Experienced with strategic project planning and execution, consistently delivering projects on schedule and within budget. Utilizes strong leadership and communication skills to guide cross-functional teams toward successful outcomes. Track record of leveraging analytical and problem-solving abilities to navigate complex project challenges effectively.
Overview
15
15
years of professional experience
2
2
Languages
Work History
Sale And Project Executive
Cekap Technical Service S/B
10.2018 - Current
Installation PW-4G LTE system at PCSB Asset, Using Ericsson Equipment At 28 platform.
Partial Discharge testing at Scientex, Sony, Kanika
Service And Testing PSV at Air Selangor
Installation Piping Line At Pengerang Terminal Sdn Bhd
Servicing, maintenance and troubleshooting MOV at Tanjung Bin, Main Plant T30
In-house maintenance contractor Pengerang Terminal Sdn Bhd (Vopak) for 2021
Supervisor maintenance and overhaul for pump and turbine at KAO Fatty Chemical, Prai
TA for SPCI Gebeng, PSV overhaul and testing
Overhaul multistage pump Dongyang at Lotte, Johor Port.
Calibration Water flow meter at Malakoff, KL Sentral
Calibration Gas flow Meter at BASF, Johor Port
Re-Install Antenna And Radio 4G Lte at Platform Dulang B
Installation PW-4G LTE At Bekok-C
Installation PW4G LTE At Sotong Platform
Maintenance MOV Rotork MK2 at Berantai Epoms
Calibration Gauge and PSV at Air Selangor
Install and Testing Solar system at Selesa Hillhome
Project Lead for Manpower Supply at TNB Port Dickson
Project Lead Installation PSV at Air Selangor, Sungai Labu
Lead for Overhaul Main pump at Lotte, Pasir Gudang
Managing workforce project at Fatty Chemical Plant
Project Lead for BTU Metering calibration at Malakoff Utilities, K.L Sentral
Deliver reliable and innovative solutions to clients through effective planning, clear communication, and value-added customer service.
Highly organized with strong task prioritization skills; proficient in working with relational databases, spreadsheets, presentations, email platforms, and public relations.
Demonstrates solid understanding of market demands, industry codes, specifications, and competitive landscape.
Supervisor
RTK Engineering S/B
08.2016 - 10.2018
Maintenance and service MOV at KNDP-A(Repsol)
Bolt Torquing at Air Product
Service, overhaul and install for MOV at ABF(Asean Bintulu Fertilizer)
Install and Servicing Weather Forecast at PCSB
Supervise for service and overhaul pump at KAO Fatty Chemical, Prai.
Maintenance and Installing HVAC at site Repsol (PM-3)
HVAC Condenser Water Pump at Hotel One World
HVAC Electric Heater Installation at Kapar Energy Venture (KEV) and TNB Jana Manjung
Managing In-House Contractor in Pengerang Independent Terminal S/B
Supervisor
Mehtaflow S/B
07.2014 - 07.2016
Install, service and maintenance centrifugal pump at KLK oleo Klang, Emery, Evyap, Oleon and Kapar Energy Venture
Install, Service and Commissioning Centrifugal Pump Pome Product for Biodiesel 2014-2015 for all PDB , Petron and Caltex.
Senior Technician / Supervisor
LC Tech Engineering S/B
06.2012 - 06.2014
Installation actuator REXA at TNB Paka.
Install new main pump at jetty KEV unit 5.
Install new system for actuator damper at TNB Paka.
Install new Actuator and Valve at TNB Paka.
Involve in boiler and turbine such as flame scanner.
Involve in upgrading Tank Fram to install package MOV and Valve from manual operation to MOV at PPT(Petronas)
Involve in upgrading spark system from manual to auto system at PPT(Petronas)
Maintenance MOV and Valve package for shut down at MLNG (Malaysia LNG S/B)
Technician
Panaron S/B
06.2010 - 06.2012
Knowledge about MOV, PUMP, SDV, PSV, Instrument Equipment and Pipe Line
Familiar with various industry code requirements.
Possess knowledge of markets, equipment, specifications, standards and codes
Strong expertise on valve product, design construction, material, process and application.
Working at almost all site TNB, Petronas, Malakoff, Power Plant and General Industrial.
Responsible for installation and commissioning of Hydrastep system for steam drum at TNB site.
Installation and commissioning of VTI valve with MOV at TNB Manjung, KEV, PPT, PPM.
Upgrading project for flame scanner at GPPA, GPPB and PPM
Responsible for installation, calibration and commissioning of various valve from high pressure valve to low pressure valve.
Education
Diploma - Mechanical Engineering
Politeknik Port Dickson
Skills
Strong interpersonal skills and proven team leadership in project management, with a focus on strategic planning to drive results
Skilled in dynamic problem-solving and strategic decision-making to support and achieve organizational objectives
Deliver reliable and innovative solutions to clients through effective planning, clear communication, and value-added customer service
Highly organized with strong task prioritization skills; proficient in working with relational databases, spreadsheets, presentations, email platforms, and public relations
Demonstrates solid understanding of market demands, industry codes, specifications, and competitive landscape