Summary
Overview
Work History
Education
Skills
Timeline
Generic
MUHAMMAD AKHMAR AMINRUDDEN B. SAIDINA HAMZAH

MUHAMMAD AKHMAR AMINRUDDEN B. SAIDINA HAMZAH

Sales & Project Executive
Kuala Lumpur

Summary

Currently attached to CEKAP TECHNICAL SERVICE S/B from Okt 2018 until present of experience as a Sale And Project Executive. For (14) years of experience in downstream and upstream oil & gas sector industries in Mechanical,Rotory and E&I Having a variety of exposure in various level of which put me in a different level as a suitable candidate for this position.

Overview

15
15
years of professional experience

Work History

Sales & Project Executive

Cekap Technical Services Sdn Bhd
01.2023 - Current
  • Calibration Gas flow Meter at BASF,Johor Port
  • Re-Install Antenna And Radio 4G Lte at Platfrom Dulang B
  • Installation PW-4G LTE At Bekok-C
  • Installation PW4G LTE At Sotong Platform
  • Maintenance MOV Rotork MK2 at Berantai Epoms
  • Calibration Gauge and PSV at Air Selangor
  • Install and Testing Solar system at Selesa Hillhome
  • Project Lead for Manpower Supply at TNB Port Dickson
  • Project Lead Installation PSV at Air Selangor,Sungai Labu
  • Lead for Overhoul Main pump at Lotte,Pasir Gudang
  • Managing workforce project at Fatty Chemical Plant
  • Project Lead for BTU Metering calibration at Malakoff Utilities,K.L Sentral

PCSB Asset
01.2019 - 01.2022
  • Installation PW-4G LTE system at PCSB Asset, Using Ericsson Equipment At 28 platform
  • Partial Discharge testing at Scientex,Sony,Kanika
  • Service And Testing PSV at Air Selangor
  • Installation Piping Line At Pengerang Terminal Sdn Bhd
  • Servicing,maintenance and troubleshooting MOV at Tanjung Bin, Main Plant T30
  • In-house maintenance contractor Pengerang Terminal Sdn Bhd (Vopak) for 2021
  • Superviser maintenance and overhoul for pump and turbine at KAO Fatty Chemical,Prai
  • TA for SPCI Gebeng, PSV overhoul and testing
  • Overhoul multistage pump Dongyang at Lotte,Johor Port.
  • Calibration Water flow meter at Malakoff,KL Sentral

Supervisor

RTK Engineering S/B
08.2016 - 10.2018
  • Down stream work in all PCSB, MURPHY,Exxon Mobil and Repsol site,for inspection and maintenance for MOV and SDV all brand.(Rotork,Biffi,Flowserve,Auma,CCI and Trutorq)
  • Install,service and maintenance centrifugal pump at KLK oleo Klang,Emery,Evyap,Oleon and Kapar Energy Venture
  • Install, Service and Commissioning Centrifugal Pump Pome Product for Biodiesel 2014-2015 for all PDB , Petron and Caltex.
  • Overhoul SDV pneumatic actuator at B11(PCSB) and BOA,BRA (Repsol)
  • HVAC Air Handling Unit Variable Speed Drive maintenance Service
  • HVAC Condenser Water Pump and Cooling Tower Energy Saving

KNDP A(Repsol)
01.2017 - 01.2018
  • Maintenance and service MOV at KNDP A(Repsol)
  • Bolt Torquing at Air Product
  • Service,overhoul and install for MOV at ABF(Asean Bintulu Fertilizer)
  • Install and Servicing Weather Forcast at PCSB
  • Install and Commissioning for 4G LTE Project for trial Unit at PCSB
  • Supervise for service and overhoul pump at KAO Fatty Chemical,Prai.
  • Maintenance and Installing HVAC at site Repsol (PM-3)
  • HVAC Condenser Water Pump at Hotel One World
  • HVAC Electric Heater Installation at Kapar Energy Venture (KEV) and TNB Jana Manjung
  • Managing In-House Contractor in Pengerang Independent Terminal S/B

Supervisor

Mehtaflow S/B
07.2014 - 07.2016
  • Project Management and technical, document for tender, RFQ and Pre-Screening.
  • ( Techno-Commercial proposal ) for ongoing project and on-site solution.
  • Attend Kickoff meeting, Negotiation meeting, final handover and Project Management.
  • Troubleshooting electrical, instrument and mechanical part
  • Supervisor on site offshore / onshore, installation, commissioning and maintenance.

Senior Technician / Supervisor

LC Tech Engineering S/B
06.2012 - 06.2014
  • Servicing HP valve at Senoko Power Plant,Singapore.
  • Installation actuator REXA at TNB Paka.
  • Install new main pump at jetty KEV unit 5.
  • Install new system for actuator damper at TNB Paka.
  • Install new Actuator and Valve at TNB Paka.
  • Involve in boiler and turbine such as flame scanner.
  • Involve in upgreading Tank Fram to install package MOV and Valve from manual operation to MOV at PPT(Petronas)
  • Involve in upgreading spark system from manual to auto system at PPT(Petronas)
  • Maintenance MOV and Valve package for shut down at MLNG (Malaysia LNG S/B)

Technician

Panaron S/B
06.2010 - 06.2012
  • Knowledge abaut MOV,PUMP,SDV,PSV,Insrument Equipment and Pipe Line
  • Familiar with various industry code requirements.
  • Possess knowledge of markets, equipment, specifications, standards and codes
  • Strong expertise on valve product, design construction, material, process and application.
  • Working at almost all site TNB,Petronas,Malakoff, Power Plant and General Industrial.
  • Responsible for installation and commissioning of Hydrastep system for steam drum at TNB site.
  • Installation and commissioning of VTI valve with MOV at TNB Manjung,KEV,PPT,PPM.
  • Upgrading project for flame scanner at GPPA,GPPB and PPM
  • Responsible for installation, calibration and commissioning of various valve from high pressure valve to low pressure valve.

Education

Diploma - Mechanical Engineering

Politeknik Port Dickson
01.2010

Skills

Sharp interpersonal and team leadership on project management through Strategic Planning

Timeline

Sales & Project Executive

Cekap Technical Services Sdn Bhd
01.2023 - Current

PCSB Asset
01.2019 - 01.2022

KNDP A(Repsol)
01.2017 - 01.2018

Supervisor

RTK Engineering S/B
08.2016 - 10.2018

Supervisor

Mehtaflow S/B
07.2014 - 07.2016

Senior Technician / Supervisor

LC Tech Engineering S/B
06.2012 - 06.2014

Technician

Panaron S/B
06.2010 - 06.2012

Diploma - Mechanical Engineering

Politeknik Port Dickson
MUHAMMAD AKHMAR AMINRUDDEN B. SAIDINA HAMZAHSales & Project Executive