Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level technical team leader position. Ready to help team achieve company goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
1-Overhoul,trouble shooting,Repair and commissioning Genset(all Brand)
SITE
-Permint,MBKT,Pulau kapas,Pulau redang,tasik Kenyir Resort,house Boat,101 island langkawi,
Menara pemancar petronas bukit jerong,marang,Balai polis seluruh terengganu,klinik rantau
petronas,Petronas RO,Klinik petronas Paka,
2-Overhoul,trouble shooting ,repair and commissioning pump
SITE
-Wisma permint,Wisma darul iman,MBKT,JBA(Logi air Padng air)(loji air setiu),unisza kuala
terengganu,seluruh sekolah kuala terengganu(pump kumbahan)
3-HVAC,Chiller system,VRF system
-SITE
Asrama sukan gong badak
-Installation the new VRF system all including work,Piping installation,split unit,package unit, wiring
and outdoor lifting and installation
-Including braezing works,welding brackect,lifting indoor outdoor,flushing pipe,leak test pipe,jacketing
pipe complete form injection and all electrical works,
-All monitoring workers,planning,Report and all progress meeting
-Testing and commissioning unit.
-Hand over with clien
BASF PETRONAS CHEMICAL(2014)
FABRICATE, CUSTUM MAKE,AND SUPPLY EX
ENERLYZER HOUSE PACKAGE UNIT C/W INSTALL AND COMMISSIONING UNIT
Custom new EX HVAC package unit 30hp
Analyzer house
-Design new unit
-Calculate cooling calculation for building house
-Fabricate indoor and outdoor unit.
-Fabricate evep and condensing unit
-Oder Ex new compressor and all accessories
-Install compressor,piping circuit,condessing evaporator and all accessories
-vacuum flushing charging and testing unit
-Install unit at site
-Testing and commission unit
SHELL MALAYSIA:
Gemusuk Kakap (Sabah offshore)
2016-Evolusi Bersatu
To responsible for site visit to rectification ,modification and upgrading the HVAC system & prepare the paper work.
To Check All the hvac System, exhaust fan, Ducting layout
CONOCO PHILLIPS
Kekembangan platform (sabah offshore)
-Responsible Replacement a new EX HVAC for tower crane
-Plan to lifting the new HVAC 10 meter height weigh 120kg/1set x2 set
-Laying new wiring
-Installation and commissioning system
-Hand over unit to client
INSTALLATION AND
COMMISSIONING OF NEW AIR
CONDITIONING SYSTEM (AIR
COOLED CHILLER PACKAGE)
PETRONAS GAS BERHAD
REPLACEMENT/UPGRADING OF
COOLING TOWER AND CHILLED
WATER PIPING FOR KOP BUILDING,PCSB
HL ENGINEERING (M) SDN BHD, LUMUT
REPLACEMENT AND REPAIR OF
PORTABLE CHILLER FREEZER
KSB ,KEMAMAN TERENGGANU
TROUBLESHOOTING
,INSTALLATION NEW
COMPRESSOR FOR SHIPPING
CHILLER FREEZER
MURPHY OIL N GAS ,MIRI,SARAWAK
INSTALL & COMMISSIONING
CABIN SPILT UNIT 5 (NOS)
AKER SOLUTION OIL N GAS ,LABUAN
SUPPLY & INSTALL FAN COIL UNIT
7 UNITS
LNG OIL N GAS ,BINTULU SARAWAK
REPLACE CONDENSSOR COIL
AIRCOLD CHILLER & RECTIFY
(BUILDING CHILLER)
PETRONAS CUF
MAIN CONT:TRIPLE PLUS GLOBAL
RECTIFY BUIDING AURCOND
,REPLACE COMPRESSOR &
REPLACE INDOOR UNIT
EASTMAN GEBENG
MAIN CONT:ACMVE
Dec 2012
REPLACE AIR COLD PACKAGE UNIT
SUB INERLYZER ROOM
POLYETHYLENE
MAIN CONT:ALAM DINGIN
Jan 2013
REPLACE FCU UNIT & REPLACE
CHILLER COOLING TOWER 200TON
PETRONAS GAS GPPA
MAIN CONT:TRIPLE PLUS GLOBAL
Jan 2013
REPLACE CONDENSSOR SPLIT UNIT
& RECTIFY LIEBERT AC UPS ROOM
PETRONAS KIPC
MAIN CONT:ACMVE
Jan 2013
REPLACE COMPRESSOR CARLY
OPEN TYPE 30HP PACKAGE UNIT
LHDN PERMIT BUILDING KUALA TERENGGANU
MAIN CONT:MDW
Feb 2013
SUPPLY & INSTALL ULTRA VIOLET
LAMP UV FOR COVEYER SISTEM
MARDI KUALA TERENGGANU
MAIN CONT:ANSR
Jan 2013
REPLACE & INSTALL FCU UNIT AT
ALL SUBSTATION ROOM
PETRONAS MLNG BINTULU
MAIN CONT:DINATIC
April 2013
INSTALL AIR QUALITY SYSTEM
(SUNVOX)
MUZIUM TERENGGANU
MAIN CONT:ANSR
May 2013
CHECK & RECTIFY GENSET AT
KERTIH LOGED APARTMENT
PERMINT
MAIN CONT:MDW
May 2013
INSTALL 30HP PACKAGE UNIT AT
CONTROL ROOM
PETRONAS VCM
MAIN CONT:HVAC EXPERT
Dec 2012
RECTIFY HVAC UNIT
PETRONAS CARIGALI BOKOR A MIRI
MAIN CONT:ALAM DINGIN
March 2013
RECTIFY CHILLER FREZZER UNIT
PETROFAC BERANTAI PLATFORM
MAIN CONT:HVAC EXPERT
July 2013
SITE SURVEY FOR REPLACE FIRE
DAMPER TURBINE ROOM
EXXONMOBIL GUNTUNG D,JERNIH A, & SELIGI A
MAIN CONT:ENRO ANALISA
July 2013
No Scope of Work Clients
RECTIFY & DISMENTLE POWER
CABLE HVAC UNIT FOR REPLACE
NEW UNIT
EXXONMOBIL .GUNTUNG C.
MAIN CONT:ALAM DINGIN
June 2013
RECTIFY CONTAINER HVAC UNIT
MURPHY OIL ,LABUAN DIMOND MOPU
MAIN CONT:HVAC EXPERT
Jan 2013
SITE SURVEY & RECTIFY CHILLER
FRIZER PROBLEM
EXXONMOBIL LAWIT
MAIN CONT:ALFA MELLI
Aug 2013
SITE SURVEY & RECTIFY CHILLER
FRIZER PROBLEM
EXXONMOBIL
MAIN CONT:BAYAM
Oct 2013
RECTIFY CHILLER FRIZER
PROBLEM
KENCANA GERSIA
MAIN CONT:TRIPLE PLUS
Oct 2013
RECTIFY HVAC PROBLEM
KENCANA KM1
MAIN CONT:HVAC EXPERT
Aug 2013
SITE SURVEY & RECTIFY CHILLER
FRIZER PROBLEM
EXXONMOBIL
MAIN CONT:BAYAM
Oct 2013
RECTIFY HVAC PANEL & CHILLER
FRIZER PANEL PROBLEM
MSET KAPAL AISYAH 1
MAIN CONT:HVAC EXPERT
Nov 2013
INSTALL HVAC PANEL & CHILLER
FRIZER PANEL TESTING
COMMISIONING
MSET KAPAL AISYAH 2&3
MAIN CONT:HVAC EXPERT
Oct 2013
INSTALL ENERLYZER HOUSE UNIT PACKAGE
C/W TESTING & COMMISSIONING
GPP 5,6,PETRONAS GAS BERHAD
MAIN CONT: ALAM DINGIN
2014
INSTALL UNIT PACKAGE SUBSTATION
C/W TESTING & COMMISSIONING
GPP 5,6,PETRONAS GAS BERHAD
MAIN CONT: ALAM DINGIN
2014
Computer Literacy Microsoft Office, Microsoft word, Microsoft Power Point, Microsoft Excel,& Auto Cad Air Conditioning selection software Technical Literacy Skill in servicing automotive air conditioning, Automotive wiring, overhaul compressor(open type compressor), selection and installation unit, electrical wiring , cooling load calculation, draw schematic electrical wiring and industrial design