Summary
Overview
Work History
Education
Skills
Additional Information
Aboutme
Languages
Timeline
Generic
MOHAMAD AKMAL AHMAD

MOHAMAD AKMAL AHMAD

SITE INSPECTOR
BATU PAHAT

Summary

Can adapt to everyone and very punctual

Overview

10
10
years of professional experience

Work History

SITE INSPECTOR

DESARU NORTH COUSE RESIDENCES SDN BHD (UEMSUNRISE)
09.2020 - Current

CADANGAN MEMBINA 122 UNIT 'HOLIDAY HOMES' YANG MENGANDUNGI FASA 1.

i. 38-unit rumah kluster 2 tingkat jenis A (30'x70').

ii.10 unit rumah kluster 2 tingkat jenis A1 (44'x70')

iii. 8-unit rumah kluster, 2 tingkat jenis B (35'x70').

iv. 2-unit rumah berkembar, 2 tingkat, jenis C1 (40'x80').

v. 4-unit rumah berkembar, 2 tingkat, jenis C2 (38'x80').

Vi.4 unit rumah berkembar, 2 tingkat jenis C3 (34'x80').

vii. 2 unit pencawang elektrik.


During Construction 2020-2022, The Maris Desaru Coast Phase 1.

  • To coordinate and control all physical aspects of day-to-day working on a construction project to ensure compliance with all regulatory requirements.
  • Meet operational standards of quality and schedule.
  • To conduct joint inspection with a consultant for all architectural, c&s, and m&e trades.
  • To manage subcontractors by monitoring and controlling workmanship.
  • Daily routine for standing supervision on site.
  • To maintain a good quality record.
  • To prepare site progress photos every month for the marketing and sales department.
  • Inspect and control the quality of construction work as per QLASSIC specification.
  • To maintain a safe, secure, and healthy environment at the site.
  • To participate in the Monthly HSE Committee Meeting, Southern Project, by the QASHE team.
  • QAQC monthly committee meeting by QASHE team.
  • QASHE quality and HSE inspection every month.
  • Participation in the discussion.
  • To participate in the Site Project Meeting.
  • To participate in job training for all trades by contractor.


During DLP 2022-2024, The Maris Desaru Coast Phase 1

  • Receive and resolve all defect work as long as in Defect Liability Period (DLP).
  • Monitor to resolve all defect work in 14 days.
  • Monitor and check material on site every day.
  • Coordinate and supervise defect work activities.
  • Monitor all workers' activity every day.
  • Record all defects received from the purchasers through joint inspection with the purchaser and email, and update defect status to the Senior Executive and PTL.
  • Handing over and closing defects with purchasers to achieve purchaser's satisfaction, timely completion, and quality.

Assistant Supervisor

SCM Property Services Sdn Bhd
2 2019 - Current

Assistant Site Supervisor

Aston Star Sdn Bhd
04.2015 - 02.2019
  • - To conduct inspection for all trades of architectural work for 30 units (10 unit for each level @ P2, P3 & P3A) at cabana. - To conduct joint inspection with consultant for all architectural trades. - Daily routine for standing supervision on site. - To prepare site daily record for architectural works, to prepare request for site inspection, to prepare weekly report. - To participate in safety program e.g
  • Tool box meeting, fire drill & to ensure always comply with basic personal protective equipment (PPE) with all times at the site. - To participate in Site Coordination Meeting - Ability to work independently & less supervision by superior - Passionate towards works & discipline with time (punctuality)

Draughtsman

Code Red Studio
01.2015 - 02.2015

Operator

Perusahaan Azharazad
09.2014 - 11.2014

Education

Primary/Secondary School/SPM/"O" Level in Arts -

Skills

Adobe Photoshop

Additional Information

  • EMPLOYEE FOR THE MONTH of JANUARY 2017
  • CC R&B STOMPERS KKS2
  • MENJADI FASILITATOR PROGRAM HARI PENDAFTARAN DAN MINGGU SUAI KENAL
  • KELAB BRIDGET SUKARELAWAN (BRISK)
  • MEWAKILI KOLEJ DALAM KEJOHANAN SUKAN DAN PERMAINAN KOLEJ KOMUNITI NEGERI JOHOR 2014 (SUKAN BOLA SEPAK)
  • MENYERTAI KURSUS ILUSTRASI SENIBINA
  • MENYERTAI KURSUS PENGENALAN KESELAMATAN DAN KESIHATAN PEKERJA BINAAN

Aboutme

enjoy with sport and outdoor activity

Languages

English
Bahasa Malaysia
Bahasa Indonesia

Timeline

SITE INSPECTOR

DESARU NORTH COUSE RESIDENCES SDN BHD (UEMSUNRISE)
09.2020 - Current

Assistant Site Supervisor

Aston Star Sdn Bhd
04.2015 - 02.2019

Draughtsman

Code Red Studio
01.2015 - 02.2015

Operator

Perusahaan Azharazad
09.2014 - 11.2014

Assistant Supervisor

SCM Property Services Sdn Bhd
2 2019 - Current

Primary/Secondary School/SPM/"O" Level in Arts -

MOHAMAD AKMAL AHMADSITE INSPECTOR