Summary
Overview
Work History
Education
Skills
Timeline
Generic
KHAIRUL ANUAR IBRAHIM

KHAIRUL ANUAR IBRAHIM

Electrical And Mechanical Supervisor
Lot 80 Kampung Padang Jirat,jalan Pulau Musang,Kuala Terengganu

Summary

Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level technical team leader position. Ready to help team achieve company goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

18
18
years of professional experience
5
5
years of post-secondary education

Work History

Electrical and Mechanical Team Leader

AWADA MAJU
kuala terengganu
01.2021 - Current
  • Proven ability to develop and implement creative solutions to complex problems.
  • Skilled at working independently and collaboratively in a team environment.
  • Paid attention to detail while completing assignments.
  • Adaptable and proficient in learning new concepts quickly and efficiently.

1-Overhoul,trouble shooting,Repair and commissioning Genset(all Brand)

SITE

-Permint,MBKT,Pulau kapas,Pulau redang,tasik Kenyir Resort,house Boat,101 island langkawi,

Menara pemancar petronas bukit jerong,marang,Balai polis seluruh terengganu,klinik rantau

petronas,Petronas RO,Klinik petronas Paka,

2-Overhoul,trouble shooting ,repair and commissioning pump

SITE

-Wisma permint,Wisma darul iman,MBKT,JBA(Logi air Padng air)(loji air setiu),unisza kuala

terengganu,seluruh sekolah kuala terengganu(pump kumbahan)

3-HVAC,Chiller system,VRF system

-SITE

Asrama sukan gong badak

-Installation the new VRF system all including work,Piping installation,split unit,package unit, wiring

and outdoor lifting and installation

-Including braezing works,welding brackect,lifting indoor outdoor,flushing pipe,leak test pipe,jacketing

pipe complete form injection and all electrical works,

-All monitoring workers,planning,Report and all progress meeting

-Testing and commissioning unit.

-Hand over with clien

Hvac Supervisor Offshore

Unipetro Engineering Sdn Bhd
Miri,Sarawak
07.2017 - 12.2020
  • Acted as a team leader in group projects, delegating tasks and providing feedback.
  • Developed and maintained courteous and effective working relationships.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Responsible as monthly maintenance service, electrical wiring and mechanical work.
  • To trouble shooting the refrigeration and air conditioning system.,Air cool package unit EX, all the EX split unit, and responsible to control the Building Automation System (BAS) system.
  • Responsible for prepare all paper work, monthly service report and summary report

HVAC Projects Engineer

SESCCO ENGINEERING & SUPPLY SDN BHD
Kuantan Pahang
06.2014 - 05.2017
  • Prepared reports and studies to resolve open technical issues.
  • Designed HVAC systems and specified components for successful installation and operation.
  • Compiled operational, performance and safety data on HVAC and support systems.
  • Drafted system and equipment designs using CAD software.

BASF PETRONAS CHEMICAL(2014)

FABRICATE, CUSTUM MAKE,AND SUPPLY EX

ENERLYZER HOUSE PACKAGE UNIT C/W INSTALL AND COMMISSIONING UNIT

Custom new EX HVAC package unit 30hp

Analyzer house

-Design new unit

-Calculate cooling calculation for building house

-Fabricate indoor and outdoor unit.

-Fabricate evep and condensing unit

-Oder Ex new compressor and all accessories

-Install compressor,piping circuit,condessing evaporator and all accessories

-vacuum flushing charging and testing unit

-Install unit at site

-Testing and commission unit

SHELL MALAYSIA:

Gemusuk Kakap (Sabah offshore)

2016-Evolusi Bersatu

To responsible for site visit to rectification ,modification and upgrading the HVAC system & prepare the paper work.

To Check All the hvac System, exhaust fan, Ducting layout

CONOCO PHILLIPS

Kekembangan platform (sabah offshore)

-Responsible Replacement a new EX HVAC for tower crane

-Plan to lifting the new HVAC 10 meter height weigh 120kg/1set x2 set

-Laying new wiring

-Installation and commissioning system

-Hand over unit to client

HVAC Specialist

Free lancer
malaysia
12.2012 - 05.2014
  • Maintained environmental conditions by rebuilding and replacing faulty components.
  • Connected heating or air conditioning equipment to water, fuel, or refrigerant sources to form complete circuits.
  • Discussed heating and cooling system malfunctions with customers to isolate problems and verify corrected malfunctions.
  • Assembled air ducts, pipes, discharge valves and flues to central heating and cooling equipment.

INSTALLATION AND

COMMISSIONING OF NEW AIR

CONDITIONING SYSTEM (AIR

COOLED CHILLER PACKAGE)

PETRONAS GAS BERHAD

REPLACEMENT/UPGRADING OF

COOLING TOWER AND CHILLED

WATER PIPING FOR KOP BUILDING,PCSB

HL ENGINEERING (M) SDN BHD, LUMUT

REPLACEMENT AND REPAIR OF

PORTABLE CHILLER FREEZER

KSB ,KEMAMAN TERENGGANU

TROUBLESHOOTING

,INSTALLATION NEW

COMPRESSOR FOR SHIPPING

CHILLER FREEZER

MURPHY OIL N GAS ,MIRI,SARAWAK

INSTALL & COMMISSIONING

CABIN SPILT UNIT 5 (NOS)

AKER SOLUTION OIL N GAS ,LABUAN

SUPPLY & INSTALL FAN COIL UNIT

7 UNITS

LNG OIL N GAS ,BINTULU SARAWAK

REPLACE CONDENSSOR COIL

AIRCOLD CHILLER & RECTIFY

(BUILDING CHILLER)

PETRONAS CUF

MAIN CONT:TRIPLE PLUS GLOBAL

RECTIFY BUIDING AURCOND

,REPLACE COMPRESSOR &

REPLACE INDOOR UNIT

EASTMAN GEBENG

MAIN CONT:ACMVE

Dec 2012

REPLACE AIR COLD PACKAGE UNIT

SUB INERLYZER ROOM

POLYETHYLENE

MAIN CONT:ALAM DINGIN

Jan 2013

REPLACE FCU UNIT & REPLACE

CHILLER COOLING TOWER 200TON

PETRONAS GAS GPPA

MAIN CONT:TRIPLE PLUS GLOBAL

Jan 2013

REPLACE CONDENSSOR SPLIT UNIT

& RECTIFY LIEBERT AC UPS ROOM

PETRONAS KIPC

MAIN CONT:ACMVE

Jan 2013

REPLACE COMPRESSOR CARLY

OPEN TYPE 30HP PACKAGE UNIT

LHDN PERMIT BUILDING KUALA TERENGGANU

MAIN CONT:MDW

Feb 2013

SUPPLY & INSTALL ULTRA VIOLET

LAMP UV FOR COVEYER SISTEM

MARDI KUALA TERENGGANU

MAIN CONT:ANSR

Jan 2013

REPLACE & INSTALL FCU UNIT AT

ALL SUBSTATION ROOM

PETRONAS MLNG BINTULU

MAIN CONT:DINATIC

April 2013

INSTALL AIR QUALITY SYSTEM

(SUNVOX)

MUZIUM TERENGGANU

MAIN CONT:ANSR

May 2013

CHECK & RECTIFY GENSET AT

KERTIH LOGED APARTMENT

PERMINT

MAIN CONT:MDW

May 2013

INSTALL 30HP PACKAGE UNIT AT

CONTROL ROOM

PETRONAS VCM

MAIN CONT:HVAC EXPERT

Dec 2012

RECTIFY HVAC UNIT

PETRONAS CARIGALI BOKOR A MIRI

MAIN CONT:ALAM DINGIN

March 2013

RECTIFY CHILLER FREZZER UNIT

PETROFAC BERANTAI PLATFORM

MAIN CONT:HVAC EXPERT

July 2013

SITE SURVEY FOR REPLACE FIRE

DAMPER TURBINE ROOM

EXXONMOBIL GUNTUNG D,JERNIH A, & SELIGI A

MAIN CONT:ENRO ANALISA

July 2013

No Scope of Work Clients

RECTIFY & DISMENTLE POWER

CABLE HVAC UNIT FOR REPLACE

NEW UNIT

EXXONMOBIL .GUNTUNG C.

MAIN CONT:ALAM DINGIN

June 2013

RECTIFY CONTAINER HVAC UNIT

MURPHY OIL ,LABUAN DIMOND MOPU

MAIN CONT:HVAC EXPERT

Jan 2013

SITE SURVEY & RECTIFY CHILLER

FRIZER PROBLEM

EXXONMOBIL LAWIT

MAIN CONT:ALFA MELLI

Aug 2013

SITE SURVEY & RECTIFY CHILLER

FRIZER PROBLEM

EXXONMOBIL

MAIN CONT:BAYAM

Oct 2013

RECTIFY CHILLER FRIZER

PROBLEM

KENCANA GERSIA

MAIN CONT:TRIPLE PLUS

Oct 2013

RECTIFY HVAC PROBLEM

KENCANA KM1

MAIN CONT:HVAC EXPERT

Aug 2013

SITE SURVEY & RECTIFY CHILLER

FRIZER PROBLEM

EXXONMOBIL

MAIN CONT:BAYAM

Oct 2013

RECTIFY HVAC PANEL & CHILLER

FRIZER PANEL PROBLEM

MSET KAPAL AISYAH 1

MAIN CONT:HVAC EXPERT

Nov 2013

INSTALL HVAC PANEL & CHILLER

FRIZER PANEL TESTING

COMMISIONING

MSET KAPAL AISYAH 2&3

MAIN CONT:HVAC EXPERT

Oct 2013

INSTALL ENERLYZER HOUSE UNIT PACKAGE

C/W TESTING & COMMISSIONING

GPP 5,6,PETRONAS GAS BERHAD

MAIN CONT: ALAM DINGIN

2014

INSTALL UNIT PACKAGE SUBSTATION

C/W TESTING & COMMISSIONING

GPP 5,6,PETRONAS GAS BERHAD

MAIN CONT: ALAM DINGIN

2014

Senior Hvac Supervisor

Alam Dingin Eng. (M) Sdn Bhd
Kemaman,Terengganu
05.2007 - 12.2012
  • Learned and adapted quickly to new technology and software applications.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Developed strong organizational and communication skills through coursework and volunteer activities.
  • Resolved problems, improved operations and provided exceptional service.
  • Responsible for daily, monthly, and yearly report, attend breakdown air cond unit.
  • Work Leader for installation 2 unit cooling tower of block B & 2 unit block A.To wiring electrical parts and Electrical Distribution board for cooling tower at complex operation petronas, complete with testing and commissioning .
  • Supervise the installation of 22nos water cool package unit complete with electrical wiring, installation of Distribution board for package unit, testing and commissioning the unit at complex operation petronas carigali.
  • Attend meeting and site inspection for new project.Work leader for project installation of Chiller at roof top building K.O.P carigali. Submitted all report regarding all attach activities at KOP to petronas carigali sdn bhd personal.To carry out daily activities package unit,chiller and cooling tower servicing at KOP.Familiar to handle the three phase electrical moto, mechanical equipment and electrical schematic diagram.
  • To prepare work permit and attend break down at Terengganu Cruse Oil Teminal (TCOT) and OSC petronas plan and KSB. As a work leader to installed Potable unit to back up air-cond in OSC control room and to check unit problem for OSC, prepare equipment and spare part to repair the unit back to normal.
  • Carigali Offshore Site project: Responsibility for cover all the carigali offshore platform for servicing HVAC job.
  • Tinggi A Platform: Responsibility for settle break down to repair freezer malfunction, trouble shoot all electrical & mechanical equipment. Installation 1 nos chiller compressor 15hp complete with replace new piping, filter drier, txv & trouble shoot all electrical problem for the same unit..Responsible as maintenance service, installation air conditioning, electrical wiring and mechanical work. To trouble shooting the refrigeration and air conditioning system,Air cool package unit EX, all the EX split unit, and responsible to control the Building Automation System (BAS) system.To prepare all service report for all the job & attend meeting
  • Tion A Platform: Trouble shooting foot chiller & freezer malfunction, check all electrical & mechanical part & replace part no function for back to normal. To check & repair air cool package 20hp leaving quarters, replace discharge service valve leaking.
  • Duyong platform : As the leader in project & responsible for prepare job report, work permit. To Replace Evaporator coil for air cold package unit 40hp Explosion proof unit, replace the suction eliminator, Replace filter block complete with flushing suction & discharge piping with nitrogen gas for cleaning piping inside. Trouble shoot unit malfunction & check, record room temperature for unsure same the thermostat setting.
  • Abu Cluster A Platform: Responsible as monthly maintenance service, electrical wiring and mechanical work. To trouble shooting the refrigeration and air conditioning system,Air cool package unit EX, all the EX split unit, and responsible to control the Building Automation System (BAS) system.
  • Bekok C Platform: As the leader in project & responsible for prepare job report, work permit.To responsible for install new ac ceiling expose 5hp complete with lay cable 200meters from ccr room for power supply and weld support breaket for indoor unit. To install DB power for unit.
  • New Field Exploration ltd:Belumut A Platform: As the leader in project & responsible for prepare job report, work permit. To Replace Evaporator coil for air cold package unit 40hp Explosion proof unit, Replace filter block complete with flushing suction & discharge piping with nitrogen gas for cleaning piping inside. Trouble shoot unit malfunction & check, record room temperature for unsure same the thermostat setting.
  • Pulai A Platform: To perform site server for replacement condensers barrel at Water cool unit 80hp Explosion proof unit.Responsible to prepare project work paper & listing equipment .To prepare planning document & work schedule for the project.
  • Angsi A,B & Andra Platform: Responsible as monthly maintenance service, electrical wiring and mechanical work. To trouble shooting the refrigeration and air conditioning system.Air cool package unit EX, Chiller freezer unit and responsible to control the Building Automation System (BAS) system.To install freezer compressor at LQ galley & Trouble shooting freezer malfunction after testing, check all electrical & mechanical part & replace part no function for back to normal..
  • Carigali Hess Join development company (Malaysia-Thailand)Cekerawala (CKP) To responsible for lead to replacement condenser coil project at CKP LQ unit 120hp & Workshop unit 40hp & prepare the paper work.To dismantle old condenser coil, dismantle body cover and separate the coil at the unit.And after that assemble the new condenser coil at the, join the pipe line in and out coil,Flushing &hold pressure one night for check leakage.Continue the assemble the unit accessories, fan cover & fan motor.Testing and commissioning the unit.
  • New Field Exploration ltd: East Piatu PM329 To responsible for lead to upgrading project rectification & modification All HVAC unit at east piatu & prepare the paper work.To Check All the hvac System, exhaust fan, Ducting layout testing & commissioning For hand over the unit. To Testing & commissioning bactigas system & setting .To monitoring system service & rectify under warranty

Project Executive

IKATAN JATI Sdn Bhd
01.2006 - 05.2007
  • Evaluated project performance and made proactive adjustments to maintain quality and schedule.
  • Created strategic plans to turn leadership mandates into actionable project plans.
  • Built impactful relationships with clients and suppliers.
  • Composed industry research reports to predict competitive behavior and market changes.
  • Responsible for prepare design air conditioning installation diagram, Project management ,Prepare the work paper job cooling load calculation ,drawing auto cad, quotation, ducting design and drawing checking.
  • To attend to site meeting and site inspection project,Responsible to handle project Fully installation Air conditioning system part at the library Klang, project installation air cool package unit complete the electrical work and handle to project installation air conditioning system all building at new consultant project IKM JB.

Building Maintenance Technician

COFRETH (M) SDN BHD
Kuala lumpur
05.2005 - 12.2005
  • Used standard housekeeping equipment, tools, and supplies to accomplish basic cleaning.
  • Completed troubleshooting and diagnostic procedures to diagnose problems with equipment and systems.
  • Inspected buildings, grounds, and equipment for unsafe or malfunctioning conditions.
  • Performed scheduled maintenance on electrical, plumbing, and HVAC systems.
  • Responsible as maintenance service, installation air conditioning, electrical wiring and mechanical work.
  • To trouble shooting the refrigeration and air conditioning system.Service cooling tower ,water cool package unit, all the split unit, and responsible to control the Building Automation System (BAS) system.

Technician Trainer

YOTA Air-conditioning And Refrigeration
kuala lumpur
01.2005 - 05.2005
  • Collaborated with company team leader instructors to implement best practices to enhance student learning.
  • Implemented new educational techniques to boost student comprehension while reducing learning time.
  • Conducted clinical simulations and provided feedback for each individual student.
  • Provided immediate and constructive feedback to students individually and as group.

Education

Heating, Ventilation, Air-Conditioning, And Refrigeration Technology

Institute Kemahiran Mara, Kuala Lumpur
Kuala Lumpur
01.2002 - 06.2003

High School Diploma -

University Kuala Lumpur-Malaysia France Institute
Bangi,selangor
07.2003 - 06.2005

A0 Electrical Chargeman -Suruhanjaya Tenaga

Institut Latihan Perindustrian,gong Badak
Gong Badak,Kuala Terengganu
01.2010 - 07.2011

Skills

    Computer Literacy Microsoft Office, Microsoft word, Microsoft Power Point, Microsoft Excel,& Auto Cad Air Conditioning selection software Technical Literacy Skill in servicing automotive air conditioning, Automotive wiring, overhaul compressor(open type compressor), selection and installation unit, electrical wiring , cooling load calculation, draw schematic electrical wiring and industrial design

undefined

Timeline

Electrical and Mechanical Team Leader

AWADA MAJU
01.2021 - Current

Hvac Supervisor Offshore

Unipetro Engineering Sdn Bhd
07.2017 - 12.2020

HVAC Projects Engineer

SESCCO ENGINEERING & SUPPLY SDN BHD
06.2014 - 05.2017

HVAC Specialist

Free lancer
12.2012 - 05.2014

A0 Electrical Chargeman -Suruhanjaya Tenaga

Institut Latihan Perindustrian,gong Badak
01.2010 - 07.2011

Senior Hvac Supervisor

Alam Dingin Eng. (M) Sdn Bhd
05.2007 - 12.2012

Project Executive

IKATAN JATI Sdn Bhd
01.2006 - 05.2007

Building Maintenance Technician

COFRETH (M) SDN BHD
05.2005 - 12.2005

Technician Trainer

YOTA Air-conditioning And Refrigeration
01.2005 - 05.2005

High School Diploma -

University Kuala Lumpur-Malaysia France Institute
07.2003 - 06.2005

Heating, Ventilation, Air-Conditioning, And Refrigeration Technology

Institute Kemahiran Mara, Kuala Lumpur
01.2002 - 06.2003
KHAIRUL ANUAR IBRAHIMElectrical And Mechanical Supervisor