Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Md Zaki Bin Jusoh

Chargeman A1
Sungai Petani, Kedah

Summary

Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results. Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.

Overview

15
15
years of professional experience
2
2
Languages

Work History

Leading Chargeman

Fatty Chemical (M) Sdn Bhd
10.2011 - 12.2024
  • Routine inspection of plants overall.
  • Took HT & LT meter reading
  • Switching for motor control at MCCR requested by CCR.
  • Replace pump and motor malfunction.
  • Troubleshoot motor control.
  • Timely response to maintenance requests and emergency breakdowns is essential to ensure an uninterrupted plant process.
  • Performing monitoring activities during the contractor's execution of repair, installation, and modification works.
  • Repair lighting and perform minor air conditioning service.
  • Responsible for inspecting and verifying all electrical equipment brought in by the contractor.
  • Perform monthly and yearly scheduled preventive maintenance and TPM.
  • Responsible for carrying out maintenance and operational tasks on electrical installation systems while ensuring that safety procedures and protocols are properly followed.
  • To record all activities in an organized manner using the prescribed forms and logbooks.

Site Foreman

Casasiti Sdn Bhd
08.2009 - 10.2011
  • Delivered high-quality workmanship by overseeing all aspects of construction from start to finish.
  • Maintained accurate records of daily activities, including time sheets, material logs, and safety reports.
  • Accelerated project timelines through proficient use of tools, equipment, and machinery on the job site.
  • Prepare the underground pipe for HT & LV cable.
  • Prepare cable ladder, cable trunking, cable tray, G.I piping and busduct.
  • Carry out cable for HT, LV, street lighting, switch gear, MSB, and D.Bs, MCCR to chiller room, motor pump, 3-phase, and control cable.
  • Termination works.
  • Inspection and testing work.

Maintenance Supervisor

Dewan Perniagaan Melayu Pulau Pinang
10.2009 - 10.2010
  • Took the meter reading.
  • Check the report and work orders from the tenant (CIMB).
  • Repair lighting and air conditioner (ACPU).
  • Arrange and supervise the contractor.
  • Receive a quotation from the contractor.
  • Prepare D.O's.
  • Liaised with contractor to ensure timely delivery of essential parts and materials for repairs or replacements.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.

Education

Penjaga Jentera Elektrik (Sistem Voltan Rendah) A1

Institut Kemahiran Belia Negara (IKBN)
Bukit Mertajam, Penang, Malaysia
12-2011

Pendawai Elektrik 1 Fasa (PW1)

Pusat Giatmara Malaysia
Sik, Kedah
03-2007

Skills

Hardworking and able to work long hours

References

Hasmizan (+6018-468 9360)

Plant Engineer | Fatty Chemical (M) Sdn Bhd


Roland Wee (+6019-7767079)

Project Engineer | Casaciti Sdn Bhd


Salmi Suhana (+604-2503017)

Human Resource | DPMMPP

Timeline

Leading Chargeman

Fatty Chemical (M) Sdn Bhd
10.2011 - 12.2024

Maintenance Supervisor

Dewan Perniagaan Melayu Pulau Pinang
10.2009 - 10.2010

Site Foreman

Casasiti Sdn Bhd
08.2009 - 10.2011

Penjaga Jentera Elektrik (Sistem Voltan Rendah) A1

Institut Kemahiran Belia Negara (IKBN)

Pendawai Elektrik 1 Fasa (PW1)

Pusat Giatmara Malaysia
Md Zaki Bin JusohChargeman A1