Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Countries worked
Nationality
Timeline
Generic
Muhamad Syazwan Bin Mohd Jasni

Muhamad Syazwan Bin Mohd Jasni

Senior Subsea Control Engineer - Software
Shah Alam,Selangor

Summary

Dynamic engineering professional with extensive experience in automation systems and subsea control products, including design, procurement, and comprehensive testing of control systems. Proficient in executing in-house testing protocols such as FAT, EFAT for Control, XMT, manifold, SEM SRT, SCM SRT, and reconnection tests, along with offshore commissioning activities. Demonstrated project involvement with notable companies including PTTEP on projects such as Rotan (Block H), Kikeh, Siakap, SNP Beach Otway, CNOC Lingshui, Nova, and Dvalin. Experience spans support engineering for SCM/XMT production to MCS hardware/software engineering and testing across diverse initiatives.

Overview

11
11
years of professional experience
5
5
Certifications

Work History

Senior Control Engineer - Software

OneSubsea Malaysia System Sdn Bhd
Port Klang, Selangor
01.2024 - Current

1. Block-H Water Correlation Model Development Project:

  • Created and finalized designs to meet project requirements.
  • Resolved project operational problems to minimize delays and unexpected cost increases.
  • Enhanced overall system performance with advanced programming techniques and software tools.

2. Dvalin and Nova Project:

  • Trained personnel on new control system features, promoting a smooth transition during upgrades or installations.
  • Customized user interfaces for better operator accessibility, resulting in increased productivity and ease of use.
  • Facilitated training sessions for staff on new control systems, boosting team competency and reducing downtime.

3. Service and Commissioning Activities: LS17-2 shutdown, Beach Otway Phase 5B Commissioning,Siakap SCM SRT, Kikeh SCM SRT, Block-H SSIV replacement testing, Siakap EFL IR/CR test and Siakap Choke Insert testing.

  • Developed and implemented preventive maintenance and operational procedures for electrical systems.
  • Retested control products and systems to determine effect of modifications.
  • Provided technical support for control and instrumentation equipment, improving reliability and reducing maintenance costs.
  • Pioneered use of simulation software for control system validation, reducing risk of errors in live environments.
  • Conducted thorough risk assessments for control system designs, minimizing potential safety hazards during operation.
  • Performed rigorous testing procedures on newly installed or upgraded controls systems, validating functionality prior to full-scale implementation.

Senior Control Engineer - Software

Aker Solutions Malaysia Sdn Bhd
Port Klang, Selangor
06.2022 - 12.2023

1. PTTEP BLOCK-H - Virtual Sensor software development, PTTEP Kikeh Phase 3A, PTTEP Kikeh SSGL:

  • Created and finalized designs to meet project requirements.
  • Resolved project operational problems to minimize delays and unexpected cost increases.
  • Customized user interfaces for better operator accessibility, resulting in increased productivity and ease of use.
  • Performed rigorous testing procedures on newly installed or upgraded controls systems, validating functionality prior to full-scale implementation.

2. Service and Commissioning Activities: Beach Energy Otway Phase 5, CNOOC LS17-2, PTTEP Siakap, PTTEP Kikeh and PTTEP Block-H.

  • Reduced downtime by effectively troubleshooting and resolving complex control system issues.
  • Conducted detailed root cause analyses to address and rectify recurring system faults, enhancing system stability.
  • Provided technical support for control and instrumentation equipment, improving reliability and reducing maintenance costs.
  • Retested Control products and systems to determine effect of modifications.
  • Evaluated and identified opportunities to improve performance of control systems.
  • Established and maintained effective communication with clients and contractors.
  • Assisted in installation of control systems and components for commercial and industrial applications.

Control Engineer - Software

Aker Solutions Malaysia Sdn Bhd
Port Klang
06.2019 - 05.2022

1. PTTEP Block-H Phase 1A, PTTEP Siakap Phase 2 and PTTEP Kikeh MCS Upgrade:

  • Created and finalized designs to meet project requirements.
  • Resolved project operational problems to minimize delays and unexpected cost increases.
  • Customized user interfaces for better operator accessibility, resulting in increased productivity and ease of use.
  • Performed rigorous testing procedures on newly installed or upgraded controls systems, validating functionality prior to full-scale implementation.

2. Service and Commissioning Activities: Beach Energy Otway Phase 4,PTTEP Kikeh MCS Upgrade, PTTEP Block-H Phase 1A.

  • Reduced downtime by effectively troubleshooting and resolving complex control system issues.
  • Conducted detailed root cause analyses to address and rectify recurring system faults, enhancing system stability.
  • Provided technical support for control and instrumentation equipment, improving reliability and reducing maintenance costs.
  • Retested Control products and systems to determine effect of modifications.
  • Evaluated and identified opportunities to improve performance of control systems.
  • Established and maintained effective communication with clients and contractors.
  • Assisted in installation of control systems and components for commercial and industrial applications.

DCS Service Engineer

Ingenious Staffing Sdn Bhd
Malacca, Melaka
06.2018 - 06.2019

1.Resident Service Engineer for Malaysia Refining Company Sdn Bhd.

  • Enhanced customer satisfaction by promptly addressing service requests and providing technical solutions.
  • Tested and checked performance of hardware and software programs.
  • Engaged in first-level support for customers requiring routine support and troubleshooting.
  • Analyzed, troubleshot and diagnosed problems and provided prompt repair and solutions.
  • Improved system efficiency with thorough troubleshooting and root cause analysis of technical issues.
  • Reduced equipment downtime by performing regular maintenance checks and implementing preventive measures.
  • Installed, configured and tested equipment on specialized platforms.
  • Created relationships with key decision-makers and served as external technical spokesperson.

System Service Engineer

Yokogawa Electric Malaysia Sdn Bhd
Puchong, Selangor
11.2015 - 06.2019

1. Lead DCS Engineer responsible for service project :

- RGTEC: Additional I/O, Modbus Tie-In, Logic modification, mimic modification, and installation of Hart/Fieldbus Device

- N2 Compressor Installation: Additional I/O, Modbus Tie-in, Logic modification and Mimic Modification

- DCS Upgrade Projects: Software upgrade to newer version and Hardware upgrade

- Smooth Startup Program DCS modification: Logic modification, mimic modification, Kongsberg system Tie-in and commissioning of smooth startup program.

-Shell Northwest Stormpetrel and Seaeagle Controller and Database Upgrade: DCS controller upgrade and logic program modification, Focal person from Yokogawa for Boiler Flush Up and Sea Trial.

2.Responsible engineer for DCS preventive maintenance and shutdown maintenance.

  • Provided exceptional customer service, addressing technical issues promptly to maintain high levels of client satisfaction.
  • Mentored junior engineers, sharing knowledge and expertise to foster a collaborative team environment and enhance overall department performance.
  • Developed preventive maintenance schedules to minimize downtime and optimize performance.
  • Organized and directed maintenance shutdowns and startups.

Project/ Service Engineer

Global Plant Control Automation (GPCA) Sdn. Bhd
Shah Alam, Selangor
11.2014 - 11.2015
  • Project Description: Kapar Energy Ventures, Unit 4 Turbine Drive Level Control System and Turbine Control Oil System Migration Project:
  • Migration Project from Mitsubishi Heavy Industries system into Ovation Distributed Control System from Emerson.
  • Project also involved in Condensate Polishing Plant migration from GE FANUC Programmable Logic Controller into Ovation DCS.
  • HP Bypass system migration from Allen Bradley Programmable Logic Controller into Ovation DCS.
  • Migration of hydraulic oil system from low pressure Analog Electrohydraulic to high pressure DEH Digital Electrohydraulic
  • Combine two system of ABB Bailey Digital Control System and Emerson Ovation Digital Control System by using OPC

Education

Bachelor of Electrical Engineering -

Universiti Teknikal Malaysia Melaka
Malacca
08.2014

Diploma of Electrical Engineering -

Universiti Teknikal Malaysia Melaka
Malacca
08.2011

Skills

Certification

BOSIET + Boat transfer – OPITO

Affiliations

Board of Engineers Malaysia – Registered Graduate Engineer

Countries worked

Malaysia

Nationality

Malaysia

Timeline

Senior Control Engineer - Software

OneSubsea Malaysia System Sdn Bhd
01.2024 - Current

Senior Control Engineer - Software

Aker Solutions Malaysia Sdn Bhd
06.2022 - 12.2023

Control Engineer - Software

Aker Solutions Malaysia Sdn Bhd
06.2019 - 05.2022

DCS Service Engineer

Ingenious Staffing Sdn Bhd
06.2018 - 06.2019

System Service Engineer

Yokogawa Electric Malaysia Sdn Bhd
11.2015 - 06.2019

Project/ Service Engineer

Global Plant Control Automation (GPCA) Sdn. Bhd
11.2014 - 11.2015

Bachelor of Electrical Engineering -

Universiti Teknikal Malaysia Melaka

Diploma of Electrical Engineering -

Universiti Teknikal Malaysia Melaka
Muhamad Syazwan Bin Mohd JasniSenior Subsea Control Engineer - Software