Experienced Project Engineer specialising in offshore operations and engineering documentation. Led material procurement and resolved technical queries to ensure project quality and adherence to timelines. Committed to continuous improvement and effective collaboration in fast-paced environments.
Overview
14
14
years of professional experience
Work History
Engineer / Project Engineer (Modification, Construction & Maintainence (MCM) Department)
Dayang Enterprise Sdn. Bhd.
02.2019 - Current
Scoped work and defined workpack preparation requirements for execution.
Owned attachment of workboat materials to support offshore execution readiness.
Coordinated with planning engineer to establish schedule planning norms and man-hour estimates.
Managed job-card development, aligning schedules, resources, and discipline engineer inputs.
Led client updates on outstanding technical queries and required project documents.
Technical Assistant/ Assistant Engineer Project (Hook-Up Commissioning) – FIP Department
Dayang Enterprise Sdn Bhd
Malaysia, Malaysia
07.2015 - Current
Liaise with the Project Engineer and CSR / Client to prepare the next day’s daily plan of construction activities based on the work pack detail and previous work to date.
Material and consumable checking/preparation before project execution and follow up with onshore team if there is any unclear scope of work.
Assist in preparing CSR’s daily reports
Assisted Project Engineer in preparing project workpack, ensuring alignment with project specifications.
Monitor the progress of all work activities including identifying any necessary activities for rescheduling or amendment.
Update the resources and materials utilised against each job cards and the overall status of the work.
Assist Project Engineer to review QSR(Quotation Summary Report) based on work scope and time frame for material / services before submission to client.
Verify the completion status of individual job cards and the overall status of the work.
Record minutes of all project coordinator meetings.
Request additional manpower or material if there are unscheduled task that are being overlooked.
Maintained daily man hours expenditure report to provide essential data for utilisation and performance indicators required by Petronas Carigali (SKO/SBO) / ROC Oil Sdn. Bhd.
Monitored daily workboat utilisation performance, enhancing productivity assessment of crew’s man hour utilisation against planned metrics.
The productivity indicator shall be updated and submitted to Petronas Carigali (SKO/SBO) / ROC Oil Sdn. Bhd.on daily basis or additional information required by client.
Preparing, compile, and submit Close Out Report to client and assist QAQC Engineer for preparing Final Documentation for each project that already completed.
Executed a range of responsibilities to adapt to changing workload requirements.
Provided technical support to clients, resolving issues promptly to maintain high satisfaction levels.
Managed inventory of technical supplies, ensuring timely procurement and cost-effective resource allocation.
Monitored project timelines, assisting in keeping tasks on schedule and within budget constraints.
Technical Assistant/ Assistant Engineer
Dayang Enterprise Sdn. Bhd
03.2012 - 06.2015
Liaise with the Field Engineer and CSR to prepare the next day’s daily plan of construction activities based on the work pack detail and previous work to date
Assisted in preparing CSR daily reports to ensure accurate project tracking and communication
Monitor the progress of all work activities including identifying any necessary activities for rescheduling
Update the resources and materials utilized against each job cards and the overall status of the work
Verify the completion status of individual job cards and the overall status of the work
Record minutes of all project coordinator meetings
Maintained daily man hours expenditure report to provide essential data for utilisation and performance indicators required by Petronas Carigali
Monitored daily workboat utilisation performance and developed productivity metrics for crew’s man hour utilisation against planned targets
The productivity indicator shall be updated and submitted to Petronas Carigali on daily basis
Executed additional tasks to support team efficiency and project deadlines.
Project Involve: WO# 179ST - BAP-AA Electrical Driven Motor Air Compressor Upgrade, WO# 293ST - BCOT Tank 3 Under Side Cellerdeck Roof Deck, Shell Plate & Bottom Plate Blasting Painting, WO#035ST WL-4 TSM, WO#215ST TKDP-B FIRE RECOVERY, WO#338ST Emerging P1 At Baram, WO#035 WLDP-A TSM, WO#036 JADP-A (Jet Pump Lifting), WO#034 SIV-A TSM, WO# 047 WLDP-C & WLP-C TSM, WO #376ST - INSTALL FLAME ARRESTOR AT BOK-A, WO# 358ST BARAM A P1 PIPING TOTAL REPLACEMENT, WO#030 BADP-E TSM, WO#250ST BOKOR (BOP-A) INSTALL PRCV-502 REPLACECORRODED LINE OF 100-HV-0986-6101X(ADDITIONAL), TSM 033 TKP-A TSM, WO#033 TKV-A TSM, WO#034 SIV-A TSM, WO#038 BAV-A, WO#038 BAV-A TSM, WO#050 WLV-C TSM, WO#060ST - Flare Ignition System, WO#056 BYR-A TSM, WO#068 BNJT-F TSM, WO#089 BAP-B TSM, WO#096 D35JT-C TSM, WO#160St TEJT-T CTD Siprod Rig Up Package, WO#338ST BETTY (BEDP-A/BEP-A) FABRICATION / INSTALLATION OF LIFERAFT CRADLES / STRUCTURE EXTENSION / LIFERAFT, WO#521ST KAKGA PORTATBLE WATER STORAGE T5250 PINHOLE LEAK
Education
Bachelor of Science - Bachelor Of Computer Science With Honours
Universiti Malaysia Sabah
Kota Kinabalu, Sabah
01-2011
Skills
Project management
Construction expertise
Resource allocation
Cost estimation
Site operations management
Progress monitoring
Quality assurance
Engineering documentation
Job card management
Technical reporting
Procedure development
Problem solving
Referreral
Suki Anak Adir, Project Director , Dayang Enterprise Sdn. Bhd., 013-8349855
Richard Piong , Project Manager , Dayang Enterprise Sdn Bhd - 016-8790442
Daniel Ch'ng , Project Manager , Dayang Enterprise Sdn Bhd - 016-8311094
Abdullah Sani - Operation Team Lead , AIF Contract ( Dayang Enterprise Sdn Bhd) - 014-3039950
Mohd Firdaus Khan - Project Engineer , Deleum Sdn , Bhd - 016-8748891