EPCC of Black Condensate & Heat Integration (PPTSB), 02/2020 ~ 12/2020
Lead Assign Engineer
Static Equipments consist :-
- 21 Nos. Shell and Tube Heat Exchanger
- 5 Nos. Pressure Vessel
- 1 No. Process Column
- 1 No. Process Fired Heater
- 1 No. Steam Ejector Package
- 1 No. Process Column Tray modification from conventional Tray to high-performance Tray
Leading & Assisting the team for Technical Specification, Design, Preparation of Calculation, Drawings, MTO, Technical Delivery Condition etc.
Urethane Pre-Polymer Plant -HO (COSMO Scientex (M) Sdn Bhd), 12/2019 ~ 02/2020,
Lead Mechanical Engineer
Study and Verified Hot Oil heater Replacement
Perform detailed engineering of Hot Oil Heater
Commissioning Support for Hot Oil Heater Package
EPCC for Site Water Reservoir (Eastman Malaysia Sdn. Bhd.), 03/2019 ~ 07/2019,
Lead Mechanical Engineer
Perform detailed engineering for 2 Nos water filter and 2 Nos self priming pump.
Support construction activity at site.
FEED (Bio-MEG) - PETRONAS Research Sdn. Bhd., 03/2019 ~ 12/2019,
Lead Mechanical Static Engineer
Perform Feasibility Study (FEL) and engineering for Pilot Plant (Bio-MEG)
Perform Technology Selection Report
Provide Total Investment Cost (TIC) for FEED
Provide Technical Specification and Datasheets
Performed Vendor sourcing or market survey for quipment
URETHANE Pre-Polymer Plant (Maintenance), 10/2018 ~ 03/2019,
Mechanical Static Engineer
Perform detailed engineering for equipment replacement
Support engineering activity and construction
RAPID Steam Cracker Complex (SCC) - Pre-Comm., 02/2018 ~ 12/2019,
Mechanical Internal Column Tray Inspector
Performed Inspection for All Column Internal under pakcage 5 - Steam Cracker Unit (SCC).
Verified Column Internal installation and provide finding report
Ensure column internal installation meet design requirement and process requirement.
PCML RE- UPV - Engineering Services, 06/2017 ~ 10/2017,
Mechanical Static Engineer
Performed reverse engineering for PETRONAS Chemicals Methanol (Labuan) Sdn. Bhd
Collect all data for listed equipment without detail drawing.
Performed site measurement and collect all UTTM report.
Prepare design calculation and produce detail drawing
Drawing shall meet DOSH requirement for re-approval and endorsement.
Total 33 Nos. equipment to perform reverse engineering.
Engineering Services for MST Flare (Synthomer Sdn Bhd), 04/2017 ~ 06/2017,
Mechanical Static Engineer
Assist detail engineering stage (review flare package design)
Provide engineering drawing of knock out drum for purchase.
Urethane Prepolymer Plant Expansion -EPCC (COSMO Scientex (M) Sdn Bhd), 04/2016 ~ 08/2017,
Mechanical Engineer - Static
Performed detail engineering for heat exchanger (STHE & PHE) and storage tank.
Involved in shop fabrication inspection.
Support Construction & Installation at site RAPID Steam Cracker Complex (SCC) - EPCC, 05/2015 ~ 11/2016,
Mechanical Static Engineer
Performed Design & detailed engineering of static equipments :-
- 19 Nos. Shell and Tube Heat Exchanger
- 4 bays of Air Fin Cooler
Review and checking vendor detail drawing & calculation
Prepare Mechanical Datasheets (EDRS)
Monitoring equipment fabrication status
Attend weekly meeting with Toyo-J and Toyo global.
Prepare equipment loading data to civil.
Inter-discipline checking and coordination meeting
MTBE RE- UPV - Engineering Services, 03/2016, 12/2016,
Mechanical Static Engineer
Performed reverse engineering for PETRONAS MTBE Sdn. Bhd
Collect all data for listed equipment without detail drawing.
Performed site measurement and collect all UTTM report.
Prepare design calculation and produce detail drawing
Drawing shall meet DOSH requirement for re-approval and endorsement.
Total 53 Nos equipments for reverse engineering - Phase 1
Total 25 Nos equipments for reverse engineering - Phase 2
Expansion Project E305 - EPCC, 08/2015 ~ 02/2016,
Mechanical Engineer
Assist detailed engineering for 1 bay Air Fin Cooler.
Review vendor detail drawing and calculation.
Review vendor thermal detail design.
Support construction for AFC running test.