- Installed, maintained, and repaired HVAC systems, including air conditioning units and furnaces, in residential and commercial properties.
Universiti Malaya ( January 2026 - September 2026 )
- Installing new water cool chiller ( Trane ) , condessor water pump , water pump , main switch board , cooling tower
- Installing new water cool chiller ( Dunham Bush )
Installing new water cool Chiller ( Daikin ) , water pump , condessor water pump , cooling tower
- Install new modular chiller and water pump (Daikin) at faculty of medicine
- Changing variable refrigerant volume to modular chiller ( High Impact Building )
- Dismantled existing chiller, condenser water pump, water pump, main switchboard, cooling tower, air handling unit, and old power line to facilitate system upgrades.
- Dismantle old system water cool chiller
Dismantle old chiller , water pump , motorized valve
- Renovated chiller room, enhancing operational efficiency and functionality.
- Renovation chiller room
- Completed room renovation, improving aesthetics and usability of space.
- Put in new gas lines, wiring and other support components for HVAC systems.
- installing new wiring for chiller and making new route wiring from main swith board to chiller
Planning new route for electrical wiring
- Make new wiring route for building automatic system
- Upgraded main switch board
installing new main switch board
- installing new line circuit for waterpump , cooling tower and chiller
- Worked from sketches, plans and drawings to understand on-site setups.
- TNB Research Sdn. Bhd. ( january 2026 - august 2026 )
Tenaga Nasional Berhad Subang jaya ( December 2024- April 2025
- KPJ Seremban ( July 2025 - July 2026 )
- Tenaga Nasional Berhad Kuantan ( August 2024 - December 2024 )
- Hospital Al-Sultan Abdullah
- installing new line circuit for waterpump , cooling tower and chiller
Hospital Al-Sultan Abdullah