Focused Senior Project Engineer with 15 years of experiences in project management. Success in creating designs and engineering plans to establish project specifications. Detail-oriented in assessing project objectives to determine the correct direction for project planning and technical drawings. Meticulous in remaining involved throughout the life of the project by analyzing project data and reporting in accordance with regulations. Successful in determining project scope, creating project parameters, designing technical drawings to meet objectives and building project deadlines that lead to on-time completion. Proficient communicator in working with teammates to solve problems that arise during implementation. Willing and keen to relocate to Qatar.

Overview

16
16
years of professional experience
5
5
Certificates
2
2
Languages
7
7
years of post-secondary education

Work History

Senior Project Engineer

Anis Construction Sdn Bhd
Sungai Buloh, Selangor
01.2020 - Current
  • Innovated 360 degree painter guide stand for building repainting work to reduced project waste through efficient designs, resulting in 10% cost reduction and improved 40% manhours.
  • Adhered to timelines to meet quality assurance targets
  • Assessed scope and requirements to assist with project design determinations
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion
  • Managed projects effectively to deliver finished work on time
  • Calculated risks during project development and managed risks throughout projects
  • Delivered public presentations to provide plans and updates on projects
  • Oversaw worksite construction to coordinate with supervisors and guide projects
  • Visited sites to plan equipment placement and interconnection to site's existing systems.
  • Developed accurate technical drawings to direct successful engineering projects
  • Determined and scheduled priorities as required to progress engineering work
  • Monitored installation of materials and equipment for compliance with drawings and specifications
  • Recommended improvements for design, construction means and materials based on field or changing conditions
  • Reviewed progress controls for project quality assurance
  • Identified technical risks within managed projects
  • Evaluated change order requests in response to out-of-scope work activities
  • Recommended process improvements to reduce unnecessary waste
  • Delivered concise instructions to technical team to maintain quality control
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines
  • Maintained records for each project and engineering discipline
  • Trained junior engineers in workstation design and material handling
  • Delivered regular compliance reports to drive process improvement and corrective measures
  • Monitored metrics during project execution to maintain compliance with planned costs
  • Assisted with cost proposal development and customer presentations
  • Provided technical direction of system development methodologies to improve technical performance

Project Management Executive

Grasshopper Global
Sungai Buloh
01.2014 - 01.2020
  • Identified plans and resources required to meet project goals and objectives
  • Developed and initiated projects, managed costs, and monitored performance
  • Prepared and submitted project invoices for review and approval
  • Negotiated and managed third-party contracts related to project deliverables
  • Developed and implemented project plans and budgets to ensure successful execution
  • Reported regularly to managers on project budget, progress and technical problems
  • Analyzed project performance data to identify areas of improvement
  • Sourced, vetted and managed vendors needed to accomplish project goals
  • Monitored project progress, identified risks and took corrective action as needed
  • Developed and implemented strategic project plans to meet business objectives
  • Achieved project deadlines by coordinating with contractors to manage performance
  • Managed to reached 100,000 customers engagement within 3 months on media social for Big Apples New Product Launching campaign.
  • Maintained good relation with Vietnam's Manufacturer and Malaysian Local Product Founder by supplied good quality of product resources.

Process Engineer

National Oilwell Varco
Kuala Lumpur
01.2012 - 01.2014
  • Introduced to potential client (Shell, Bumi Armada, PETRONAS) by using TORE OVD to remove sand in separation tank specifically for FPSO by removing 70% or more solids transportation by weight.
  • Evaluated proposed project investments by conducting cost-benefit analyses
  • Developed and implemented process improvements to reduce costs and increase efficiency in industrial production
  • Conducted evaluations of equipment and machinery to verify optimal performance and efficiency
  • Created and implemented project plans for new or improved industrial processes
  • Solicited proposals from third-parties to provide holistic costing data in proposal documentation
  • Developed conceptual scope analyses of project objectives
  • Interfaced with area teams to verify application of technical details
  • Conducted root cause analysis to identify, prioritize and eliminate process losses
  • Prepared scope of work documentation for use in project planning
  • Reviewed processes, identifying areas requiring improvement
  • Evaluated proposed project economics and identified alternative solutions and designs producing improved results
  • Documented feasibility and implementation of third-party projects for review and future reference
  • Created process simulations to test operational outcomes without causing service disruptions
  • Visited client sites to troubleshoot issues and provide one-on-one training
  • Provided technical assistance to production team when issues arose
  • Developed documentation, diagrams, and specifications to meet project requirements and regulatory standards
  • Participated in project reviews to enable ongoing status tracking and reporting.
  • Reduced downtime and increased production capacity with strong maintenance plans
  • Developed and deployed industrial automation systems, increasing efficiency and reduce costs
  • Collaborated with cross-functional teams to develop and implement process changes
  • Managed third-party contractors, inspecting completed work and ongoing efforts to confirm quality and adherence to prescribed guidelines.
  • Visited client sites to troubleshoot issues and provide one-on-one training.

Project Engineer

Hammer Engineering Sdn Bhd
Shah Alam
01.2009 - 01.2012
  • Successfully managed to deliver installation project of 55 natural gas new metering skid for industrial consumption in peninsular Malaysia.
  • Managed to solved major problems of Pressure Regulator's Pilot (not fully close cause of Diaphragm Plate thickness). Performed problems and solving report to manufacturer with project timeline maintained.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines
  • Performed constructability reviews of construction bid documents for coordination purposes
  • Assessed impact of modification requests for ongoing projects
  • Reviewed progress controls for project quality assurance
  • Monitored metrics during project execution to maintain compliance with planned costs
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion
  • Evaluated change order requests in response to out-of-scope work activities
  • Developed and implemented procedures to verify compliance with engineering standards
  • Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials
  • Developed comprehensive engineering documents for all projects
  • Documented and developed engineering procedures and processes
  • Monitored and evaluated engineering performance to recommend improvements
  • Identified technical risks within managed projects

Sales & Project Engineer

ANZ Engineering Sdn Bhd
Kemaman
01.2008 - 01.2009
  • Managed to hit first RM100,000 sales in 3 month during probation period with supply 70pcs of Ball Valves for Fire Water Hydrant for MTBE Chemical Plant.
  • Monitored metrics during project execution to maintain compliance with planned costs
  • Reviewed tender proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Negotiated with supplier on commercial proposal and manage to get 10% of project cost saver.
  • Maintained good relation with Client by delivered on time and fast respond in correspondent issues.
  • Determined and scheduled priorities as required to progress engineering work.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Scheduled & monitored project timelines staying on budget & meeting project deadlines.
  • Developed comprehensive engineering documents for all projects
  • Created detailed reports on engineering activities and findings

Education

B.ENG (HONS) - Chemical Engineering

University Malaysia Pahang (UMP)
Gambang, Pahang
01.2004 - 01.2008

High School Diploma -

Melaka Matriculation College
Melaka
03.2002 - 03.2003

Science

Maktab Rendah Sains MARA (MRSM)
Kuantan, Pahang
01.2000 - 01.2002

Skills

    Project Management

undefined

Certification

AUTOCAD Plant 3D - 3D Modelling

Timeline

ART OF CAMERA by FINAS

10-2021

Senior Project Engineer

Anis Construction Sdn Bhd
01.2020 - Current

Project Management Executive

Grasshopper Global
01.2014 - 01.2020

AUTOCAD Plant 3D - 3D Modelling

04-2012

AUTOCAD Plant 3D - P&ID

04-2012

Process Engineer

National Oilwell Varco
01.2012 - 01.2014

PRESSURE REGULATOR APPLICATION

03-2010

INSTRUMENT AUTOMATION SYSTEM

05-2009

Project Engineer

Hammer Engineering Sdn Bhd
01.2009 - 01.2012

Sales & Project Engineer

ANZ Engineering Sdn Bhd
01.2008 - 01.2009

B.ENG (HONS) - Chemical Engineering

University Malaysia Pahang (UMP)
01.2004 - 01.2008

High School Diploma -

Melaka Matriculation College
03.2002 - 03.2003

Science

Maktab Rendah Sains MARA (MRSM)
01.2000 - 01.2002
Izzuddin YakariSenior Project Engineer