SmartPLS
Motivated student currently working towards PhD in Project Management. Adept at research design, questionnaire development, quantitative analysis and academic writing. Extensive background in investigating project cost management especially cost estimation research.
Investigating and developing a framework to improve cost estimation performance among quantity surveyors in Malaysia
GPA: 5.58/7, Studied
GPA: 5.21/7
Project Management
SmartPLS
SPSS
MS Excel
MS Word
MS Power Point
MS Project
Primavera P6
(1) Fazil, M. W., Lee, C. K., & Tamyez, P. F. M. (2022, October). The moderating effect of project complexity on the relationship between organizational controls and cost estimation performance: A conceptual model. In IOP Conference Series: Earth and Environmental Science (Vol. 1067, No. 1, p. 012045). IOP Publishing.
(2) Fazil, M. W., Lee, C. K., & Tamyez, P. F. M. (2021). Cost estimation performance in the Construction Projects: A systematic review and Future Directions. International Journal of Industrial Management, 11, 217-234.
(1) 5th International Conference on Research Methodology for Built Environment and Engineering 2021(ICRMBEE2021), UiTM Shah Alam, Malaysia,10 November 2021 (Online)