills
WORK REFERENCE
Timeline
Generic
MUHAMMAD FATHAN BIN ANUAR

MUHAMMAD FATHAN BIN ANUAR

Testing And Commissioning Engineer
Klang, Selangor

Summary

I believe my maturity, past experiences and determination will make me an excellent employee for your company

Overview

11
11
years of professional experience
8
8
years of post-secondary education
2
2
Languages

Work History

T&C Engineer

Tech-store Malaysia Sdn. Bhd
02.2024 - Current
  • Oversee the installation of equipment and systems, ensuring they are installed according to the design specifications and industry standards
  • Conduct various tests, starting from PICO, PAT, SAT and also SIT
  • This is to verify that individual components, subsystems, and the entire system operate as intended
  • Ensuring the quality of the installed systems, helping to prevent potential problems and ensure long-term reliability
  • Setup network configuration for equipment such as network switch and electronic control unit

Project Engineer

PLP Electrical Engineering Sdn. Bhd
05.2023 - 01.2024
  • Lead installation for power equipment installation such as Rectifier Transformer, Relay control panel, Battery panel and others AC/DC equipment
  • Lead for containment installation at site, include cable pulling work and also termination of cables
  • Review design drawing and type of material for installation at site
  • Overseeing the progress and method of installation in order all works follow the design and requirement of the client
  • Liaising with subcontractor, consultant and client for installation progress and also attend site walk and weekly meetings
  • To follow up for Pre-PICO and PICO comment in order to achieve installation target

Project Engineer

Apex Communication Sdn Bhd
01.2019 - 04.2022
  • Interact daily with the clients to interpret their needs and requirements and represent them in the field
  • Monitor site progress and method of installation by following the correct procedure and work ethic
  • Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support
  • Perform overall quality control of the work following the project planning and report regularly on project status
  • Prepare for site documentation such as site report & progress report

Site Engineer

China Railway Construction Limited (CRCC)
01.2018 - 12.2018
  • Liaising with clients, subcontractors, and other professional staff, especially quantity surveyors and the overall project manager
  • Checking technical designs and drawings to ensure that they are followed correctly
  • Carry out day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors
  • Communicate with clients and their representatives (architects, engineers, and surveyors), including attending regular meetings to keep them informed of progress

Site Engineer

Apex Communication Sdn Bhd
07.2015 - 12.2017
  • Checking and preparing site reports, site readiness and progress report
  • Manage the day-to-day activities of contractors and subcontractors working on the site, includes monitoring schedules and progress and ensuring that project elements are completed on time
  • Ensure that the work carried out by the workers and other related activities are as per the safety regulation of the respective state or area
  • Communicate with clients and their representatives (architects, engineers, and surveyors), including attending regular meetings to keep them informed of progress of work
  • Perform the activities of pre-inspection of all works and activities (include FAT and PICO)

Site Engineer

Teraju Construction
04.2014 - 06.2015
  • Supervise work on site to ensure that works are carried out in accordance with the proper methodologies, construction drawings and standard workmanship procedures
  • Planning installation progress at site in order to achieve progress as per planned
  • Liaising with clients, subcontractors, and other professional staff, especially quantity surveyors and the overall project manager
  • Following-up on transportation to make sure to receive precast component just-on-time at site

Education

Bachelor of Science (Hons) - Construction management

Universiti Teknologi Mara (UiTM)
Shah Alam, Selangor
06.2012 - 11.2014

Diploma - Building

Universiti Teknologi Mara (UiTM)
Seri Iskandar, Perak
06.2009 - 11.2012

Sijil Pelajaran Menengah (Vokasional)

Sekolah Menengah Teknik Klang
Selangor
01.2007 - 12.2008

Skills

Effective Time Management

Quality control

Project planning

Technical reporting

WORK REFERENCE

Mr. Agus Salim Ahmad

Project Manager

Tech-store Malaysia Sdn Bhd

017 7713757


Mr. Shamsul Nizam

T&C Manager

Tech-store Malaysia Sdn Bhd

012 9500771


Mr. Azmi Ahmad Zainuddin

Deputy Project Manager

Apex Communication Sdn Bhd

019 2777004


Timeline

T&C Engineer

Tech-store Malaysia Sdn. Bhd
02.2024 - Current

Project Engineer

PLP Electrical Engineering Sdn. Bhd
05.2023 - 01.2024

Project Engineer

Apex Communication Sdn Bhd
01.2019 - 04.2022

Site Engineer

China Railway Construction Limited (CRCC)
01.2018 - 12.2018

Site Engineer

Apex Communication Sdn Bhd
07.2015 - 12.2017

Site Engineer

Teraju Construction
04.2014 - 06.2015

Bachelor of Science (Hons) - Construction management

Universiti Teknologi Mara (UiTM)
06.2012 - 11.2014

Diploma - Building

Universiti Teknologi Mara (UiTM)
06.2009 - 11.2012

Sijil Pelajaran Menengah (Vokasional)

Sekolah Menengah Teknik Klang
01.2007 - 12.2008
MUHAMMAD FATHAN BIN ANUARTesting And Commissioning Engineer