Summary
Overview
Work History
Education
Skills
Role Responsibilities
Additional Knowledge
Miscellaneous
Personal Information
Timeline
Generic
MOHD KHAIRUL AZWAN AB MANAF

MOHD KHAIRUL AZWAN AB MANAF

Looking For A New Opportunity!
Kuantan,Pahang Darul Makmur

Summary

Eager to contribute to team success through hard work, attention to detail, and excellent organizational skills. Also, I am looking to apply my transferable skills in project management & problem-solving. Committed to continuous learning and contributing to innovative solutions.

Overview

10
10
years of professional experience
9
9
years of post-secondary education

Work History

Technician Specialist

INVEX HOME DECO
02.2023 - Current
  • Project: Specialize in installing flooring.

QC Inspector

DIALOG PLANT SERVICE SDN. BHD.
05.2022 - 07.2022
  • Project: BASF AROMA COMPLEX CITRAL TURNAROUND 2022

Internal Mounting QC Inspector

CS WIND MALAYSIA
11.2019 - 03.2022
  • Project: VESTAS INVENERGY 12 Wind Tower
  • Project: SIMENS GEMENSA RENEWBLE ENERGY 10 Wind Tower

QA/QC Inspector

ASTURI METAL BUILDER
06.2015 - 10.2018
  • Perform inspection & prepare the inspection report from material receiving to delivery of equipment according to ITP, Code and Client Specification
  • Ensure fabrication item as per drawing
  • Ensure tolerance such as roundness, projection, high-low and final dimension as per Codes and Client Requirement
  • Review supplier’s material certificates
  • Ensure all WPS available in workshop
  • Conduct Welding Procedure Qualification Record (PQR) and Welder Qualification Test (WQT) as per ASME IX
  • Have knowledge on various type of welding process (SMAW,GTAW,FCAW,GMAW and SAW)
  • Make sure welding activities performed by qualified welder
  • Make sure welder using the right welding consumable during fabrication
  • Perform visual inspection on weld profile prior to NDE
  • Prepare test package before FAT for pressure vessel and piping
  • Compile inspection report for Manufacturing Data Report (MDR)
  • Make sure all equipment such as pressure gauge, pressure recorder, laser temperature have a valid calibration certificate before perform the inspection
  • Review NDE report and such as Dye-Penetrant Testing (DPT), Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Radiography Test (RT) and Phase Array Ultrasonic Testing (PAUT)
  • Liaise with NDE company
  • Delivery inspection
  • Project: MMHE SDB
  • BHD
  • Client: Petronas Cari Gali Sdn
  • Bhd
  • Material: SA 516 GR 70N
  • Thickness: 25mm
  • Equipment: V-5410 (Utility Air Receiver), V-5420 (Instrument Air Receiver), V-6220 (LP Flare Ko Drum), V-5950 (Nitrogen Receiver)
  • Project: SARAWAK SHELL BERHAD
  • Material: SA 516 GR 70N + SA240 316L
  • Thickness: 78mm + 3mm (Clad)
  • Equipment: V-3030 (Tilted Plate Coalescer)

Education

DIPLOMA Of Metal Fabrication -

ILP Kuantan
01.2013 - 01.2014

Gas Pipe Installation - undefined

ABM Wilayah Timur
01.2011 - 01.2012

Metal Fabrication - undefined

ILP Kuantan
01.2009 - 01.2010

Sijil Pelajaran Malaysia - undefined

Sek. Men Keb Bukit Goh
01.2003 - 01.2007

Penilaian Menengah Rendah - undefined

Sek. Men. Keb Bukit Goh
01.2003 - 01.2005

Skills

  • ASME II Part A, B & C (Material)
  • ASME VIII Div 1 & 2 (Rules for Construction Pressure Vessel)
  • ASME IX (Qualification Standard for Welding and Brazing Procedure, Welders, Brazers, and Welding and Brazing Operator)
  • ASME V (Non-Destructive Examination)
  • ASME B165 & B169 (Pipe Flange and Fitting)
  • ASME B1647 (Large Diameter Steel Flange)
  • ASME B313 (Process Piping)
  • Petronas Technical Standard (PTS) 31222031- Pressure Vessel
  • Carbon steel
  • Stainless steel
  • Cladding
  • Duplex

Role Responsibilities

  • Perform inspection & prepare the inspection report from material receiving to delivery of equipment according to ITP, Code and Client Specification.
  • Ensure fabrication item as per drawing.
  • Ensure tolerance such as roundness, projection, high-low and final dimension as per Codes and Client Requirement.
  • Review supplier’s material certificates.
  • Ensure all WPS available in workshop.
  • Conduct Welding Procedure Qualification Record (PQR) and Welder Qualification Test (WQT) as per ASME IX.
  • Have knowledge on various type of welding process (SMAW,GTAW,FCAW,GMAW and SAW).
  • Make sure welding activities performed by qualified welder.
  • Make sure welder using the right welding consumable during fabrication.
  • Perform visual inspection on weld profile prior to NDE.
  • Prepare test package before FAT for pressure vessel and piping.
  • Compile inspection report for Manufacturing Data Report (MDR).
  • Make sure all equipment such as pressure gauge, pressure recorder, laser temperature have a valid calibration certificate before perform the inspection.
  • Review NDE report and such as Dye-Penetrant Testing (DPT), Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Radiography Test (RT) and Phase Array Ultrasonic Testing (PAUT).
  • Liaise with NDE company.
  • Delivery inspection.

Additional Knowledge

Microsoft Office Word, Excel and Power Point, English and Bahasa Malaysia, ASME II Part A, B & C (Material), ASME VIII Div. 1 & 2 (Rules for Construction Pressure Vessel), ASME IX (Qualification Standard for Welding and Brazing Procedure, Welders, Brazers, and Welding and Brazing Operator), ASME V (Non-Destructive Examination), ASME B16.5 & B16.9 (Pipe Flange and Fitting), ASME B16.47 (Large Diameter Steel Flange), ASME B31.3 (Process Piping), Petronas Technical Standard (PTS) 31.22.20.31- Pressure Vessel, Carbon steel, stainless steel, cladding and Duplex

Miscellaneous

Driving License : B2 & D

Personal Information

  • Age: 34
  • Health Status: Excellent
  • Date of Birth: 28/28/91
  • Gender: Male
  • Nationality: Malaysian
  • Marital Status: Married
  • Religion: Islam

Timeline

Technician Specialist

INVEX HOME DECO
02.2023 - Current

QC Inspector

DIALOG PLANT SERVICE SDN. BHD.
05.2022 - 07.2022

Internal Mounting QC Inspector

CS WIND MALAYSIA
11.2019 - 03.2022

QA/QC Inspector

ASTURI METAL BUILDER
06.2015 - 10.2018

DIPLOMA Of Metal Fabrication -

ILP Kuantan
01.2013 - 01.2014

Gas Pipe Installation - undefined

ABM Wilayah Timur
01.2011 - 01.2012

Metal Fabrication - undefined

ILP Kuantan
01.2009 - 01.2010

Sijil Pelajaran Malaysia - undefined

Sek. Men Keb Bukit Goh
01.2003 - 01.2007

Penilaian Menengah Rendah - undefined

Sek. Men. Keb Bukit Goh
01.2003 - 01.2005
MOHD KHAIRUL AZWAN AB MANAFLooking For A New Opportunity!