Summary
Overview
Work History
Education
Skills
Websites
Projects Involved Cendana Auto Sdn Bhd
Activities Involved Cendana Auto Sdn Bhd
Interpersonal Skills
References
Timeline
Generic
MUHAMMAD AMIR IDHAM BIN ABDUL MALIK

MUHAMMAD AMIR IDHAM BIN ABDUL MALIK

Head Of Department Trim And Final
Dengkil,10

Summary

Experienced in the automotive industry as a Process Engineer and Head of Department in Trim & Final. Successfully overseen production lines and demonstrated a strong passion for optimizing efficiency and driving continuous improvement. Goal is to seek new opportunities that will contribute to career growth and allow for leadership roles. Proven track record in enhancing productivity and dedication to excellence. Ready to make a significant impact in any organization.

Overview

7
7
years of professional experience
2031
2031
years of post-secondary education
2
2
Languages

Work History

Head of Department Trim and Final

Cendana Auto Sdn. Bhd.
Semenyih, Selangor
01.2023 - Current
  • Participate in line Trim and final (TF) department as a Process Engineer and HOD.
  • Provide strategic direction to the department in alignment with vision and mission for each project.
  • Ensure departmental objectives and targets are effectively met with the project timeline using Microsoft project
  • Supervise and manage 22 team members, including performance evaluations and career development.
  • Prepare standard practice to Technician for assembly in trim final department.
  • Perform quality check on received part that required in Trim final department
  • Carry out pick up problem and issued in Trim and final department
  • Invent inventory system in department for supporting smooth operations
  • Involve in prototype vehicle for Special Operation vehicle (SOV), Mortar Transporter and Weapon Platform vehicle.
  • Involve in Final Acceptance Test (FAT) with army for FFR TD in technical issue and problem
  • FAT include Endurance Test, Road Test, Test protocol, Radio test and Winch Test for the vehicle
  • Manage and conduct training for Malaysian Army to enhance technical skills, safety procedure, troubleshooting and practical exercise to ensure proper use of the vehicle
  • Improved customer satisfaction rates through attentive service, prompt issue resolution, and continuous process improvements.
  • Oversaw inventory management processes, maintaining optimal stock levels while minimizing waste and losses due to shrinkage or obsolescence.
  • Collaborated with other departments to ensure seamless coordination in achieving company-wide objectives.
  • Increased productivity by identifying bottlenecks and implementing targeted solutions.

Process Engineer

Cendana Auto Sdn. Bhd.
Semenyih, Selangor
10.2021 - 01.2023
  • Participate in line Trim and final (TF) department as a Process Engineer.
  • Design and fabricate assembly jig for installation part.
  • Performed quality check on received item that required in Trim final department
  • Carry out pick up problem and issued in Trim and final department.
  • Provide standard practice to Technician for assembly in trim final department.
  • Conducted root cause analysis to identify, prioritize and eliminate process losses.
  • Designed and executed experiments to identify process improvements, leading to reduced time and increased efficiency.
  • Involved in built with 10-unit FFR (fitted for radio) project for UN (United Nation) ,21-unit FFR (fitted for radio) project for Tentera Darat and 24 unit Mortar Carrier Vehicle project for Tentera Darat.

Aircraft Maintenance (OJT)

Sabah Air Aviation Sdn. Bhd.
Subang Jaya, Selangor
02.2021 - 07.2021
  • On job training (6 months)
  • Participated in aircraft engine ground run (EGR) as a ground crew and flight crew for Beechcraft King Air B200
  • Actively worked on maintenance, repair and overhaul of aircraft
  • Played a contributory role in replacement of main RH & LH landing gear actuator
  • Worked on in removal, Inspection and installation of RH & LH outboard & inboard flap
  • Performed aircraft refueling and defueling for Beechcraft King Air B200
  • Performed aircraft general and detail visual inspection of aircraft, component cleaning as per appropriate documents and manuals
  • Performed in removal and installation of fuel quantity gages for fuel quantity gages calibration
  • Participated in aircraft weighing
  • Took lead on removal and installation of aft, forward passenger seat
  • Assisted in adjusting beta valve and beta nut on LH engine
  • Involved in Ground Service Equipment (GSE) checked and store
  • Type of aircraft working on; Beechcraft King Air B200

Freelance Role

Diverse Product Engineering Sdn .Bhd.
Damansara, Selangor
09.2020 - 12.2020

• Carried out replacement of underground tank collar (fibre) at Damansara Damai Petronas branch.

• Performed pressure test 5-10 psi for primary layer of the underground tank to check leakage with soap suds.

• Performed vacuum test 5-10 psi for secondary layer of the underground tank.

Aircraft Maintenance (OJT)

Sabah Air Aviation Sdn. Bhd.
Subang Jaya, Selangor
01.2018 - 06.2018
  • On job training (6 months)
  • Participated in aircraft engine ground run (EGR) as a ground crew and flight crew for Beechcraft King Air B200
  • Actively worked on maintenance, repair and overhaul of aircraft
  • Supported in aircraft lifting using jack to facilitate main landing gear
  • Assisted in storage of engine Arrius-1A (helicopter)
  • Played a contributory role in main landing gear shock absorber inspection for crack and wear
  • Performed in removal and installation flight compartment seat
  • Assisted in troubleshooting of weather radar system
  • Participated in yaw damper troubleshooting
  • Performed in assisting in main rotor blade removal and installation for repair due to lower surface PU strip deterioration
  • (helicopter)
  • Participated in main rotor blade tracking adjustment on blue and red pitch change
  • (helicopter)
  • Type of aircraft working on; Beechcraft King Air B200 and Airbus S355 NP

Education

Bachelor of Aircraft Engineering Technology (Hons) - Mechanical

Universiti Kuala Lumpur Malaysian Institute of Aviation Technology
Dengkil, Selangor, Malaysia
07.2018 - 07.2021

Diploma of Engineering Technology - Aeroplane Maintenance

Universiti Kuala Lumpur Malaysian Institute of Aviation Technology
Dengkil, Selangor, Malaysia
07.2015 - 06.2018

Sijil Pelajaran Malaysia (SPM) -

SMK Bandar Baru Salak Tinggi
Sepang, Selangor, Malaysia
04.2001 - 01.2014

Penilaian Menengah Rendah (PMR) -

SMK Bandar Baru Salak Tinggi
Sepang, Selangor, Malaysia

Skills

MS WORD

MS Power Point

MS Excel

CATIA V5

undefined

Projects Involved Cendana Auto Sdn Bhd

  • Van Rapid On-Demand by Prasarana, still undergoing 300 units
  • Mortar Transporter (MT815), 30 units
  • Fitted for Radio (FFR) United Nation (UN), 10 units
  • Weapon Platform Vehicle (KPS ATGW), 12 units
  • Fitted for Radio (FFR) Markas Angkatan Tentera Malaysia (MATM), 4 units
  • Weapon Platform Vehicle (KPS HMG), 20 units
  • Special Obstacle Vehicle (SOV), 16 units
  • Weapon Platform Vehicle (KPS AGL), 17 units
  • Mortar Transporter (MT815), 48 units
  • Fitted for Radio (FFR) Tentera Darat (TD), 21 units
  • Mortar Transporter (MT815), 24 units
  • Fitted for Radio (FFR) Tentera Darat (TD), 19 units
  • Fitted for Radio (FFR) United Nation (UN), 20 units

Activities Involved Cendana Auto Sdn Bhd

  • Involved as a supervisor project with 300 units Rapid van on-demand by Prasarana., 12/01/24
  • Participated with Mortar 81mm firing training FAT at Kem Syed Sirajuddin, Gemas., 12/01/24
  • Managed and conducted Mortar Transporter Vehicle training for Malaysian Army at Kem Pulada, Ulu Tiram., 07/01/24
  • Involved with Defence Service Asia Exhibition and Conference (DSA) for Cendana Auto Sdn Bhd., 05/01/24
  • Managed and conducted Weapon Platform Vehicle training for Malaysian Army at 15th Royal Malay Regiment, Senawang., 04/01/24
  • Associated with in Final Acceptance Test (FAT) with army for vehicle KPS ATGW 12 units., 03/01/24
  • Took part in Final Acceptance Test (FAT) with army for vehicle FFR UN 10 units., 02/01/24
  • Managed and conducted for Special Obstacle Vehicle (SOV) training for Malaysian Army at Kem Sungai Udang., 02/01/24
  • Involved with vehicle exhibition at Science & Technology Research Institute for Defence (STRIDE)., 01/01/24
  • Participated in Final Acceptance Test (FAT) with army for vehicle KPS HMG 20 units., 12/01/23
  • Associated with in Final Acceptance Test (FAT) with FFR MATM 4 units at Kem Sungai Besi., 11/01/23
  • Involved with event 'Penyerahan Aset Tentera Darat' at Kem Sungai Besi., 10/01/23
  • Participated with Final Acceptance Test (FAT) with army for vehicle Special Obstacle Vehicle SOV 16 units., 10/01/23
  • Involved with Final Acceptance Test (FAT) with army for vehicle KPS AGL 17 units., 06/01/23
  • Lead for Parking Brake Testing for 72 units Mortar Transporter Vehicle with Malaysian Army., 04/01/23
  • Associated with in Final Acceptance Test (FAT) with Mortar Transporter 48 units., 01/01/23
  • Took part in Final Acceptance Test (FAT) with army for vehicle FFR TD 19 units at Bukit Chin Chin and Bukit Besi., 09/01/22
  • Managed and conducted FFR UN vehicle training for Malaysian Army vehicle at Malbat Vilage, Port Dickson., 08/01/22
  • Manage and conduct FFR TD vehicle training for Malaysian Army at Kem Sungai besi, Kem Erskine and Kem Muara Tuang., 07/01/22
  • Associated with in Final Acceptance Test (FAT) with Mortar Transporter 24 units., 04/01/22
  • Involved with Defence Service Asia Exhibition and Conference (DSA) for Cendana Auto Sdn Bhd., 03/01/22
  • Taking part within Final Acceptance Test (FAT) with Fitted for Radio (FFR TD) 19 units., 02/01/22
  • Involved in Final Acceptance Test (FAT) with Fitted for Radio (FFR UN) 20 units., 11/01/21

Interpersonal Skills

  • Teamwork – Effectively collaborate with cross-functional teams to achieve production goals.
  • Responsibility – Accountable for department performance, quality, and efficiency.
  • Hardworking – Committed to continuous improvement and operational excellence.
  • Leadership – Guide, motivate, and develop team members for optimal productivity.
  • Time Management – Prioritize tasks to meet deadlines and production targets.

References

  • Mr. Khairil Anuar Bin Muhamad Styling and Design Principal Engineer Cendana Auto Sdn.Bhd. Khairil.anuar@cendana-auto.com +60 192791033
  • Mr. Mohamad Normazuan Bin Mustafa Head of Department Cendana Auto Sdn.Bhd. normazuan@cendana-auto.com +60 167209784
  • Mr. Shahrinoldin Bin Othman Head of R&D and Manufacturing Cendana Auto Sdn Bhd. shahrinoldin@cendana-auto.com +06 127298580

Timeline

Head of Department Trim and Final

Cendana Auto Sdn. Bhd.
01.2023 - Current

Process Engineer

Cendana Auto Sdn. Bhd.
10.2021 - 01.2023

Aircraft Maintenance (OJT)

Sabah Air Aviation Sdn. Bhd.
02.2021 - 07.2021

Freelance Role

Diverse Product Engineering Sdn .Bhd.
09.2020 - 12.2020

Bachelor of Aircraft Engineering Technology (Hons) - Mechanical

Universiti Kuala Lumpur Malaysian Institute of Aviation Technology
07.2018 - 07.2021

Aircraft Maintenance (OJT)

Sabah Air Aviation Sdn. Bhd.
01.2018 - 06.2018

Diploma of Engineering Technology - Aeroplane Maintenance

Universiti Kuala Lumpur Malaysian Institute of Aviation Technology
07.2015 - 06.2018

Sijil Pelajaran Malaysia (SPM) -

SMK Bandar Baru Salak Tinggi
04.2001 - 01.2014

Penilaian Menengah Rendah (PMR) -

SMK Bandar Baru Salak Tinggi
MUHAMMAD AMIR IDHAM BIN ABDUL MALIKHead Of Department Trim And Final