

Dynamic and results-driven professional with extensive experience at Schlumberger, excelling in drilling and completions. Proven track record in integrated project management and risk analysis, leading teams to minimize non-productive time by 22%. Adept at training evaluation and course development, fostering collaboration to achieve operational excellence.
-Well Site Leader on LSTK, Deep Drilling gas wells in Ghawar Gas project in Saudi Arabia.
- Enforce Schlumberger standards and promote contractor HSE culture to match HSE performance and meet the client HSE requirement, Prepare rig for frequent and various client audit .
- build rig site team to drill and deliver wells with in plan time/ budget, Minimize NPT and get SLB best practices implemented.
- Drill 18000-19500 ft gas well ( Vertical and horizontal ) and deliver them on planned time.
- Drill gas wells through Jilh formation with potential water flow with kill mud up to 148 PCF (20 ppg).
- Drill gas wells through Arabs formation with potential total losses/ Kick.
- Drill Horizontal well - 5 7/8" Slim hole - on minimum horizontal stress direction and run 4 1l2" MSF (6-8 stage).
- Successfully started rig in time with 100% closure of critical and Major action items.
PRISA Project Maracaibo Lake, Venezuela West ALIAVEN Project Orinoco Belt, Venezuela East Mesozoico, Alianza and Tertiary Projects, Villahermosa-Veracruz, Mexico South Ocultun Project, City Peten, Guatemala Taguay Project, Orinoco Belt, Venezuela East PetroPiar Project, Orinoco Belt, Venezuela East RDG-ABH Projects, India-Barmer Awali Project, Kingdom of Bahrain, Awali Field
Citizenship: Venezuelan