Summary
Overview
Work History
Education
Skills
Personal Particulars
Additional Information
Activities
Timeline
ProjectManager
MOHD DZULHAIRI BIN ROSLI

MOHD DZULHAIRI BIN ROSLI

Project Manager
Kajang, Selangor

Summary

It has always been my dream to pursue a career staged in the ever challenging and dynamic working environment today. The experience of having attended the University Teknologi Mara (UiTM) to complete my Bachelor Degree of Mechanical Engineering (hons.) and with 20 years working experience, majorly in Project Management in Engineering has given me the drive and excitement to work in the industrial marketplace. I hope to find a progressive thinking company where I can share my knowledge and at the same time, expand my experiences. I am confident that my educational, working experiences and my good interpersonal skills have prepared me for making an immediate contribution to your organization.


Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.


I am also very excited about the possibility of bringing my skills to work for you. Placing me in key roles within the company is part of my long-term objective to become a leader and an asset to my employer.

Overview

20
20
years of professional experience
10
10
years of post-secondary education
2
2
Languages

Work History

Project Manager

M S Time Sdn Bhd
05.2023 - Current
  • Company Overview: A company that dealing with crane majorly in overhead crane (service, manufacture, installation, and spare-parts).
  • To restructure the existing Project Department from organization chart to fabrication line.
  • Monitoring the running project to ensure it run smoothly and to ensure it done within the time frame and cost given.
  • Involve indirectly in EHS and QA/QC matter.
  • Direct reporting to Managing Director.
  • Having a project team that consist of Engineers, Designer, Document Controller, Fabricators, Technicians.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Mentored junior team members in project management best practices to enhance their skills and contribute to better overall performance.
  • Project involved: Installation and fabrication for Overhead crane system for Data Centre in Nusajaya, Johor; Material Handling for equipment for Qatar Oil; Overhead crane system for Petronas Melaka; Overhead and gantry crane system for CMEIS, Sg. Langat under Jabatan Air Selangor; Overhead crane system for Bluescope (M) Sdn Bhd; Overhead crane system for Jabatan Air Penang; Overhead crane system for Mushtari, Terengganu and many more.

Project Manager

Scholpp Asia Pacific Sdn Bhd
04.2013 - 03.2023
  • Company Overview: A company specializes in rigging and installation of heavy machinery.
  • Started from Project Engineer, promoted to Project Manager within a year time.
  • Total control in every task given and a main decision maker (from A to Z).
  • Direct report to Managing Director.
  • Sub task is to support sales team by providing a quotation and technical support.
  • Planned, designed, and scheduled phases for large projects.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Maintained compliance with industry standards and regulations, conducting regular audits and updates to project practices.
  • Managed projects from procurement to commission.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Project involved: Supply Manpower, tools, and equipment for Demolishing all machine and equipment in factory for Japan Tobacco Industries Kelantan; Move-in and install printing line for Kurtz Perak (including the base foundation for the main structure); Move-in and install a few units printing line for Bank Negara Malaysia, Shah Alam; Move-in and install a few units’ transformers for West Port, Klang; Move-in and install a few lines (transformer, pressing line, etc) for SGL Carbon (currently known as Showa Denko); Main contractor for rigging job for Japan Tobacco Industries, Shah Alam including during their move-out process; Lifting job at BASF Petronas Kuantan; Move-in and move-out job for Avery Dennison, Bangi and many more.

Project Engineer (Head of Execution)

Fisher Scientific (M) Sdn Bhd
10.2009 - 02.2013
  • Company Overview: A company specializes in all fields in Laboratory Solution System, specifically in Project Department.
  • Head for the Execution Department.
  • Manage, monitor, and site supervision for all projects, local and SEA.
  • Delegate works and responsibilities to sub-coordinates.
  • Liaise with main contractor, consultant, supplier, and sub-contractor.
  • Control operational cost within approved budget and expenses.
  • Prepare schedule and report for every project.
  • Assist in tender preparation and design for the laboratory system.
  • Provide after sales services.
  • To attend technical and coordination meeting as and when required.
  • Maintained records for each project and engineering discipline.
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Project involved: Design, supply and install for Taylor College Lake Side Campus, Renovation & Upgrade Clean Room, BSL2 for Ninebio, Nuri Project for Sime Darby, DOWS in Rayong, Thailand, Nestle Karawang, Indonesia, Institute Technology Brunei, Brunei, Consultancy for Petronas Melaka, Consultancy for Thai Oil, Thailand, and many more.

Maintenance and Operation Engineer

M S Time Sdn Bhd
01.2006 - 09.2009
  • Company Overview: A certified ISO 9001:2000 company that dealing with crane majorly in overhead crane (service, manufacture, installation, and spare-parts).
  • To assist Project and Service Department.
  • To provide technical support.
  • To coordinate and manage site progress.
  • To monitor maintenance, service and installation job and make a recommendation to customer if necessary.
  • To manage manpower and material.
  • To prepare schedule and report in terms of manpower, equipment, tools, and transportation.
  • To monitor fabrication work.
  • To attend technical meeting as and when required.
  • To control cost.
  • To prepare budget report for every quarter and forecast for the next quarter.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Collaborated with other departments to facilitate successful project completion.
  • Project involved: Installation and fabrication for SMART Tunnel, Meiden Kinabiopower and Seguntor, Sabah, UiTM Engineering Faculty, Tanjung Bin Power Plant, SIRIM RAMET and more.

Project Co-Ordinator

C.T.Teknik (M) Sdn. Bhd.
03.2005 - 12.2005
  • Company Overview: A Mechanical and Electrical Contractor.
  • To assist Project Manager by monitoring and coordinate projects from A-Z, liaise with other contractors, suppliers, and customers to achieve the projects’ goal.
  • To provide technical support to client.
  • To monitor site condition and progress.
  • Provide project report weekly.
  • Improved client satisfaction with timely updates and transparent communication throughout the project lifecycle.
  • Project Involved: Installation of sub-main cable complete with new main switch board with JPS, Renovation for MAS complex A building (Air-conditioning system, electrical and firefighting system), Installation air-conditioning system and main switch board with IKRAM for Block A, B, C, D and E, Installation of lightning arrestor with JPS and more.

Education

Sekolah Menengah Kebangsaan Cheras -

Sekolah Menengah Kebangsaan Cheras
Cheras, Kuala Lumpur
01.1993 - 01.1995

Sekolah Menengah Teknik Cheras - undefined

Sekolah Menengah Teknik Cheras
01.1996 - 01.1997

Diploma In Mechanical Engineering - undefined

MARA University of Technology
Arau, Perlis
01.1998 - 01.2001

Bachelor in Mechanical Engineering (Hons) - undefined

MARA University of Technology
Shah Alam, Selangor
01.2001 - 01.2005

Skills

Skilled in MS Office tools

Personal Particulars

44 Years Old 

Male

Malaysian

Married

3 Beautiful Kids

Additional Information

Willing to Travel: Heavy (>50%)

Willing to Relocate: Will Consider

Possess Own Transport: Yes

Notification Period: 1 Month

Expected Salary: RM 11,000.00 (Negotiable)

Activities

  • 1996 - 1997, Representing SMTKL in Volleyball, Member of Science and Mathematics Club, Assistant Leader of Kadet Remaja Sekolah (KRS)
  • 1998, Representing Faculty of Mechanical Engineering UiTM Arau in rugby
  • 2002 - 2004, Representing Faculty of Mechanical Engineering UiTM Shah Alam in soccer and badminton, Working Committee Information, Festival Sukan Mekanikal ‘MEGAFEST 03’ Fakulti Kejuruteraan Mekanikal

Timeline

Project Manager

M S Time Sdn Bhd
05.2023 - Current

Project Manager

Scholpp Asia Pacific Sdn Bhd
04.2013 - 03.2023

Project Engineer (Head of Execution)

Fisher Scientific (M) Sdn Bhd
10.2009 - 02.2013

Maintenance and Operation Engineer

M S Time Sdn Bhd
01.2006 - 09.2009

Project Co-Ordinator

C.T.Teknik (M) Sdn. Bhd.
03.2005 - 12.2005

Bachelor in Mechanical Engineering (Hons) - undefined

MARA University of Technology
01.2001 - 01.2005

Diploma In Mechanical Engineering - undefined

MARA University of Technology
01.1998 - 01.2001

Sekolah Menengah Teknik Cheras - undefined

Sekolah Menengah Teknik Cheras
01.1996 - 01.1997

Sekolah Menengah Kebangsaan Cheras -

Sekolah Menengah Kebangsaan Cheras
01.1993 - 01.1995
MOHD DZULHAIRI BIN ROSLIProject Manager