Engineer / Project Engineer (Modification, Construction & Maintainence (MCM) Department)

Dayang Enterprise Sdn. Bhd.
02.2019 - Current
  • Scoped work and defined workpack preparation requirements for execution.
  • Owned attachment of workboat materials to support offshore execution readiness.
  • Coordinated with planning engineer to establish schedule planning norms and man-hour estimates.
  • Managed job-card development, aligning schedules, resources, and discipline engineer inputs.
  • Led client updates on outstanding technical queries and required project documents.
  • Controlled project log reviews, ensuring procurement inputs matched material availability needs.
  • Owned liaison with discipline engineers to standardise detailed job planning outputs.
  • Approved offshore material status checks with materials coordinator before start.
  • Reviewed daily reporting content for progress-versus-plan, problem areas, and lessons learned.
  • Coordinated with planning engineer to finalise punch list and action plan tracking.
  • Directed collection of actual man-hours utilisation to inform project reporting and planning.
  • Established productivity and vessel utilisation database for planning norms versus actuals.
  • Reported analysed database outcomes to client within 14 calendar days after completion.

PETRONAS Project Handling 2025 - Present (Contract - MCM - RFP-000000061043).

  • TEMANA CAMPAIGN 2025 - PMMCM-OIL-2024-CR-TE-WOR-009,010, 011,012,028-WP-004
  • BYDP-C FLOWLINE REPLACEMENT (DUPLEX 311L,312S, 312L, 315S ) - PMMCM-OIL-2024-CR-BY-WOR-002-WP-005
  • BAYAN & D18 CAMPAIGN 2025 - PMMCM-Oil-2024-CR-BY-WOR-002, 045,047,048,050,051,052, 071, 072,073,074,075,076,077,081-WP-013
  • BAYAN MOPU GTC-2410 JUMPER LINE 2026 - PMMCM-OIL-2026-CR-BY-WOR-159-WP-027
  • BAYAN AIF CLOSURE CAMPAIGN 2026 - PMMCM-Oil-2025-CR-BY-WOR- 034, 135, 136, 137, 138, 139,140,141,142,143,145 ,160,163,173-WP-029

PETRONAS Past Project Handling 2019 - 2024 (Contract - MCM - CHO/2016/BIE3/1001):

  • MCM-CWR 500 - WLDP-A P1 PIPING REPLACEMENT (AUGUST TA 2019)
  • MCM-CWR 540 - WLP-A AUGUST TA 2019
  • MCM-CWR 840 - BYG-A ADHOC PIPING AND STRUCTURAL RECTIFICATION
  • MCM-CWR 870 - BYDP-C P1 PIPING RECTIFICATION
  • MCM-CWR 882 - BYDP-D PIPING RECTIFICATION JANUARY
  • MCM-CWR 883 - BYDP-B PIPING RECTIFICATION JANUARY
  • MCM-CWR 884 - BYDP-A PIPING RECTIFICATION JANUARY
  • MCM-CWR 885 - BYP-A PIPING RECTIFICATION JANUARY
  • MCM-CWR 886 - BYG-A PIPING RECTIFICATION JANUARY
  • MCM-CWR 887 - BYR-A PIPING RECTIFICATION JANUARY
  • MCM-CWR 901 - BYG-A INSULATION FOR V-232 VENT PIPING
  • MCM-CWR 915 - BYG-A REPAIR CORRODED FLANGE AT SUMP CAISSON T501 AND T502
  • MCM-CWR 987 - BYG-A V-232 RECTIFICATION
  • MCM-CWR 1004 - BYDP-B S-1100 RECTIFICATION
  • MCM-CWR 1026 - BYDP-D CONDUCTOR CLEANING
  • MCM-CWR 1049 - CWR - 1049 BYDP-B Stairsteps Repair
  • MCM-CWR 1108 - BYDP-A P1 PIPING RECTIFICATION 2021
  • MCM-CWR 1110- BYP-A P1 PIPING RECTIFICATION 2021
  • MCM-CWR 1113 - BYG-A P2 PIPING RECTIFICATION 2021
  • MCM-CWR 1120 - BYDP-D P1 PIPING RECTIFICATION 2021
  • MCM-CWR 1154 - BYP-A Anti-Climb Installation
  • MCM-CWR 559 - WL AUGUST TA AT WL-C
  • MCM-TSM 015 - BYG-A TSM
  • MCM-CWR 874 - D18 PIPING REPLACEMENT CONNECTED TO WI D18-207B
  • MCM-CWR 889 - D18JT-B PIPING RECTIFICATION JANUARY
  • MCM-CWR 890 - D18JT-C PIPING RECTIFICATION JANUARY
  • MCM-CWR 1293 - D18JT-B Piping Rectification
  • MCM - CWR 1294 - D18JT-C USD Piping Rectification
  • MCM- CWR 699 Boat landing Finding BYDP-D
  • MCM- TSM 014, CWR 1049 BYDP-B CRITICAL FINDING & Stairstep Repair
  • MCM- TSM 022 – BYDP-C TSM
  • MCM- CWR - 1307 BYDP-C PIPING RECTIFICATION 2022
  • MCM- CWR - 1308 BYDP-D PIPING RECTIFICATION 2022
  • MCM- CWR - 1309 D18MP-A PIPING RECTIFICATION 2022
  • MCM- CWR - 1264 - D18MP-A permanent removal of LCV-602
  • MCM- CWR - 1246 BYG-A Piping Rectification 2022
  • MCM- CWR - 1262 - BYP-A USD Piping Rectification 2022
  • MCM- CWR - 1263 - BYR-A USD Piping Rectification 2022
  • MCM – TSM 013 – BYV-A TSM

Technical Assistant/ Assistant Engineer Project (Hook-Up Commissioning) – FIP Department

Dayang Enterprise Sdn Bhd
Malaysia, Malaysia
07.2015 - Current
  • Liaise with the Project Engineer and CSR / Client to prepare the next day’s daily plan of construction activities based on the work pack detail and previous work to date.
  • Material and consumable checking/preparation before project execution and follow up with onshore team if there is any unclear scope of work.
  • Assist in preparing CSR’s daily reports
  • Assisted Project Engineer in preparing project workpack, ensuring alignment with project specifications.
  • Monitor the progress of all work activities including identifying any necessary activities for rescheduling or amendment.
  • Update the resources and materials utilised against each job cards and the overall status of the work.
  • Assist Project Engineer to review QSR(Quotation Summary Report) based on work scope and time frame for material / services before submission to client.
  • Verify the completion status of individual job cards and the overall status of the work.
  • Record minutes of all project coordinator meetings.
  • Request additional manpower or material if there are unscheduled task that are being overlooked.
  • Maintained daily man hours expenditure report to provide essential data for utilisation and performance indicators required by Petronas Carigali (SKO/SBO) / ROC Oil Sdn. Bhd.
  • Monitored daily workboat utilisation performance, enhancing productivity assessment of crew’s man hour utilisation against planned metrics.
  • The productivity indicator shall be updated and submitted to Petronas Carigali (SKO/SBO) / ROC Oil Sdn. Bhd.on daily basis or additional information required by client.
  • Preparing, compile, and submit Close Out Report to client and assist QAQC Engineer for preparing Final Documentation for each project that already completed.
  • Executed a range of responsibilities to adapt to changing workload requirements.
  • Project Involve: SBO#038 Tapping Point 2017, SBO/FIP-DESB/006INSTALLATION OF NEW BOATLANDING STUB (SMJT-F), WO#009 - WO#009 KAKG-A HAZARDOUS OPEN DRAIN CAISSON PUMP(FIP), SBO/FIP-DESB/012 TBG-A CASING BLOWDOWN LINES INSTALLATION, SBO/FIP-DESB/021A SMG-A, SMP-C, SMJT-D & SMJT-F TAPPIING & WELDING OF 2” ACCESS FITTING, FLANGE REMOVAL &INSTALLATION, WO#047 D21JT-A (RIG -UP), WO#047 SIPROD PRPARATION D21JT-A – FIP, WO#850ST - WLP-C & WLJT-4 Deck Strengthening For Pipeline rehab IFL Installation, WO#988ST (TSM) - Fusible Plug Alpha Bravo Scope, WOIE2003 – BAP-AA BIOCIDE PUMP UPGRADE (DECK EXTENSION UPGRADE)
  • Provided technical support to clients, resolving issues promptly to maintain high satisfaction levels.
  • Managed inventory of technical supplies, ensuring timely procurement and cost-effective resource allocation.
  • Monitored project timelines, assisting in keeping tasks on schedule and within budget constraints.

Technical Assistant/ Assistant Engineer

Dayang Enterprise Sdn. Bhd
03.2012 - 06.2015
  • Liaise with the Field Engineer and CSR to prepare the next day’s daily plan of construction activities based on the work pack detail and previous work to date
  • Assisted in preparing CSR daily reports to ensure accurate project tracking and communication
  • Monitor the progress of all work activities including identifying any necessary activities for rescheduling
  • Update the resources and materials utilized against each job cards and the overall status of the work
  • Verify the completion status of individual job cards and the overall status of the work
  • Record minutes of all project coordinator meetings
  • Maintained daily man hours expenditure report to provide essential data for utilisation and performance indicators required by Petronas Carigali
  • Monitored daily workboat utilisation performance and developed productivity metrics for crew’s man hour utilisation against planned targets
  • The productivity indicator shall be updated and submitted to Petronas Carigali on daily basis
  • Executed additional tasks to support team efficiency and project deadlines.
  • Project Involve: WO# 179ST - BAP-AA Electrical Driven Motor Air Compressor Upgrade, WO# 293ST - BCOT Tank 3 Under Side Cellerdeck Roof Deck, Shell Plate & Bottom Plate Blasting Painting, WO#035ST WL-4 TSM, WO#215ST TKDP-B FIRE RECOVERY, WO#338ST Emerging P1 At Baram, WO#035 WLDP-A TSM, WO#036 JADP-A (Jet Pump Lifting), WO#034 SIV-A TSM, WO# 047 WLDP-C & WLP-C TSM, WO #376ST - INSTALL FLAME ARRESTOR AT BOK-A, WO# 358ST BARAM A P1 PIPING TOTAL REPLACEMENT, WO#030 BADP-E TSM, WO#250ST BOKOR (BOP-A) INSTALL PRCV-502 REPLACECORRODED LINE OF 100-HV-0986-6101X(ADDITIONAL), TSM 033 TKP-A TSM, WO#033 TKV-A TSM, WO#034 SIV-A TSM, WO#038 BAV-A, WO#038 BAV-A TSM, WO#050 WLV-C TSM, WO#060ST - Flare Ignition System, WO#056 BYR-A TSM, WO#068 BNJT-F TSM, WO#089 BAP-B TSM, WO#096 D35JT-C TSM, WO#160St TEJT-T CTD Siprod Rig Up Package, WO#338ST BETTY (BEDP-A/BEP-A) FABRICATION / INSTALLATION OF LIFERAFT CRADLES / STRUCTURE EXTENSION / LIFERAFT, WO#521ST KAKGA PORTATBLE WATER STORAGE T5250 PINHOLE LEAK

Education

Bachelor of Science - Bachelor Of Computer Science With Honours

Universiti Malaysia Sabah
Kota Kinabalu, Sabah
01-2011

Skills

  • Project management
  • Construction expertise
  • Resource allocation
  • Cost estimation
  • Site operations management
  • Progress monitoring
  • Quality assurance
  • Engineering documentation
  • Job card management
  • Technical reporting
  • Procedure development
  • Problem solving

Referreral

Suki Anak Adir, Project Director , Dayang Enterprise Sdn. Bhd., 013-8349855

Richard Piong ,  Project Manager  , Dayang Enterprise Sdn Bhd - 016-8790442

Daniel Ch'ng , Project Manager  , Dayang Enterprise Sdn Bhd - 016-8311094

Abdullah Sani - Operation Team Lead  , AIF Contract ( Dayang Enterprise Sdn Bhd) - 014-3039950

Mohd Firdaus Khan - Project Engineer , Deleum  Sdn , Bhd  - 016-8748891

Suzileane Binti Darus - Petronas Executive (Project HSE) - 019-8557092

Personal Information

  • Home Address : Lot 66, Kampung Pujut Adong, Jalan Adong 3A, 98000 Miri, Sarawak
  • IC Number: 880416-52-6283
  • Ethnicity: Kadayan
  • Number of Children: 1
  • H/P No. : 013-8842655

Timeline

Engineer / Project Engineer (Modification, Construction & Maintainence (MCM) Department)

Dayang Enterprise Sdn. Bhd.
02.2019 - Current

Technical Assistant/ Assistant Engineer Project (Hook-Up Commissioning) – FIP Department

Dayang Enterprise Sdn Bhd
07.2015 - Current

Technical Assistant/ Assistant Engineer

Dayang Enterprise Sdn. Bhd
03.2012 - 06.2015

Bachelor of Science - Bachelor Of Computer Science With Honours

Universiti Malaysia Sabah
Mohd Rafiuddin Bin Darus