Summary
Overview
Work History
Education
Skills
Timeline
Generic

Lee Yau Bing

Technical Manager
Kajang

Summary

Experienced with optimizing tooling operations and driving manufacturing excellence. Utilizes advanced problem-solving skills to enhance production workflows and implement cost-effective solutions. Strong understanding of team leadership and quality control in fast-paced environment.

Overview

23
23
years of professional experience
4
4
years of post-secondary education

Work History

Technical Manager

Pacestar Industries (Selangor) SDN BHD
12.2017 - Current
  • Review and study new project part process layout
  • Workout metal part tooling cost
  • Review tooling fabrication cost
  • Sketch and release drawing for tooling component fabrication
  • Review out sourced tooling design before tooling kick off
  • Get involved in existing tooling improvement activities
  • Review and control tool room expense

Senior Lead Engineer (Components & Services)

Hwa Sun (Guangdong) Co., Ltd
06.2016 - 11.2017
  • Get involved in overseas project feasibility study stage
  • Get involved in overseas project tooling development, tooling testing
  • Sketch and review strip layout
  • Support on optimization of tooling structure to increase production output for motor part

Design and Engineering Assistant Manager

Allied Hori Sdn Bhd
04.2015 - 06.2016
  • Study customer drawing
  • Workout tooling cost based on monthly output quantity
  • Prepare proposal of part change for the best of manufacturing
  • Responsible to workout tooling fabrication schedule to meet customer deadline
  • Responsible to workout tooling layout, tooling design and generate detailing of part drawing for tooling fabrication
  • Responsible to distribute all fabrication work to supplier or in-house
  • Follow-up on tool testing
  • Continue improvement of tool performance to increase productivity, reduce rejection rate
  • Assist to improve shop floor work flow, ISO system

Design and Engineering Assistant Manager

Pacestar Industries SDN BHD
11.2013 - 04.2015
  • Responsible in new tooling discussion with customer, including technical discussion, project schedule, lead time
  • Review sub-con tooling design to ensure tooling process suits to the best for manufacturing
  • Assist to source new tooling sub-con supplier and evaluate supplier capability
  • Continue improvement on existing running tool
  • Improve tooling productivity and reduce rejection of production
  • Assist to develop new customer
  • Assist to study process layout and prepare part costing for new project quotation purpose
  • Assist to research and develop new process or new technology for new business segment

Tool and Die (metal stamping) Design Engineer

MSMM Electronics SDN BHD
10.2012 - 11.2013
  • Responsible in tool quotation for new project, customer modification of existing tool, overhaul of end-life tooling
  • Review of new tool layout
  • Prepare drawing for design improvement after feedback from tool maintenance department
  • Prepare drawing for overhaul tool purpose
  • Generate of Vendor drawing from customer drawing for internal part buy-off purpose

Tool and Die (metal stamping) Design Engineer

AE Technology SDN BHD
01.2002 - 10.2012
  • Study customer part drawing, involve in technical discussion with customer and highlight critical dimension, e.g., too tight tolerance and request open spec if it is a non-functional point, or special rigid tool required in order to achieve customer need
  • Propose changes of customer part if the part is difficult or not suitable for manufacturing (DFM – die for manufacturing)
  • Advice alternate change which create long lasting life, but still actually meet customer requirement
  • Use CAD-CAM software (Excess Evolution) as tool to workout blank development, strip layout (or process layout) within quotation size and tooling price
  • Guide junior in tooling design, and make sure the tooling design meet the given lead time
  • Also involve in tooling design and assist in detailing all the tooling components if very tight lead time is required
  • Support machining work e.g
  • Milling, CNC, Grinding, Wire cut etc
  • Whenever they have any question, and help to simplify machining work by changing component design
  • Immediately issue drawing if machining mistake occur, so that make sure everything is not behind schedule
  • Follow up with assembly site and make sure all the things exactly follow tooling design spec
  • Follow up with tooling testing, and make sure the part has no any issue, e.g
  • Relief missing, high burr, part feeding, and so on
  • Discuss with testing people to improve tooling so that it could create a more consistent part, and ease of maintenance in future
  • Involve in immediate design support for in case of die crack from production
  • Deal with superior to find out any best solution with easy and faster way, in order to reduce tooling downtime and prevent any delay customer part

Education

Bachelor of Science - Mechanical Engineering

University of South Alabama
01.1999 - 01.2001

Diploma - Engineering and Applied Science

INTI college
01.1997 - 01.1999

Certificate of Unified Examination - undefined

Tsun Jin High School

SPM - undefined

Tsun Jin High School

Skills

  • Excess Evolution

  • Q-Basic Programming

  • Autocad

  • Microsoft Word

Microsoft Excel

Microsoft PowerPoint

  • SolidWork

Cost estimates

Technical process improvement

Timeline

Technical Manager

Pacestar Industries (Selangor) SDN BHD
12.2017 - Current

Senior Lead Engineer (Components & Services)

Hwa Sun (Guangdong) Co., Ltd
06.2016 - 11.2017

Design and Engineering Assistant Manager

Allied Hori Sdn Bhd
04.2015 - 06.2016

Design and Engineering Assistant Manager

Pacestar Industries SDN BHD
11.2013 - 04.2015

Tool and Die (metal stamping) Design Engineer

MSMM Electronics SDN BHD
10.2012 - 11.2013

Tool and Die (metal stamping) Design Engineer

AE Technology SDN BHD
01.2002 - 10.2012

Bachelor of Science - Mechanical Engineering

University of South Alabama
01.1999 - 01.2001

Diploma - Engineering and Applied Science

INTI college
01.1997 - 01.1999

Certificate of Unified Examination - undefined

Tsun Jin High School

SPM - undefined

Tsun Jin High School
Lee Yau BingTechnical Manager