Summary
Overview
Work History
Education
Skills
References
Accomplishments
CO-CURRICULAR ACTIVITIES
PERSONAL QUALITY
SUPPLEMENTARY
General
Certification
Timeline
AdministrativeAssistant
MOHD NAAM BIN ROSELI

MOHD NAAM BIN ROSELI

Staff Industrial Engineering
Seberang Jaya,Pulau Pinang

Summary

Motivated professional with a strong work ethic and a commitment to continuous improvement. Proven ability to apply knowledge and skills effectively to drive company growth. Seeking opportunities to leverage expertise in a dynamic environment.

Overview

12
12
years of professional experience
1
1
Certification
2
2
Languages

Work History

Industrial Staff Engineering

Pentamaster Sdn.Bhd
07.2025 - 10.2025
  • 1) New production CM setup
  • 1.1)Project management tool
  • 1.2) Layout Production management and utilization.
  • 1.3) Lean tool for Headcount sizing and optimization.
  • 1.4) IPK implementation line design.
  • 1.5) Costing purchase Equipment setup
  • 1.6) Design process flow for Assembly process and Cycletime each process.
  • 2) Manage and improvise process and headcount sizing.
  • 3) Manage and implementation System IMES(MES configuration)
  • 4) Manage tooling and workbench design to meet product requirement and ergonomics.
  • 5) Manage and preparing Capital expenditure to support the new line setup.
  • 6) Standardization SOP for Contact manufacturing Line Design.
  • 7) Design helicopter jig to by using product design 3D Solidwork/Autocad to ensure safety and quality meet requirement.

Industrial Engineering II

Jabil Circuit Sdn. Bhd.
05.2024 - 07.2025
  • 1. Lead and manage in Kaizen event by method Project charter, VSM, PPQT, SMED, One Piece flow, and Budgeting capital expenditure.
  • 2. Provide coaching, monitor and certifies the Lean Sigma candidate Work with other department on continuous improvement project with technical support.
  • 3. Manage and execute Project expansion layout and machine in capital expenditure review with stack holder WCM,Test,ME,MFG team.
  • 4. Gantt plan review weekly on time readiness.
  • 4. Manage simulation DL sizing by monthly forecast and Lock for Transceiver project.

Industrial Engineering II

Jabil Circuit Sdn. Bhd.
05.2022 - 01.2024
  • Assigned to handle multiple customers in Jabil JBK
  • OEE manage and organize plant level JBK summary.
  • Monthly manage, review and publish with stake holder in Capacity planning.
  • PPQT- Develop modeling manage and coordinate each accordingly to determine monthly, Quarterly HC and Machine requirement for Workcell Intel.
  • Manage and work stake holder in cycletime, MOST and UPH.
  • Layout planning and configuration production line setup on ramp up, expansion and process changes and PPQT readiness.
  • Lead in assist to execute manufacturing improvement and hard saving project.
  • SAP IE - Database to analyze equipment asset each workcell-To establish Process Change Notification for Layout change SME IE award by Regional attending and completion training by Feb 2024.
  • IEDB design for 4 customer in JBK.
  • Manage and training new engineer in data PPQT and IEDB Global standard.
  • EHS community – manage and audit production line by weekly.
  • NPI and mass production yield monitoring & improvement by March 2023.
  • Product troubleshooting related to product quality issue.
  • Achieved Silver certificate by November 2023.
  • Lead and manage in Kaizen event by method Project charter, VSM, PPQT, SMED, One Piece flow, and Budgeting capital expenditure.
  • Provide coaching, monitor and certifies the Lean Sigma candidates.
  • Work with other department on continuous improvement project with technical support.
  • Design and manage on visual tracking output by method raspberry pi with cost deduction number of purchase design by Nov 2024.
  • Manage and custom design on conveyor setup to meet tact time.

Industrial Engineering II

Inari (M) Sdn. Bhd.
07.2021 - 07.2022
  • Manage and meet COO requirement in Layout and meeting with stack holder review.
  • Manage and prepare budget Quarterly.
  • Manage multiple layout Plant 1,2,5 ,P21,P34, Plant Batu Kawan.
  • Manage and advise total square feet requirement to Finance and facility.
  • Manage in layout SMT.

Industrial Engineering I

Jabil Circuit (M) Sdn. Bhd. (Plant 1)
07.2013 - 06.2021
  • IE core for Project Arista/Versa
  • Manage and deliver Project transfer from San Jose and Hong Kong to P1 Penang
  • Manage Capital expenditure with lower cost after DO acknowledge.
  • Manage layout requirements as PPQT requirement and Forecast.
  • Manage and design requirement workstation base on product.
  • Achieved goal customer quarterly in Velocity score in BU KPI.
  • IE Core for Project Photonics
  • Manage Capital expenditure with lower cost after DO acknowledge.
  • Manage PPQT base on individual work cell in Photonics to optimization headcount and machine.
  • Manage and sizing headcount and machine requirement by quarterly.
  • NPI reporting and follow up.
  • Line fallout and quality issue RCCA.
  • Process Gap analysis and cycle time readiness and qualification.
  • ECO related FA report preparation.
  • Process Evaluation and Productivity improvement.
  • IE Core Keysight project Transfer 2013-2014
  • Project sustaining transfer P2 to P1 with 200,000sqft sizing warehouse able to reduce base on product forecast to 15,000sqft till 2024 no change on square foot.

Education

EXECUTIVE MASTER - INDUSTRIAL ENGINEERING

ASIA e UNIVERSITY (AeU)
01.2018

DIPLOMA - MECHANICAL ENGINEERING

UNIVERSITY OF TECHNOLOGY MARA(UITM)
01.2008

Skills

MS Word

References

Nuranis, Assistant Manager Engineering, 019-4568234, Jabil Circuit Sdn Bhd, Batu Kawan, Pulau Pinang, Tel. No.: 019-4568234

Accomplishments

  • Jabil Circuit sdn.bhd(2024)
  • 1.Define and improvised process by reduce step and implementation auto-scan method increase UPH HFNI and HOQA station. (Saving USD 24K per annum)
  • 2. Optimization floor space DA area by reduce travelling. (Saving USD 5K per monthly)
  • Jabil Circuit Sdn.Bhd (2022-2023)
  • Success meet customer tact time demand, base on analysis cycle time and implementation new layout base time study and process flow for Arista layout and velocity requirement achieve below 7days to meet 10K per week(Dyson)
  • Success maximize layout sizing to meet company saving by USD 62,640 Annually on March 2023.(Dyson SMT)
  • Success in analysis on design customer and nature board design to meet customer demand at SMT area by method one piece flow at packout area from travelling 2000step to 950 step Goal 47% reduction step.

CO-CURRICULAR ACTIVITIES

2023 – 2024 Members of EHS Community (Audit) / Jabil Circuit (M) Sdn. Bhd Dec 2023 HDRT training in data Analysis

PERSONAL QUALITY

  • Highly self-motivated, always willing to take up challenges to venture into new field of work.
  • Able to work productively under minimum supervision.
  • Possess good analytical judgement and planning skill.
  • Openness to suggestions and criticism towards self-improvement.

SUPPLEMENTARY

  • Willingness to travel: Moderate (>50%)
  • Possess own transport: Yes (with valid driving license)
  • Goal: Looking forward to explore chances to expand knowledge and venture into new field of work.

General

  • Notice Period: Immediately hiring
  • Expected Basic Salary: RM 7500(Negotiable)

Certification

Navigating through Microsoft Power BI

Timeline

Navigating through Microsoft Power BI

11-2025

Industrial Staff Engineering

Pentamaster Sdn.Bhd
07.2025 - 10.2025

Industrial Engineering II

Jabil Circuit Sdn. Bhd.
05.2024 - 07.2025

Industrial Engineering II

Jabil Circuit Sdn. Bhd.
05.2022 - 01.2024

Industrial Engineering II

Inari (M) Sdn. Bhd.
07.2021 - 07.2022

Industrial Engineering I

Jabil Circuit (M) Sdn. Bhd. (Plant 1)
07.2013 - 06.2021

EXECUTIVE MASTER - INDUSTRIAL ENGINEERING

ASIA e UNIVERSITY (AeU)

DIPLOMA - MECHANICAL ENGINEERING

UNIVERSITY OF TECHNOLOGY MARA(UITM)
MOHD NAAM BIN ROSELIStaff Industrial Engineering