Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Khairul Nazli Ghazali

Head Of Maintenance/Construction Manager
Port Dickson, Negeri Sembilan,05

Summary

Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success. Strategic Construction Manager with demonstrated success assessing project scope and adhering to deadlines. Safety-conscious and detail-oriented with 10-year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction.

Overview

21
21
years of professional experience
4
4
years of post-secondary education
4
4
Certifications
4
4
Languages

Work History

Head of Maintenance

Waste to Energy Plant (Incinerator)
2 2021 - 07.2024
  • To lead and drive O&M team 4 engineers,12 technicians and 12 Operations.
  • Perform and evaluate plant specific functions related to predictive and preventative maintenance, availability improvements, and cost of production
  • Coordinate and conduct performance, functional, and surveillance testing of plant systems and components
  • Utilize tools and analysis techniques to identify developing equipment issues that might cause future forced outages
  • Provide assistance in development of preventative maintenance and scheduled maintenance activities
  • Plan and execute effective safe plant outages to meet all facility goals
  • Identify and build professional relationships with quality contractors to perform quality work on-time and on budget
  • Driving force for proactive safety culture with all employees and contractors
  • Evaluate equipment failures and assist with Root Cause Analysis to prevent reoccurrence
  • Working closely with Operations Engineer to track facility service hours, equivalent starts and other operating parameters to regularly update Major Maintenance Inspection
  • Assist Plant Manager in developing annual maintenance budgets, Capex and Opex
  • Proficiently utilize CMMS to schedule work, prioritize work orders, maintain inventory, and procure parts and materials
  • Provide coaching, training, and development opportunities for maintenance team to ensure appropriate skill sets are maintained and personnel are qualified
  • Lead in investigation of plant problems, incidents, accidents, and unusual events, and provide analyses, recommendations, reports, and appropriate follow-up plans
  • As assigned, conduct inspections of boilers, pressure vessels, turbine, generator, and auxiliary equipment during forced and annual outages
  • To lead and schedule outage, plant shutdown including preparing budget
  • To organize and manage Operations team to ensure plant is running in good condition without any breakdown.

Construction Manager (Contract)

Turner and Townsend
01.2019 - 01.2021
  • Support project director on daily coordination activities
  • Manage and lead technical, safety policy to construction team and contract workers.
  • To set up processes on-site so that there is robust system on-site to manage RFI's, construction sign-off, site records, site reports, non-conformances, defects, testing and commissioning
  • Comment on Contractors' plans for logistics, construction method and sequence, approvals, mock-ups, samples, site tests, weather records, testing and commissioning
  • To review Contractors' master and subprograms and provide updates on critical issues during site meetings
  • Liaise with construction professionals before construction work started
  • Check that Contractors have necessary government and statutory approvals prior to construction and as required during course of construction
  • To undertake daily and regular site walk rounds and inspections
  • Monitor progress on site for construction and installation
  • Coordinate production and submission of mock-ups and samples
  • Manage site meeting schedule with main Contractors and vendors
  • Make proposals for subcontractors and suppliers
  • Advice on off-site visits and inspections that are required
  • Identify risks and delays and develop solutions for onsite challenges
  • Generate monthly progress reports on all construction activities
  • Handover inspections and consolidation of handover document
  • Review and approve on EOT submission, claims.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.

Senior M&E Engineer (Contract)

MMC GAMUDA KVMRT (PDP SSP) SDN BHD.
01.2017 - 01.2019
  • Review MEPF drawing and specifications developed by consultants for completeness, coordination with other disciplines, construction feasibility, availability of materials and labor, procurement, construction schedule, code compliance and cost
  • Review budget estimates
  • Work with C&C department to prepare comparative cost analyses and approaches to enhance the cost effectiveness of various project
  • Take a lead role in preparing and updating M&E portion of the Master Schedule
  • Assist in developing scope of works and logistic plans
  • Evaluate contractor tender proposals
  • Manage contractors to coordinate all M&E plant, equipment and piping layouts for all trades on a master coordination set of drawing securing the approval of the architects and engineers
  • Monitoring close out of snags raised by consultant and supervise temporary services items at project close out
  • Manage project close out, review as built drawing, secure all guarantees warranties required for acceptance and handover of all MEPF systems
  • Performing inspection for material delivered by suppliers and sub-contractors
  • Ensure the main contractor and sub-contractors are done accordance with the project specifications & approved construction drawing, contract documents, method statement and all applicable standard
  • Testing and commissioning: Firefighting system (Automatic Sprinkler System, Co2 System, FM-200 & Alarm system, External Hydrant Network, Fire pump)
  • Delivered high-quality technical documentation, creating clear and concise operation manuals for end users.
  • Maintained safe working environment, adhering strictly to established safety protocols while executing engineering tasks.

M&E SIOW (Contract)

AECOM
01.2015 - 12.2016

Working closely with clients, main contractors and sub-contractors

  • Apply standards specification provide by clients such as Material work Specifications, Particular Specifications and General Specifications
  • Manage M&E subcontractors' submission of method statements, drawings, materials, samples and work progress
  • Ensure quality of works is achieved and safety regulations have complied
  • Advice RE of all M&E matters, prepare M&E Master Construction Schedule
  • Review M&E Design Drawings and advise on any under provisions and over provisions
  • Able to pick up discrepancies between M&E and Client provisions
  • Facilitated team, main contractor and sub-contractor's meetings effectively, held regular status meetings with project team and kept project team well informed of changes within organization and general corporate news among HQ, Team & Sub-contractors
  • To monitor site activities including overseeing implementation of method statement and HSE procedure
  • Monitor site progress and verify that works are in progress as per approved program, drawings, material and specifications
  • Check and review contractor's daily progress report
  • Check and verify all coming materials before use or issue at site
  • Liaise with contractors on issues related to change controls
  • To carry out inspection of works and construction supervision
  • Provide support in compilation of reports prepared by WPC
  • Carry out inspection of defects and outstanding works at completion of contract with punch list/defect list and RFI
  • Review and comment on WPC's method statement and material submitted
  • Prepare monthly reports on progress and quality of work
  • Assist HSE department to submit progress, technical, accident, quality, and special reports as required
  • Supervise and monitoring testing and commissioning of mechanical and electrical systems and equipment and verify testing and commissioning procedure including FAT
  • Participate in joint inspection with relevant parties for purpose of handing over works to MRT group
  • Prepare certificate of completion of making good defect to be issued by MRT Corporation or their agent and submit same for verification and endorsement.

Project Coordinator

Messier Bugatti Dowty
07.2012 - 12.2014
  • Developed comprehensive project plans, outlining scopes, timelines, deliverables, and milestones.
  • Planning and scheduling work based on Recovery program or Baseline program
  • Coordinates with Client / Consultant's representatives for any site instructions, assign targets for accomplishments and ensure targets are met on Weekly / daily basis for all MEP services at site
  • Prepared meeting agendas and minutes for distribution and record keeping.
  • Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required
  • Monitoring close out of snags raised by consultant and supervise temporary services items at project closeout
  • Preparing cost proposals for Variation works
  • Managed budgets effectively, ensuring resource allocation was optimized for maximum project success.
  • Review and reporting as required on internal audit reports
  • Facilitated frequent progress reports and presentations to keep management informed about ongoing activities within their respective domains.
  • Estimates prepares and assigns various resources such as manpower, materials, consumables, equipment and tools, etc., required for all MEP and related works prior to execution
  • Ensuring that As-Built Drawings, layout drawings, O&M Manuals, method of statements, Bills of Material and other related documentation is prepared and submitted in a timely manner in line with the contract
  • Coordinate subcontractor and external suppliers for technical submittal requirements
  • Interprets construction drawings and studies contract documents and applicable standards or specifications prior to execution of any jobs
  • Testing and commissioning: Firefighting system (Automatic Sprinkler System, Co2 System, FM-200 & Alarm system, External Hydrant Network, Fire pump)
  • Supervision of plumbing and drainage installation, Inspection, pressure testing, leak test, Site modification as required at site condition, discuss & finalize with clients for the changes required at site.

Technical Supervisor 2

Port Dickson Power (Sime Darby)
05.2005 - 06.2012

Plan all maintenance preventive maintenance (PM) programs, corrective maintenance (CM) programs and execute plan timely manner

  • Monitoring plant performance against approved targets on day-to-day basis
  • Plan all reliability inspections are required to support maintenance intervention
  • Work in close co-operation with technology support in priority improvement proposal and it is responsible operation team's acceptance of solution
  • Support identification and implementation of specific projects to improve safety, reliability, efficiency, operation, and plant capacity
  • Review and provide input weekly/monthly operating plan and support long-term strategic plan to management
  • Evaluate and prepare tenders for shutdown, project improvement and any maintenance jobs need
  • Receive, review and analyses vendor's and contractor's quote
  • Monitoring expediting activities and coordinate (FAT) factory acceptance test and (SAT) site acceptance test
  • Assist procurement manager with procurement activities including order parts, receiving, and testing
  • Assist DOSH with yearly inspection of vessel, tank
  • To make sure technician has permit to work and provide JSA and HIRAC
  • Undertaking any assignment or projects for improvement plans
  • Assist in shutdown preparation by setting work scope, shutdown activities, start-up procedure, and environmental issues
  • Planning and organizing any testing activities such puff test, blackout test, fire alarm test
  • Involved in 6-sigma project
  • Enforcement of safety standard and procedure through this issuance of safety documents
  • Implement company policy and HSE to ensure LTI is zero
  • Providing support for abnormal operating situations and incident investigations.
  • Participate in BIO Gas project (1MW) in Bukit Pasir Muar Johor starting on Engineering until completion.

Technical Specialist

Western Digital (M) Sdn Bhd
01.2000 - 04.2005
  • Setup and do preventive maintenance on a production machine
  • Troubleshoot, repair and inspection all the machines including software and hardware
  • Identify the major issue and provide to maintenance engineer with the solution
  • Align the server writer machine
  • Minimize major down due to production target
  • Involved all new machines set up for production
  • To coordinate and manage technicians
  • Calibration gauge and installation of Keyence and Omron products
  • Working in a clean room environment.
  • Support the engineering team to setup 1 unit manufacturing plant in Navanakhorn Bangkok.

Education

Master of Management - Management

Asia E University
Kuala Lumpur
05.2014 - 04.2016

Higher Diploma in Electrical and Electronic Engineering - Engineering

University Kuala Lumpur
Kuala Lumpur
01.1998 - 04.2000

Skills

Problem Solving

Time Management

Organized

Multitasking

Project Management

Construction Projects

Quality Control

Health and safety compliance

Asset Management

Equipment Inspection

Creative Thinking

Decision-Making

Team Coordination

Organizational Skills

Preventive Maintenance

Safety Protocols

Certification

AGT, NIOSH, 09/2019

Timeline

Construction Manager (Contract)

Turner and Townsend
01.2019 - 01.2021

Senior M&E Engineer (Contract)

MMC GAMUDA KVMRT (PDP SSP) SDN BHD.
01.2017 - 01.2019

M&E SIOW (Contract)

AECOM
01.2015 - 12.2016

Master of Management - Management

Asia E University
05.2014 - 04.2016

Project Coordinator

Messier Bugatti Dowty
07.2012 - 12.2014

Technical Supervisor 2

Port Dickson Power (Sime Darby)
05.2005 - 06.2012

Technical Specialist

Western Digital (M) Sdn Bhd
01.2000 - 04.2005

Higher Diploma in Electrical and Electronic Engineering - Engineering

University Kuala Lumpur
01.1998 - 04.2000

Head of Maintenance

Waste to Energy Plant (Incinerator)
2 2021 - 07.2024
AGT, NIOSH, 09/2019
Basic Scaffold License, NIOSH
Malaysia CIDB Construction Personnel Card (Green Card), CIDB, Current
AESP for Confined Space, NIOSH, 03/2016
Khairul Nazli GhazaliHead Of Maintenance/Construction Manager